Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

The RIVER VALLEY CHARTER SCHOOL, the Awarding Authority, invites sealed bids from Contractors for the River Valley Charter School - Phase 1 Playground at River Valley Charter School in Newburyport,

Active
GC-211794State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

River Valley Charter School is seeking sealed bids from qualified contractors for the Phase 1 Playground project located in Newburyport, Massachusetts. Based on documents prepared by Copley Wolff, the scope of work primarily involves the demolition and removal of outdated play equipment and mulch safety surfacing. The project further requires comprehensive sitework to prepare for a custom play structure, which will be procured and installed by a separate party. Key deliverables include the installation of an accessible stonedust walkway, timber edging, and engineered wood fiber surfacing, as well as debris removal and cleanup at two existing ponds on the property.

General Info

Bids for River Valley Charter School playground demolition, sitework, and surfacing in Newburyport, Massachusetts.

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → River Valley Charter School
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The RIVER VALLEY CHARTER SCHOOL, the Awarding Authority, invites sealed bids from Contractors for the River Valley Charter School - Phase 1 Playground at River Valley Charter School in Newburyport, Massachusetts, in accordance with the documents prepared by COPLEY WOLFF. The Project consists of but not limited to: The project includes the removal and demolition of existing outdated play equipment and mulch safety surfacing. The sitework includes site preparation for a custom play structure (procured and installed by others), and accessible stonedust walkway, engineered wood fiber surfacing and timber edging. The project also includes clean up at the two existing ponds to remove debris.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS