Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on September 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Teton Canyon Tail Bridge Replacements

Closed
1240LN25R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 12 hours ago

DEADLINE

in about 16 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 13 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the construction of two trail bridges near Driggs, Idaho, on the Teton Basin Ranger District. The first bridge, known as Bridge One, is situated on Forest Service trail 6130, the Sheep Bridge trail, approximately 7.3 miles east of Driggs. The second bridge is located off Teton Canyon Road, about 9.6 miles east of Driggs. The project is part of a total small business set-aside initiative under the solicitation number 1240LN25R0007, posted on September 24, 2025, with a response deadline of September 29, 2025. The work is overseen by the USDA Forest Service, specifically the CSA Intermountain 3 office based in Ogden, Utah, and is performed in the vicinity of Driggs, Idaho. This project falls under the NAICS code 237310, which pertains to highway, street, and bridge construction. Interested contractors can contact Crystal Amos via email or phone for further details. The contract aims to enhance trail infrastructure in the Teton Canyon area, supporting outdoor recreation and access improvements. The procurement emphasizes small business participation, ensuring opportunities for qualified small enterprises to contribute to this infrastructure development.

General Info

Replace two trail bridges near Driggs, Idaho; small business set-aside; bids due September 29, 2025.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Driggs, ID, 83422, USA

Set-Aside

SBA

Documents

9

A10 Atch 2 Schedule Of Items - Sheep Bridge Replacement

XLSX, High priority: read this first4 pages · specifications
High

Amendment 0001 - Teton Canyon Bridge (1240LN25R0008)

PDF, High priority: read this firstamendment
High

Attachment 3: Sheep Bridge Photos

PDF, High priority: read this firstspecifications
High

Sheep Bridge Trail Bridge Replacement Drawings

PDF, High priority: read this firstspecifications
High

Solicitation 1240LN25R0008 - Caribou-Targhee National Forest Trail Bridges

PDF, High priority: read this firstrfp
High

Teton Canyon Trail Bridge Replacements - Specifications

PDF, High priority: read this first56 pages · specifications
High

Treasure Lake Bridge Construction - General Notes and Drawings

PDF, High priority: read this first6 pages · specifications
High

Wage Determination ID20250087 - Idaho (Highway)

PDF, High priority: read this firstwage-determination
High

Treasure Lake Bridge Site Pictures

DOCX, Low priority8 pages · specifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 25, 2025 to Sep 29, 2025.

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 3 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA

Full Description

Show more
Teton Canyon Bridge Replacement: Construction of two trail bridges near Driggs, Idaho on the Teton Basin Ranger District, (Bridge One), is located on Forest Service trail 6130, Sheep Bridge trail, approximately 7.3 miles east of Driggs, Idaho. Bridge Two is located off Teton Canyon Road approximately 9.6 miles east of Driggs, Idaho.

More opportunities from Department Of Agriculture → Csa Intermountain 3 Usda-Fs

Same awarding agency

NAICS: 115310
New
Federal
Forest Service Hand Thinning, MATOC North Rockies/Great Basin
Solicitation # 1176101
The USDA Forest Service is seeking sources for a Multiple Award IDIQ contract to perform non-merchantable vegetation management activities across National Forests and National Grasslands in the Northern Rockies and Great Basin regions. This effort covers portions of California, Idaho, Montana, Nevada, North Dakota, Utah, and Wyoming, with a total magnitude exceeding 10 million dollars. The primary objectives are fuels reduction, prescribed burn unit preparation, stand improvement, and unit rehabilitation. Specific tasks include tree thinning, slashing, girdling, pruning, weed and release, hand piling, fuel break and fireline construction, duff mound removal, and chipping services. Work may also include unit boundary designation and traversing, and may extend to adjacent lands when necessary to achieve project goals. The estimated period of performance is five years, extending through 2031. This is currently a sources-sought notice rather than a formal solicitation, and interested parties must submit a Capability Statement to Crystal Amos by November 19, 2026. Submissions must include the company name, Unique Entity Identification, SAM expiration date, and business size or socioeconomic status. Additionally, contractors must demonstrate their capacity to expertly perform multiple tasks across a broad geographic area within short field seasons. All responses should be submitted via email to the contracting officer.
Support Activities for Forestry

POSTED

1 day ago

DEADLINE

in 30 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS