Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tied Concrete Block Mat and Riprap Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Iowa Department of Agriculture and Land Stewardship involves the installation of erosion control materials for nutrient reduction wetland projects in Grundy County. The scope of work includes the installation of 14,800 square feet of Flexamat Plus tied concrete block mat, 220 tons of riprap, 393 square yards of Class 3 Geotextile Fabric, and 2,400 square yards of mulch blankets to deliver armored channels and stabilized slopes. The project is categorized under NAICS code 238990. There is no specified set-aside status for this contract. To be eligible, the contractor must be registered with the Iowa Department of Inspections, Appeals and Licensing. The response deadline for this opportunity is December 30, 2026.

General Info

Iowa Department of Agriculture subcontract for erosion control installation in Grundy County.

Place of Performance

Grundy County, IA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-20.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-20 Gru891821B (Grundy)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 38 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 8 documents on the prime contractFrom 26-20 Gru891821B (Grundy)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs erosion control materials for prime contractors on Iowa Department of Agriculture and Land Stewardship nutrient reduction wetland projects. Installs 14,800 square feet of Flexamat Plus tied concrete block mat, 220 tons of riprap (4" to 12"), 393 SY of Class 3 Geotextile Fabric, and 2,400 SY of mulch blankets. Must be registered with the Iowa Department of Inspections, Appeals and Licensing. Delivers armored channels and stabilized slopes.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS