Third Street Grade Separation at BNSF Railroad
Active
8225State & LocalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Public Works Department of City of RiversideView Agency
NAICS
237310 - Highway, Street, and Bridge ConstructionView NAICS
Place of Performance
2675 Third Street, Riverside, CA 92507, CA, USSet-Aside
NONE
Timeline
Response Deadline
Organization & Contact Information
Show more
AgencyCalifornia → Public Works Department of City of Riverside
Contacts1 person available
OfficeCA, US
Office AddressCA, US
Contacts
Jason JonesContact
Full Description
Show more
Scope: The project generally includes the construction of an underpass at the location of Third Street and the
BNSF tracks. The project consists of, but is not limited to, the following major activities:
• Construction of a quadruple track concrete bridge structure. • Construction of retaining walls. • Excavation and grading of Third Street for approximately 1,340 feet, from approximately 400 feet west of the BNSF crossing to approximately 940 feet east of the BNSF crossing. • Construction of a new roadway pavement along Third Street, including concrete curbs, gutters, sidewalks, wheelchair ramps, driveways and retaining walls. • Reconfiguration of local streets. • Relocation, reconstruction and realignment of wet and dry utilities, including, but not limited to, the Riverside Canal. • Construction of storm drain pipes, catch basins, and a new pump station. • Construction of a storm water detention basin. • Reconstruction/Modification of existing traffic signals. • Installation of landscaping and irrigation improvements. • Installation of new traffic signing and striping. • Demolition and removal of buildings and improvements on two (2) parcels that have been acquired, by the City, for the project.
Notes: The Contractor shall obtain and pay for all licenses necessitated by the Contractor's operations. Prior to starting any work, the Contractor shall be required to have a City of Riverside Business Tax Registration valid for the life of the Contract; subcontractors shall also have Business Tax Registrations valid for the time they are engaged in the work.
Bid Bond: 10.00%
• Construction of a quadruple track concrete bridge structure. • Construction of retaining walls. • Excavation and grading of Third Street for approximately 1,340 feet, from approximately 400 feet west of the BNSF crossing to approximately 940 feet east of the BNSF crossing. • Construction of a new roadway pavement along Third Street, including concrete curbs, gutters, sidewalks, wheelchair ramps, driveways and retaining walls. • Reconfiguration of local streets. • Relocation, reconstruction and realignment of wet and dry utilities, including, but not limited to, the Riverside Canal. • Construction of storm drain pipes, catch basins, and a new pump station. • Construction of a storm water detention basin. • Reconstruction/Modification of existing traffic signals. • Installation of landscaping and irrigation improvements. • Installation of new traffic signing and striping. • Demolition and removal of buildings and improvements on two (2) parcels that have been acquired, by the City, for the project.
Notes: The Contractor shall obtain and pay for all licenses necessitated by the Contractor's operations. Prior to starting any work, the Contractor shall be required to have a City of Riverside Business Tax Registration valid for the life of the Contract; subcontractors shall also have Business Tax Registrations valid for the time they are engaged in the work.
Bid Bond: 10.00%