Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terminal 25 (T-25) South Habitat Restoration - GC/CM Pre-Construction

Closed
MC-0322591State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
SLED
Truck Loading Biofilter Media Replacement at Plant No. 2 (FR2-0034)
Solicitation # S-2026-736BD
The Orange County Sanitation District (OC San) is soliciting bids under solicitation S-2026-736BD for a general services contract to replace fouled biofilter media within the Truck Loading Biofilter System at Plant No. 2. The project requires the contractor to provide all labor, equipment, and materials to procure Biorem-manufactured media, remove and dispose of 5,624 cubic feet of old media and mesh, clean the air distribution system, and coordinate installation and operator training. To maintain continuous odor control, no more than one biofilter cell may be removed from service at a time. The work must be completed within 84 calendar days from the Notice to Proceed, with all deliverables accepted by the OC San Project Manager. Eligible bidders must hold a California Contractor's License classification A and comply with California Department of Industrial Relations prevailing wage requirements and CARB mobile source regulations. Mandatory requirements include attendance at a pre-bid meeting on September 24, 2026, and submission of bids via the OpenGov portal by October 20, 2026. Bidders must provide proof of comprehensive insurance, including general liability of 2 million dollars per occurrence and 4 million dollars aggregate. Award will be granted to the lowest responsible and responsive bidder. All hazardous materials and waste must be labeled and stored with secondary containment in accordance with safety standards.
Procurement

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Terminal 25 South Habitat Restoration project is a comprehensive environmental remediation and habitat restoration initiative under CERCLA, involving the removal and disposal of contaminated in-water sediments, creosote-treated timber wharf remnants, and upland soils, followed by the construction of ecological habitat features including emergent marsh, intertidal benches, and riparian areas across approximately nine acres. The procurement is structured as a General Contracting/Construction Management (GC/CM) project initiated through a Request for Qualifications and Request for Proposals, with the solicitation number MC-0322591 posted on July 16, 2026, and responses due by August 26, 2026. Performance is to occur at the Port of Seattle’s Terminal 25 South site, with all work governed by federal and state environmental regulations including the Clean Water Act, EPA water quality criteria, and Washington State WAC standards related to sediment disturbance and hazardous waste handling. The project demands strict adherence to Applicable or Relevant and Appropriate Requirements and requires the contractor to ensure compliance with prevailing wage laws, material newness, waste disposal protocols, safety standards, and all applicable local, state, and federal statutes. Contract administration is managed by the Port of Seattle’s Waterfront Project Management, with key contacts designated for procurement and oversight, and payments processed via direct deposit through the Port’s Contract Management System. The contract employs a Guaranteed Maximum Price model with cost-reimbursable elements and a fixed fee structure, and evaluation will be conducted using a best-value trade-off approach that places significant weight on technical merit—accounting for project approach, SCCM strategy, team qualifications, diversity inclusion, and community engagement—alongside a price component scored on a sliding scale relative to the lowest compliant bid. Proposals must be submitted electronically as searchable PDFs under strict formatting and file size requirements, with no hard copies or compressed files permitted. The contractor is responsible for all inspections, corrections, documentation retention, and insurance coverage, including pollution liability and additional insured endorsements naming the Port. Special requirements include post-final acceptance insurance obligations if corrections are needed, waiver of subrogation rights, adherence to personnel access and badging protocols, and compliance with socioeconomic reporting on minority-, women-, and veteran-owned business participation using regional certifications such as WMBE, DBE, and SBE. The contract does not specify a fixed contract value, maximum allowable construction cost, or FOB terms, nor does it reference military packaging standards; instead,

General Info

CERCLA cleanup and nine-acre habitat restoration at Terminal 25 South under Guaranteed Maximum Cost procurement.

Agency

Washington → Waterfront Project ManagementView Agency

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(18)

MC-0322591 RFQ Attachment C Insurance and Bond Requirements

PDFsow

MC-0322591 RFQ Attachment I Identification of Project Table

PDFrfq

MC-0322591_RFQ_Reference_Document_A_Site23_25_Restoration_As-Built.pdf

PDF

MC-0322591 Terminal 25 S Habitat Restoration Scope of Work

PDFsow

MC-0322591 Corporate Structure Questionnaire

PDFquestionnaire

MC-0322591 GC/CM Preconstruction Services Agreement Draft

PDFcontract-document

MC-0322591 Terminal 25 South Habitat Restoration RFQ

PDFrfq

MC-0322591 Consultant Ethics and Conflict of Interest Policy

PDFconsultant-ethics-policy

MC-0322591 RFQ Instruction to Proposers

PDFinstruction-to-proposers

MC-0322591 Interim Record of Decision for Harbor Island Superfund Site East Waterway OU

PDFinterim-record-of-decision

MC-0322591 Terminal 25 S. Habitat Restoration Informational Meeting Presentation

PDFindustry-day

MC-0322591 RFQ Reference Document B T25S Restoration Conceptual Site Plan

PDFother

MC-0322591 Terminal 25 S Habitat Restoration Info Meeting Sign-In

XLSXspecial-notice

MC-0322591 GC/CM Construction Contract or Amendment

PDFcontract-document

MC-0322591 Draft Final Engineering Evaluation and Cost Analysis for Terminal 25 South Site

PDFengineering-evaluation-cost-analysis

MC-0322591 Terminal 25 S Habitat Restoration Informational Meeting Attendance

PDFattendance-record

MC-0322591 RFQ Attachment F Draft General Conditions

PDFgeneral-conditions

MC-0322591 Terminal 25 S. Habitat Restoration Informational Meeting Presentation 2026-06-23

PDFindustry-day

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Waterfront Project Management
Contacts2 people available
OfficeN/A
Organization / Agency
Washington → Waterfront Project Management
View Agency Profile
Office AddressN/A
Contacts
Leila Gonzalez-RigattoPort Contact
Tim LeonardProject Manager

Interested Companies (32)

Show more
Shimmick Construction
Suisun City, CA
Duwamish Services
Seattle, Washington

See All 32 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project is a CERCLA cleanup involving removal and disposal of contaminated materials, including in-water sediment, creosote treated timber wharf remnants, and upland soils; and NRD restoration and construction of off-channel emergent marsh, intertidal bench, and riparian environmental habitat area within an approximate 9 acre total project site area. This GCCM will have a Request for Qualifications (RFQ) and Request for Proposals (RFP).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS