Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Three Rivers Transit Center Security Windows

Closed
26-08State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238150
New
SLED
Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 Subcontractor Bid Packages
Solicitation # 5551
The University of California, San Diego, through CM/Contractor DPR Construction, is soliciting bids for subcontractor packages for the Hillcrest Medical Center Renewal (HMCR) and Central Utility Plant (CUP) project in San Diego, California. The overall project scope involves the construction of a 700,000 to 850,000 square foot medical center featuring 300 licensed beds, a Level One Trauma Center, and surgical and imaging departments, as well as an approximately 20,000 square foot all-electric Central Utility Plant. The total estimated construction cost for the project ranges from 1.5 billion to 2 billion dollars, with specific Phase 2 subcontractor packages including unitized curtainwall estimated at 37 million dollars, structural steel at 65 million dollars, and elevators at 16 million dollars. The period of performance is scheduled from May 2026 through September 2028. This is a prevailing wage project with skilled and trained workforce requirements. All contractors and subcontractors must be registered with the Department of Industrial Relations (DIR) at the time of the bid and utilize the electronic certified payroll reporting system. There is a strong commitment to increasing the participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs), and bidders may be required to provide evidence of equal employment opportunity policies. Technical proposals are due by November 20, 2026, while the bid form, bid bond, and schedule of values must be submitted via Building Connected by December 9, 2026. Work must adhere to CSI Divisions 084400, 051200, and 140000.
University of California, San Diego

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 238150
New
SLED
CC-624-230-001 BCCC Exterior Window and Storefront Replacement at South Pavilion
Solicitation # BPM059062
Solicitation BPM059062, project number CC-624-230-001, is an Invitation for Bids issued by the Maryland Department of General Services for the exterior window and storefront replacement at the Baltimore City Community College South Pavilion. This firm fixed price construction project has a duration of 210 calendar days and is estimated to be valued between 1,000,000 and 2,500,000 dollars. The scope of work involves the installation of YKK systems across a 15,000 square foot building area, requiring strict adherence to AAMA 501.2 watertightness standards and ADA accessibility guidelines. Award will be based on the lowest total bid price, which includes the base bid, unit prices, allowances, and alternatives. The contract mandates several compliance and financial requirements, including a 10 percent Minority Business Enterprise goal and a 1 percent Veteran-Owned Small Business Enterprise goal. Bidders must provide bid bonds for projects exceeding 200,000 dollars, and the successful contractor will be required to furnish performance and payment bonds. Additionally, the contractor must comply with Maryland prevailing wage laws, certify the use of American-manufactured goods, and remit a 1 percent electronic transaction fee on all approved invoices. Performance is monitored through a series of field tests at 5, 50, and 90 percent completion milestones, with final acceptance contingent upon a successful punch list and final cleaning.
Department Of General Services

POSTED

1 day ago

DEADLINE

in 27 days

AI Contract Overview

Show more

Benton Franklin Transit is soliciting qualified contractors to remove existing walk-up service window and lobby service counter glazing systems and install new bullet-resistant glazing and panel systems at the Three Rivers Transit facility in Kennewick, Washington. The scope of work includes complete demolition of existing systems, necessary framing modifications, installation of new bullet-resistant materials, finishing work, and integration of all components to ensure a fully functional and secure installation. All work must comply with federal, Washington State, and local codes, regulations, and permitting requirements, including coordination with the City of Kennewick and any required inspections or approvals. The contract is structured as a fixed-price lump sum with an estimated value of $74,965, and the selected contractor must complete substantial work within 20 calendar days of the Notice to Proceed and final installation within 70 calendar days, with final acceptance occurring within 10 days after punch list resolution. Bids are due by June 16, 2026, and submission is exclusively through the OpenGov e-Procurement portal. The award will follow a Lowest Price Technically Acceptable (LPTA) methodology, prioritizing responsiveness and technical compliance before selecting the lowest viable bid, with a tie-breaker preference given to contractors compliant with a Drug-Free Workplace Program. Contractors must provide a full-time superintendent on-site during all work hours, which are restricted to standard daytime Monday through Friday without overtime, weekends, or holidays unless granted written permission. Insurance requirements include Professional Liability, Pollution and Legal Liability, and Electronic Data Liability coverage at $1 million per occurrence with $2 million aggregate limits, with ACORD certificates mandating 30 days’ notice for cancellation or material change. Compliance with 49 CFR Part 26 is required, including a 1.0% Disadvantaged Business Enterprise participation goal and inclusion of non-discrimination clauses in all subcontracts. The contractor assumes full responsibility for property damage, work quality, and correction of defects at no additional cost to the agency. Invoices must be submitted via email to accounts payable with specific required information and are subject to payment terms of 20 calendar days after approval, with 90% retained until final acceptance. Contractor responsibilities also include adherence to ASTM standards and manufacturer specifications, with a one-year warranty on all workmanship and materials. The contract prohibits collusion, requires disclosure of prior failures or lawsuits, and mandates compliance with the Privacy Act of 1974 and applicable state laws, including protection of any historical or archaeological

General Info

Remove and install bullet-resistant glazing at Kennewick transit facility for $74,965 within 70 days under LPTA.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

3

IFB 26-08 Three Rivers Transit Center Security Windows

PDF, High priority: read this firstifb
High

T1-2448_BR_SLDUP_SLPBASE_CUSTOM Drawing

PDF, High priority: read this firstspecifications
High

Permit Set 02-25-2026 for Ben Franklin Transit Service Counter Changes

PDF, Low prioritypermit-set
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Procurement
Contacts2 people available
OfficeRichland, WA, 99352, USA
Organization / AgencyWashington → Procurement
Office AddressRichland, WA, 99352, USA
Contacts
Matt OwensFacilities Specialist
Lisa MannProcurement Manager

Interested Companies (13)

J & A Interior/extr PROSPuyallap, WA
Office WagonBay Harbor Islands, FL
Seattle Daily Journal of CommerceSeattle, Washington

See All 13 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Benton Franklin Transit (BFT) is soliciting for qualified contractors to provide all labor, materials, equipment, supervision, and incidentals necessary to remove the existing walk-up service window and lobby service counter glazing systems and install new bullet-resistant glazing and panel systems at the Three Rivers Transit facility in Kennewick, Washington. The selected contractor shall be responsible for complete installation and integration of both the new systems, including any required demolition, disposal, framing modifications, finishes, and related work necessary for a fully functional installation. All work shall be performed in accordance with applicable federal, Washington State, and local laws, codes, regulations, and permitting requirements, including coordination with the City of Kennewick and any required inspections or approvals.

More opportunities from Washington → Procurement

Same awarding agency

NAICS: 238110
New
SLED
Bus Stop Concrete Pad and Amenity Installations
Solicitation # 26-17
Ben Franklin Transit is soliciting bids for solicitation number 26-17 to secure a qualified contractor for on-call bus stop construction and amenity installation services. The project covers a 625 square mile service area across Benton and Franklin Counties, including the cities of Kennewick, Pasco, Richland, West Richland, Benton City, and Prosser. The contract is anticipated as a one-year agreement with an option to extend for an additional year, with a total maximum award amount not to exceed 2,000,000 dollars. The scope of work includes the construction of ADA-compliant concrete pads with slip-resistant surfaces and positive drainage, as well as the installation of various amenities such as shelters, benches, display cases, bike racks, and trash receptacles. Bids are due by November 10, 2026, and must be submitted via the OpenGov Procurement Portal or by mail. The award will be granted to the most responsive and responsible bidder offering the lowest overall cost, calculated by multiplying proposed unit prices by the bid evaluation quantities. Requirements for bidders include a 5 percent bid security, a current Washington State contractor registration, and the provision of performance and payment bonds equal to 100 percent of the contract sum. Once work orders are executed, concrete pad construction must be completed within 21 calendar days of approved permitting, while amenity installations must be completed within 14 calendar days. All work must adhere to BFT Bus Stop Design Standards and local municipal codes.
Poured Concrete Foundation and Structure Contractors

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 332311
New
SLED
Bus Shelters and Amenities
Solicitation # 26-15
Ben Franklin Transit (BFT) is soliciting proposals under RFP 26-15 for a contractor to design, fabricate, and deliver prefabricated bus stop shelters for use at individual stops, transit centers, and in partnership with local entities. The project requires shelters to be designed by a Registered Architect and structurally engineered to be weatherproof, vandal-resistant, and maintenance-free, utilizing clear tempered safety glass and anti-graffiti coating. All units must comply with ADA requirements and applicable building codes. The contract includes an initial minimum order of ten shelters, with the option for BFT to purchase additional units of varying sizes over a potential five-year term. Deliverables must be shipped knock-down and individually packaged with comprehensive technical documentation, assembly instructions, and estimated setup times. The initial order must be delivered within 120 calendar days of the Notice to Proceed. Proposals are due by December 8, 2026, and will be evaluated on a best-value basis, focusing on structural integrity, durability, aesthetics, and long-term performance. Applicants must provide a statement of qualifications including three to six projects completed within the last five years and certifications regarding debarment and non-collusion. The contract is governed by Washington State and Federal jurisprudence, with jurisdiction in Benton County, Washington. Payment terms are set at thirty calendar days following the receipt of a proper invoice. BFT also emphasizes equal opportunity and encourages participation from certified Disadvantaged Business Enterprises.
Prefabricated Metal Building and Component Manufacturing

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS