Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terminal 3 Drainage Upgrades

Closed
24-44State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Terminal 3 Drainage Upgrades project, solicited by the Port of Vancouver under solicitation number 24-44, aims to enhance the Terminal 3 Stormwater Drainage System to increase stormwater capture and treatment. The scope of work involves the installation of a trench drain with associated concrete work, connecting the drain to the existing storm system, and the installation of extruded curb and one HMA speed bump. The engineer's estimate for this paving project is between 75,000 and 100,000 dollars. A non-mandatory pre-bid site visit is scheduled for Tuesday, October 1, at 2:00 PM at 3103 NW Lower River Road, Vancouver, Washington. All attendees are required to provide and wear full personal protective equipment, including reflective clothing, steel-toed shoes, gloves, eye protection, and a hard hat, to gain entry to the leasehold. The deadline for responses to this solicitation is October 10, 2024.

General Info

Port of Vancouver Terminal 3 drainage upgrades project, estimated $75,000-$100,000, due October 10.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Port of Vancouver
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Terminal 3 Drainage project modifies the Terminal 3 Stormwater Drainage System to capture more stormwater and send it to treatment.  Work includes but is not limited to installation of trench drain with associated concrete work, connecting the installed trench drain to the storm drain system, extruded curb, and one HMA speed bump. A non-mandatory pre-bid site visit will be held Tuesday, October 1, at 2:00 PM, 3103 NW Lower River Road, Vancouver, WA 98660. Attendees must furnish and utilize safety equipment which includes reflective clothing (or vest), steel toed shoes, gloves, eye protection and a hard hat to enter tenant's leasehold. Those who are not equipped with proper PPE will not be permitted to enter the space. The engineer's estimate for the paving project is $75,000 - $100,000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS