Terminal 3 West Modernization - TP 246 - East: Sitework and Site Utilities

Active
10071.76 - TP 246State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Turner Construction Company is leading the Terminal 3 West Modernization project at San Francisco International Airport, which involves expanding Terminal 3 by approximately 735,000 square feet and renovating an additional 516,644 square feet of existing space, all while keeping the terminal fully operational through meticulous phasing. Key enhancements include modernizing building systems, performing seismic retrofits, improving passenger flow and experience, adding flexible new gates, and constructing the seven-story Courtyard 4 Connector, a new core-and-shell structure linking Terminal 3 to the International Terminal. The Connector will house secure passenger corridors, baggage handling systems, office space, passenger lounges, employee amenities, a Customs & Border Protection One-Stop checkpoint, a loading dock, a mechanical penthouse, and upgrades to the existing pump station, with levels two and three integrated directly into Terminal 3 for egress and utility compliance. As part of this larger effort, Trade Package No. 246 focuses on sitework and site utilities in the eastern portion of the project area, encompassing grading, excavation, trenching, paving, drainage improvements, and underground utility installations or modifications, with full coordination, testing, inspections, and restoration required. The estimated cost for this package is $16.1 million, with a mandatory 25 percent participation requirement for Certified Minority- and Women-Owned Business Enterprises, and bidders must meet Turner and SFO prequalification standards, with inquiries directed to Briana Padilla. The bid is due August 10, 2026, at 5:00 PM, with the solicitation posted on July 13, 2026, and the procurement officer for the project is Tiffany Gonzalez-Ruiz at SFO.

General Info

Turner Construction expands Terminal 3 at SFO with new connector, utilities, and minority business requirements for $16.1M trade package.

Agency

California → Design-BuilderView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Design-Builder
Contacts1 person available
OfficeSan Francisco, CA, 94128, US
Organization / Agency
California → Design-Builder
View Agency Profile
Office AddressSan Francisco, CA, 94128, US
Contacts
Tiffany Gonzalez-RuizProcurement Officer I

Full Description

Show more
Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 735,000 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Courtyard 4 Connector (C4C) The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for o&ices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package No.: 246 Trade Package Title: East: Sitework and Site Utilities Description of the Trade Package Scope of Work: This trade package includes sitework and site utility improvements within the east portion of the project area. The scope includes grading, excavation, trenching, backfill, paving, concrete flatwork, drainage improvements, and installation or modification of underground utilities, including coordination, testing, inspections, and restoration of disturbed areas. Trade Package Bid Due Date and Time: 8/10/2026 by 5:00PM Estimated Cost: $16.1 M Main Trades of the Trade Package: Sitework, Site Utilities CMD LBE Participation Requirements % : 25% Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers for the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The scope of work includes comprehensive upgrades to the digester facilities, such as replacing digester gas piping and associated safety equipment, installing new level measurement devices, recoating internal headspaces, and performing concrete repairs on four digesters and the surrounding building. Additional work involves replacing two roof hatches on each digester with concrete repair provisions, installing five owner-furnished linear generators with related electrical systems, and implementing biogas conditioning and RNG upgrading equipment connected to a new injection pipeline leading to the PG&E station. The project also requires removing the existing cogeneration facility and its appurtenances, replacing the steam boiler and system with a hydronic heating water system, and installing new enclosed flares in place of outdated waste gas flares. Civil, structural, mechanical, electrical, and demolition tasks are all included to support these energy improvements. Bidders must respond under the specified NAICS codes, including 238910, and are encouraged to participate as Disadvantaged Business Enterprises (DBE), Minority Business Enterprises (MBE) with NMSDC certification, or Women Business Enterprises (WBE) certified by WBENC. The solicitation is open to those who request access by emailing estimating@gseconstruction.com to receive a secure link to the complete project documents. All bids are due by August 20, 2026, and interested parties should note that no physical address is provided for the agency, but the work will be performed at 14811 Del Monte Blvd, Marina, CA 93933. Michael Demissie is the primary point of contact for inquiries, reachable by phone or email.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor/Construction Manager, encompasses a comprehensive range of construction and renovation activities critical to modernizing the airport’s infrastructure. The scope includes demolition and abatement, building concrete retrofit, structural steel and metal stairs and railings, fire suppression systems, site paving, runway and taxi marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems. Each subsystem is assigned a budget range, collectively totaling an estimated contract value between $124.2 million and $143.7 million, with individual subsystems ranging from $600,000 for runway marking to over $20 million for baggage handling systems. The project demands strict adherence to Hensel Phelps standard subcontract forms and requires all subcontracts exceeding $100,000 to include performance bonds submitted using the provided bond forms. A Workers’ Compensation Waiver of Subrogation is mandatory for all subcontractors, and the project operates under a Project Labor Agreement, mandating labor practices aligned with industry-wide agreements. All bids must be submitted via email to sea-scebids@henselphelps.com by August 11, 2026, using the official bid form contained in the Instructions To Bidders document. The place of performance is the Seattle-Tacoma International Airport in Washington, and the solicitation is designated for Small Disadvantaged Businesses under NAICS code 238910, with Hensel Phelps acting as an Equal Opportunity Employer.
Hensel Phelps

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to support the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, with a solicitation deadline of August 11, 2026. The project involves building a 0.50 MGD facility to produce approximately 500 acre-feet of purified water annually, including a 200,000-gallon equalization tank, membrane filtration and two-stage reverse osmosis systems, UV/advanced oxidation, post-treatment stabilization and chlorination, chemical handling infrastructure, purified water storage and pumping, 2,000 linear feet of HDPE conveyance pipelines, and groundwater recharge infrastructure consisting of one injection well and two monitoring wells. The scope also includes full electrical, instrumentation, SCADA, and control systems. Bidders must hold relevant NAICS codes including 237110, 238120, 237310, 238990, 561730, 238110, 238320, 332312, 238220, and 221310. The contract is set aside for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Disadvantaged Business Enterprise under DOT, and Minority Business Enterprise certified through NMSDC. Interested parties must request access to project documents via email at estimating@gseconstruction.com to receive a secure link prior to submitting bids. Primary points of contact are Michael Demissie and Juan Catano.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 1 day
View Details