Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terminal 2 West Sidewalk and Crosswalk Improvements

Closed
104265FCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive improvements to the sidewalk and crosswalk infrastructure at Terminal 2 West, as well as the construction of a pet relief area. The sidewalk replacement project includes demolition, excavation, and the installation of new concrete sidewalks, curbs, pedestrian ramps, striping, LED in-pavement lighting, and railings, all in accordance with detailed drawings and specifications. The crosswalk enhancement entails widening the existing primary crosswalk, grinding and paving asphalt, re-striping, relocating pedestrian signal poles, and installing new traffic control equipment, including controllers and conduits. Additionally, a new pet relief area will be constructed, featuring a wall and footing, gate, turf, water and sewer connections, a pet drinking fountain, pet bag dispenser, and trash receptacles, aimed at improving amenities for arriving passengers. The project is overseen by the San Diego County Regional Airport Authority and is valued between 1.5 and 3 million dollars. The solicitation was posted on April 9, 2025, with a response deadline of May 9, 2025. Interested contractors are directed to contact Ernesto Cabrera via email for further details and can access additional project information through the provided online portal. The work is to be performed in California, with the scope clearly defined to enhance pedestrian safety, accessibility, and passenger convenience at Terminal 2 West.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County Regional Airport Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Ernesto Cabrera

Full Description

Show more
The work includes:Sidewalk Improvements: Replace aging sidewalk in front of Terminal 2 West. The work includes demolition, excavation, installation of new concrete sidewalk, curb, pedestrian access ramps, striping, new LED in-pavement lighting, railings, and all other items as shown on the drawings and specified in the specifications.Crosswalk Improvements: Widening the existing Terminal 2 West primary crosswalk and adjust the crosswalk traffic control system. The work includes grinding and installation of asphalt pavement, re-striping the crosswalk, relocation of two existing pedestrian traffic signal poles, installation of new controller, peace officer panel, conduits, and all other items as shown on the drawings and specified in the specifications.Pet Relief Area: Construction of a Pet Relief Area complete with wall/footing and gate, turf, water/sewer connection, pet drinking fountain, and pet bag dispenser and trash for Terminal 2 arriving passengers’ use.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS