Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on April 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Term Contract for Substation Maintenance, Repair and Construction

Closed
0828-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new plumbing fixtures and partitions, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, and upgrading lighting controls. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by November 18, 2026, and will be evaluated using a best suited negotiate methodology, where price, past performance, and corporate relevant experience are of equal importance. To be considered, offerors must provide two to four past performance questionnaires for projects completed within the last five years, with at least two projects valued at no less than one million dollars. Contractors are required to provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or three million dollars. Personnel must undergo background checks and adhere to strict security and safety regulations, including DHS and FBI fingerprinting. All work must comply with prevailing wage determinations and sustainability principles, with final acceptance based on government inspections and adherence to the provided technical specifications and drawings.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes and epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Mechanical and electrical upgrades encompass new HVAC systems, rooftop air-handling units, exhaust extraction, compressed air systems, updated electrical distribution, lighting, and building automation controls. Site improvements include paving removal and replacement, drainage upgrades, and hazardous materials abatement. The project is divided into two primary pricing line items: building renovation and paving work. Award will be based on the lowest price, with specific evaluation considerations for Buy American statute compliance. Contractors must adhere to strict technical standards, including MIL-STD-101 for piping and ASME A13.1 for color coding. Bonding requirements are tiered by proposal value, with bid, payment, and performance bonds required for projects 150 thousand dollars and over. Invoicing must be processed through Wide Area Workflow. Key deliverables include a comprehensive submittal register of shop drawings and product data, as well as final operation and maintenance manuals and as-built drawings.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses all site preparations and improvements, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utilities. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for proposals for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work requires the contractor to restore these areas to their original condition through architectural repairs, including drywall replacement, painting, ceiling tile and flooring installation, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA standards, EPA and OSHA regulations, and applicable Massachusetts state and local building codes. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit, provide a detailed cost breakdown, and submit proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Additionally, the contractor must provide a one-year guarantee on workmanship and a 20-year manufacturer warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return sixteen residential rooms, bathrooms, and common areas to safe residential use. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, as well as the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposers must provide detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing that remains firm for 60 days. Award requirements include a minimum one-year workmanship warranty and the provision of payment and performance bonds for the full project value within ten days of award. Additionally, contractors must maintain general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The City of Garland is seeking to establish a term contract for substation maintenance, repair, and construction services, with an expected annual expenditure of up to $10 million. The contract will be awarded to two vendors based on a comprehensive evaluation process that considers price and other factors, with the possibility of requesting a best and final offer after negotiations. The procurement process involves submitting complete bids via the Ion Wave platform, with no faxed or emailed bids accepted. Bidders must respond to three pseudo project scenarios, each requiring site visits and a thorough completion of the GP&L Construction Contractor Questionnaire. The evaluation will combine scores from all three scenarios to identify the top two contractors, who will then be awarded the contracts. The contract duration is one year, renewable up to four additional years, with bonds required only for individual projects as mandated by law. The solicitation emphasizes strict adherence to the City’s standard terms and conditions, safety compliance requirements, and the importance of submitting complete responses for all three project scenarios to remain eligible. Additional documentation includes safety compliance addenda and detailed instructions for bid submission, questions, and site visits. The contract will incorporate the City’s standard terms governing contractual relationships, audit rights, indemnification, and other legal provisions. The process underscores the importance of organized, complete responses and compliance with all procedural requirements to ensure eligibility for award, with the City reserving the right to make awards based on the most advantageous offer considering all evaluation factors.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

14
PDF, High priority: read this firstrfp
High
DOCX, High priority: read this firstrfp
High
XLSX, High priority: read this firstspecifications
High
PDF, High priority: read this first33 pages · terms-and-conditions
High
PDF, High priority: read this first1 page · contract-document
High
DOCX, High priority: read this firstspecifications
High
DOCX, High priority: read this first70 pages · specifications
High
DOCX, High priority: read this firstpast-performance
High
XLSX, High priority: read this firstevaluation-criteria
High
DOCX, High priority: read this firstsow
High
ZIP
ZIP
ZIP
ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Garland
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → Garland
Office AddressN/A
Contacts
Purchasing Manager Teresa Smith

Full Description

Show more
Award must be made to the vendor submitting the most advantageous offer considering the relative importance of price and other evaluation factors. City reserves the right to request a best and final offer upon completion of negotiations. NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response.   All questions must be answered in the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to.  The deadline for submitting questions on this bid is May 28, 2025 at 5:00 p.m.  
This is a Term Contract for one (1) year and four (4) optional renewals. The annual expected expenditure is $10,000,000.00. It is our intention to award two (2) contracts in the amount of $5,000,000.00 each.   This is an evaluated bid, please pay close attention to the GP&L Construction Contractor Questionnaire and provide a complete and organized response.   You will be provided the bid documents for three (3) pseudo projects for Substation work. There will be a mandatory Pre-bid Meeting and three (3) mandatory Site Visits located in Garland, South Texas and West Texas held in association with each project.  The date, location and time of each site visit will be communicated at a later date.
  The evaluation scores for all three (3) pseudo scenarios will be added together and averaged with the contractors receiving the two (2) highest scores being awarded a contract.   You will need to submit a complete response for each bid. Failure to submit a complete response for all three (3) bids will result in your bid being deemed incomplete and therefore non-responsive and you will be ineligible to be awarded the Term Contract.   Any additional required pricing is for informational purposes only and will not be factored into your evaluated score.     Please acknowledge the City of Garland Terms and Conditions in the "Attributes" section.    
Bonds will not be required for the Term Contract itself, but bonds will be required before the start of each individual project as determined by Statutory requirements.  
   
     

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS