Terminal 25 (T-25) South Habitat Restoration - GC/CM Pre-Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Terminal 25 (T-25) South Habitat Restoration project is a comprehensive environmental remediation and habitat restoration initiative led by the Port of Seattle’s Waterfront Project Management division, with a total site area of approximately 9 to 10 acres. The project involves a CERCLA-guided cleanup requiring the removal and disposal of contaminated in-water sediment, creosote-treated timber wharf remnants, and upland soils, followed by the construction of a restored ecological habitat including off-channel emergent marsh, intertidal bench, and riparian areas. Earthwork activities are extensive, involving approximately 29,000 cubic yards of excavation and 10,000 cubic yards of import for habitat areas, 80,000 cubic yards of excavation and 70,000 cubic yards of import for upland cleanup, and 65,000 cubic yards of excavation with 30,000 cubic yards of import for in-water work, alongside the planting of over 30,000 native riparian and marsh vegetation species in strict accordance with a pre-approved planting plan. All in-water activities are constrained by fish and tidal work windows to protect regional aquatic ecosystems. The procurement process follows a two-step evaluative model beginning with a Request for Qualifications (RFQ) issued on July 16, 2026, followed by a Request for Proposals (RFP) on September 18, 2026, with proposals due in November 2026 and a Notice of Intent to Award anticipated in December 2026. All submissions must be completed through VendorConnect, and interested parties are required to register as Plan Holders to receive updates. The selected General Contractor/Construction Manager will enter into a pre-construction phase beginning February 2027 to advance design to 30% completion, with full design and permitting targeted for Q4 2028, and construction slated to commence in Q1 2029, concluding with substantial completion by Q2 2031. The NAICS code assigned is 562910, and communications must be directed exclusively to Leila Gonzalez-Rigatto at the Port of Seattle; no verbal instructions will be recognized, and contractual terms, evaluation weights, pricing, and detailed specifications are to be defined in the forthcoming RFQ and RFP documents.

General Info

Environmental cleanup and habitat restoration at Terminal 25 South using CERCLA authority, nine acres of wetland creation, GMC construction manager approach.

Agency

Port of Seattle → Waterfront Project Management

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(18)

MC-0322591 RFQ Attachment C Insurance and Bond Requirements

PDFsow

MC-0322591 RFQ Attachment I Identification of Project Table

PDFrfq

MC-0322591_RFQ_Reference_Document_A_Site23_25_Restoration_As-Built.pdf

PDF

MC-0322591 Terminal 25 S Habitat Restoration Scope of Work

PDFsow

MC-0322591 Corporate Structure Questionnaire

PDFquestionnaire

MC-0322591 GC/CM Preconstruction Services Agreement Draft

PDFcontract-document

MC-0322591 Terminal 25 South Habitat Restoration RFQ

PDFrfq

MC-0322591 Consultant Ethics and Conflict of Interest Policy

PDFconsultant-ethics-policy

MC-0322591 RFQ Instruction to Proposers

PDFinstruction-to-proposers

MC-0322591 Interim Record of Decision for Harbor Island Superfund Site East Waterway OU

PDFinterim-record-of-decision

MC-0322591 Terminal 25 S. Habitat Restoration Informational Meeting Presentation

PDFindustry-day

MC-0322591 RFQ Reference Document B T25S Restoration Conceptual Site Plan

PDFother

MC-0322591 Terminal 25 S Habitat Restoration Info Meeting Sign-In

XLSXspecial-notice

MC-0322591 GC/CM Construction Contract or Amendment

PDFcontract-document

MC-0322591 Draft Final Engineering Evaluation and Cost Analysis for Terminal 25 South Site

PDFengineering-evaluation-cost-analysis

MC-0322591 Terminal 25 S Habitat Restoration Informational Meeting Attendance

PDFattendance-record

MC-0322591 RFQ Attachment F Draft General Conditions

PDFgeneral-conditions

MC-0322591 Terminal 25 S. Habitat Restoration Informational Meeting Presentation 2026-06-23

PDFindustry-day

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPort of Seattle → Waterfront Project Management
Contacts2 people available
OfficeN/A
Organization / Agency
Port of Seattle → Waterfront Project Management
Office AddressN/A
Contacts
Leila Gonzalez-RigattoPort Contact
Tim LeonardProject Manager

Full Description

Show more
This project is a CERCLA cleanup involving removal and disposal of contaminated materials, including in-water sediment, creosote treated timber wharf remnants, and upland soils; and NRD restoration and construction of off-channel emergent marsh, intertidal bench, and riparian environmental habitat area within an approximate 9 acre total project site area. This GCCM will have a Request for Qualifications (RFQ) and Request for Proposals (RFP).