Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 16, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

59--RF Absorber

Awarded
N0016408CGR06Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334290
New
DIBBS
INTERFACE UNIT, COMMUNI
Solicitation # SPE4A7-27-T-2289
Solicitation SPE4A7-27-T-2289 is a request for quotations issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of three interface units for communication equipment, identified by NSN 5895-01-739-0196. The requirement specifies parts from Watlow Electric Manufacturing Co (P/N 2292-6980 and PM6C1CJ-ARAAVWP). Delivery is required within 146 days after order, with a need ship date of April 1, 2027, and an original required delivery date of August 13, 2027. The items are to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and RP001 for palletization. Inspection and acceptance will occur at the destination. Quality assurance follows MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for sample lots under MIL-STD-105/ASQ Z1.4. Administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing and payment. The solicitation incorporates several federal regulations, including the Buy American and Balance of Payments Program, DFARS cybersecurity reporting requirements, and prohibitions on covered telecommunications equipment. Award may consider the HUBZone price evaluation preference.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 22 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract outlines requirements for the fabrication, delivery, and installation of a radio frequency (RF) absorber system at the FBI Engineering Research Facility in Quantico, Virginia. The contractor is responsible for manufacturing the absorber according to detailed drawings provided by the Naval Surface Warfare Center Crane Division, ensuring strict adherence to specified material and performance criteria. The RF absorber must demonstrate specific reflectivity reductions across designated frequency ranges and maintain a maximum material weight, with installation to be completed within 30 days of delivery. The contract also mandates comprehensive security protocols, including U.S. citizenship for personnel, submission of background check information, and access controls administered by the FBI Security Office to safeguard the sensitive work site. Quality assurance standards require compliance with ISO 9000 and relevant fire retardancy tests, ensuring the materials meet stringent safety regulations. Final inspection and acceptance will be conducted at the FBI site after installation and testing are complete. The contract includes a standard commercial warranty from the date of acceptance. Communication regarding technical aspects is designated to specific points of contact within the Naval Surface Warfare Center, while all substantive contractual changes must be authorized by the Contracting Officer. The modification reflected in this document corrects and clarifies the Statement of Work for this contract.

General Info

Fabricate, deliver, install RF absorber at FBI Quantico with strict specs, security, and inspections.

Contract Value

$719,787

NAICS

334290 - Other Communications Equipment Manufacturing

Place of Performance

IN, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Award Notice

Notice updated

Notice type changed from Award Notice to Special Notice. The response deadline was removed. The notice title changed. NAICS code added: 334515. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Nswc Crane
ContactsNo contacts available
OfficeCRANE, IN, 47522-5001, USA
Office AddressCRANE, IN, 47522-5001, USA
ContactsNo contact information available

Full Description

Show more
N00164-08-C-GR06 P00001 The following have been modified:STATEMENT OF WORKStatement of WorkForRF Absorber07 April 2008Prepared byNaval Surface Warfare Center, Crane DivisionN00164-08-C-GR06P00001Page 3 of 6ContentsSection/Para Page1.0 Scope/Background.......................................................................................................42.0 Applicable Documents.................................................................................................43.0 RF Absorber Layout....................................................................................................44.0 RF Absorber on the Arm Assembly.............................................................................45.0 Security Clearance/Limited Background Checks........................................................56.0 Quality Assurance........................................................................................................67.0 Inspection/Acceptance.................................................................................................68.0 Warranty.......................................................................................................................6N00164-08-C-GR06P00001Page 4 of 6Statement of WorkRF Absorber1.0 Scope/Background.This Statement of Work (SOW) describes the requirements for a RF absorber which shall be fabricated, delivered, and installed at the Federal Bureau of Investigation (FBI) Engineering Research Facility (ERF) in Quantico, VA.2.0 Applicable Documents.NSWC Crane Drawing 80942410 ABSORBER LAYOUT, VACSNSWC Crane Drawing 80942435 ARM ASSEMBLY, VACS3.0 RF Absorber Layout.3.1 Requirements for RF Absorber Layout.The contractor shall perform the following tasks to support, manufacture, assemble, and install RF absorber per Drawing 80942410 in Section 2.0. The contractor shall include material and performance specifications. The Government reserves the right to request informal progress reviews to be held at the contractor's facility at a mutually agreed time.3.2 Fabrication.The contractor shall provide the material per NSWC Crane Document Drawing 80942410 listed in Section 2.0.3.3 Installation.The contractor shall be responsible for providing all labor and material necessary to install the RF Absorber per Section 3.1 in its place of operation at the Federal Bureau of Investigation (FBI) Engineering Research Facility (ERF). Installation shall include locating and positioning the material directly from the freight carrier.Installation shall occur within thirty (30) days of system delivery at the FBI ERF. If any special equipment is needed for the installation of the RF Absorber, the contractor proposal shall detail these requirements.4.0 RF Absorber on the Arm Assembly.4.1 Requirements for RF Absorber on the Arm Assembly.The contractor shall perform the following tasks to support, manufacture, assemble, and install RF absorber on the equipment detailed in Drawing 80942435 in Section 2.0. The contractor shall meet the performance specifications as described below:Material Weight shall not exceed 2.0 pounds per square foot, installed.N00164-08-C-GR06P00001Page 5 of 6Microwave Absorber shall provide approximate reflectivity reduction as follows:13 dB at 0.3 GHz15 dB at 0.4 GHz18 dB at 0.5 GHz20 dB at 0.6 GHz>20 dB at 1.0 GHz>20 dB at 6.0 GHzThe contractor shall include material and performance specifications. The Government reserves the right to request informal progress reviews to be held at the contractor's facility at a mutually agreed time.4.2 Fabrication.The contractor shall provide material to cover the item listed in NSWC Crane Drawing 80942435 meeting the performance requirements of Section 4.1.4.3 Installation.The contractor shall be responsible for providing all labor and material necessary to install the RF Absorber per Section 4.1 in its place of operation at the Federal Bureau of Investigation (FBI) Engineering Research Facility (ERF). Installation shall include locating and positioning the material directly from the freight carrier.Installation shall occur within thirty (30) days of system delivery at the FBI ERF. If any special equipment is needed for installation of the RF Absorber, the contractor proposal shall detail these requirements5.0 Security Clearance/Limited Background Checks. The contractor shall be a US Citizen. Contractor shall identify on-site managers who will be responsible for monitoring the activity all persons (employees and subcontractors). Contractor shall, at least ninety (90) days prior to starting work, submit to FBI ERF Security Office an alphabetical list of named on-site managers. The list shall include the Full Name, Date of Birth, Social Security Number, Race, Gender, and position/title/duties of each named on-site manager. The named on-site managers will be subject to a limited background investigation to include automated indices and fingerprint checks conducted by FBI ERF Security Office. The FBI ERF Security Office will issue each cleared on-site manager an identification badge to gain access through the FBI gate and entrance to the construction site. Failure to comply may result in person(s) being refused access and will not result in the Government being liable for any costs or delays in the project. Replacement on-site managers are subject to the guidelines set forth above. Contractor shall, at least forty five (45) days prior to starting work, submit to the FBI ERF Security Office an alphabetical list of all persons (employees and subcontractors) that they propose to have work on this project. The list shall include the Full Name, Date of Birth, Social Security Number, Race, Gender, and position/title/duties of each person. These individuals will be subject to an automated indices check conducted by FBI ERF Security Office. Cleared individuals will be placed on a controlled access list with the FBI. Upon arrival at the FBI East gate, individuals must provide a photo ID to gain access through the FBI gate and entrance to the construction site. Any individual not on the access list will not be allowed to enter. Failure to comply may result in person(s) being refused access and will not result in the Government being liable for any costs or delays in the project. Prior to delivering materials, equipment and tools, etc to the project site, the Contractor shall at least seventy-two (72) hours prior to delivering such materials, equipment, tools, etc, submit to FBI ERFN00164-08-C-GR06P00001Page 6 of 6Security Office an alphabetical list of the names of persons, not previously cleared for access, that they propose to deliver the material, to include their full name, date of birth, social security number, race, and gender, and position/title duties of each person. These individuals will be subject to an automated indices check conducted by FBI ERF Security Office. Cleared individuals will be placed on a controlled access list with the FBI. Upon arrival at the FBI East gate, individuals must provide a photo ID to gain access through the FBI gate and entrance to the construction site. Any individual not on the access list will not be allowed to enter. Failure to comply may result in persons(s) being refused access and will not result in the Government being liable for any costs or delays in the project. It takes approximately 30 days after receipt of the completed individuals package to process. The security Point of Contact at the FBI is Joy Byrd, +1 (555) 000-0000.6.0 Quality Assurance.The Contractor shall maintain quality assurance according to International Standards Organization 9000 standards. All materials should meet all of the fire retardancy requirements of NRL Specification 8093 tests 1, 2, and 3, MS-8-21 tests 1, 2, and 3, and ASTM E-84-97a, Class A.7.0 Inspection/Acceptance.Final Inspection and Acceptance will occur at the Federal Bureau of Investigation, Quantico, VA, after material is assembled, installed and tested.8.0 Warranty.The contractor shall provide a standard commercial warranty from the date of material acceptance.9.0 Point of ContactThe POC of the contract is Ms. Paula Hauser, Code GXLL, telephone +1 (555) 000-0000. The POC is the technical POC for non-substantive communications of a technical nature. The technical point of contact for this effort is Greg Wisniewski, Code GXRV, telephone +1 (555) 000-0000. Only the Contracting Officer has the authority to change the requirements of this contract. All communications of a substantive nature shall be made through the Contracting Office, Ms. Shirley Corbin, telephone +1 (555) 000-0000.

More opportunities from Department Of Defense → Nswc Crane

Same awarding agency

NAICS: 336510
New
Federal
N0016426RGW20-PROCUREMENT OF DESIGN AND PRODUCTION OF FLAT RAILCARS-PSC 2220- NAICS 336510
Solicitation # N0016426RGW20
Solicitation N0016426RGW20, issued by the NSWC Crane Warfare Center, is an IDIQ contract for the design, testing, and production of NSWC AIM Flatcars. The project has a contract maximum quantity of nine railcars, which must be fully commissioned and approved for rail use by the Association of American Railroads (AAR) in accordance with AAR-M1001 Section C, Part II. Key technical specifications include a lightweight car requirement of 116,000 pounds, truck axle loads not exceeding 60,000 pounds per axle, and adherence to WS20972 and MIL-SPC-810 for load securement. The period of performance is structured over five years from the date of award, with delivery costs to be evaluated across three Strategic Weapons Facility locations. The procurement process has undergone seven amendments, resulting in several extensions of the proposal deadline, with the final closing date set for November 25, 2026, at 2:00 PM EST. Significant modifications include updates to the Statement of Work, a reduction in the number of Contract Data Requirement Lists (CDRLs), and revisions to the System Requirements Document to adjust shipping weights and strikedown loads. The government will evaluate proposals based on delivery pricing and past performance on related railcar design and manufacture contracts, including commercial and non-federal experience. Government Furnished Property, including Active Inert Missiles and shipping fixtures, is designated for support with delivery dates targeted for September 20, 2027.
Railroad Rolling Stock Manufacturing

POSTED

3 days ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS