Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terminal 6 Berths 603, 604, 605, and 606 Electrical, Lighting, and Pavement Improvements

Closed
2025-11131State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves comprehensive improvements at Terminal 6 Berths 603, 604, 605, and 606, managed by the Port of Portland in California. The scope includes removing existing pavement and replacing it with new asphalt concrete, as well as milling and overlaying the current pavement surface. Additionally, the project entails installing a new storm sewer system, modifying the existing storm drainage infrastructure, and implementing pavement markings. Electrical upgrades are a significant component, involving demolition and installation of lighting systems, including new lighting fixtures on existing poles, and the integration of a new lighting control system. The electrical work also covers routing of electrical conduits, duct banks, and the removal and installation of transformers and other electrical equipment, along with constructing concrete pads and bollard systems to safeguard the electrical infrastructure. The project is estimated to cost between 5 million and 15 million dollars and is scheduled for bidding with a response deadline of March 20, 2025. It is a solicitation issued by the Port of Portland, and interested contractors can contact Kim Alandar via email or phone for further details. The work aims to enhance the pavement durability, improve stormwater management, and upgrade electrical and lighting systems to meet current standards, ensuring safer and more efficient operations at the terminal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

3

Port of Portland Good Faith Efforts Program Guidance

PDF, High priority: read this first3 pages · good-faith-efforts-guidance
High

Getting the most out of your Port of Portland Vendor Profile

DOCX, Low priority2 pages · other
Low

Substitution Request Form - Port of Portland

PDF, Low priority1 page · substitution-request-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of Portland
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Port of Portland
Office AddressN/A

Full Description

Show more
Removal of existing pavement and replacement with a new asphalt concrete (AC) pavement section; mill and inlay/overlay of AC pavement; providing a new storm sewer system; modification of the existing storm system; light pole demolition and installation, providing new lighting on existing poles, and providing a new lighting control system; providing electrical conduit and low-voltage and medium-voltage electrical routing; providing duct bank; removing transformers and other miscellaneous electrical equipment; providing new transformers; miscellaneous electrical demolition; providing concrete pads and bollard systems to protect new electrical equipment; and pavement marking.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS