Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 25, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tillamook South Jetty Repairs - Solicitation

Closed
W9127N22B0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 10 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 15 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Tillamook, OR, USA

Set-Aside

NONE

Documents

11

Amendment 0004 - MOF Construction Specifications

PDF, High priority: read this firstamendment
High

Amendment 0004 - W9127N22B0007 (Tillamook South Jetty Repairs)

PDF, High priority: read this firstamendment
High

W9127N22B0007 Amendment 0001 - Tillamook South Jetty Repairs

PDF, High priority: read this firstamendment
High

W9127N22B0007 Amendment 0002 - Tillamook South Jetty Repairs

PDF, High priority: read this firstamendment
High

W9127N22B0007 Amendment 0003 - Tillamook South Jetty Repairs

PDF, High priority: read this firstamendment
High

W9127N22B0007 Amendment 0008 - Tillamook South Jetty Repairs

PDF, High priority: read this firstamendment
High

W9127N22B0007 Amendment 0009 - Tillamook South Jetty Repairs

PDF, High priority: read this firstamendment
High

W9127N22B0007 Tillamook South Jetty Repair Plan Set

PDF, High priority: read this firstspecifications
High

W9127N22B0007 - Tillamook South Jetty Repairs

PDF, High priority: read this firstifb
High

W9127N22B0007 - Tillamook South Jetty Repairs Abstract of Offers

PDF, High priority: read this firstabstract-of-offers
High

W9127NXXRXXX Small Business Subcontracting Plan Template

DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts

Full Description

Show more
4/25/2023: Please find attached, an amendment to reopen the solicitation, negating the action taken through amendment 0008. An award from a bid submitted in response to this solicitation is being considered." ---------------------------------------------------------------------------------------------------------------------------- 4/14/2023: Please find attached, an amendment to cancel the solicitation after bid opening. No award will be made from this solicitation. ---------------------------------------------------------------------------------------------------------------------------- Bid Abstract uploaded. ----------------------------------------------------------------------------------------------------------------------------- Amendment 0004 The purpose of this amendment is to make updates to the following sections in the Specifications: Section 35 52 00.00 25, Page 6: Section 3.3f Section 35 52 00.00 25, Page 9: Section 3.5 See attachment "Amendment 0004 with Comments" for further details. ------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment 0003 The purpose of this amendment is to revise parts of the plans and specs, specifically: 1) The following plan sheets were revised: G-002 G-012 CS101 CS102 CS103 2) The following sections in the specs were revised: Section 31 00 10.00 25, Page 5: Sec 3.4.a (2 revisions) Section 31 00 10.00 25, Page 5: Sect 3.4b Section 31 00 10.00 25, Page 5: Sect 3.4c Section 31 00 10.00 25, Page 5: Sect 3.4d Section 31 00 10.00 25, Page 6: Sect 3.6a (2 revisions) Section 31 11 00.00 25, Page 2: Sect 3.2 Section 32 90 00.00 25, Page 4: Sect 1.4.2a Section 35 20 23.13 25, Page 5: Sect 3.1.4b Attachment 5 - Final IHAs Attachment 7 - SLOPES document with confirmation emails attached at end. -------------------------------------------------------------------------------------------------------------------------------------------------------------- A Subcontracting Plan Template is attached. --------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0002 The purpose of this amendment is to correct the error on the date of the Site Visit. For clarification, the Site Visit is scheduled for August 9, 2022 at 10AM PDT. ----------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 The purpose of this amendment is to change the deadline to RSVP for the scheduled site visit. The response date is now Monday, August 8, 2022 at 1400PDT. All other terms and conditions remain unchanged. -------------------------------------------------------------------------------------------------------------------------------------------------------------------- 1. Contract Information. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) has been tasked to solicit a contract for the Tillamook South Jetty Repair. The proposed project will be a competitive, firm-fixed price (FFP) contract. 2. Project Background. The project is located iin Tillamook Bay on the Oregon Coast, about 47 miles south of the mouth of the Columbia River. Tillamook Bay is a tidal estuary about 6 miles long, north to south, and a maximum of 3 miles wide. Five major rivers flow into Tillamook Bay. The ocean entrance to the bay is located at its northern end and is protected by two jetties, a north jetty and a south jetty. The U.S. Army Corps of Engineers (USACE) constructed and maintains the two jetties for the purpose of providing reliable navigation into and out of the bay. The south jetty was constructed in three stages between 1969 and 1979 to a length of 8,025 feet. Since then, the south jetty has received no repairs despite having sustained damage and lost jetty length. A recent apparent increase in the Pacific Ocean wave climate has exposed both jetties to more extreme storm waves, especially the south jetty which is more exposed to southwesterly storm events. The south jetty's head is destroyed, and the trunk continues to be damaged and lose length. Repairs to the south jetty are needed to address existing damage, restore the structural integrity of the jetty, provide additional protection for the north jetty from large southerly waves, reduce navigational hazards to boaters, and ensure safe and reliable passage to shipping traffic. Description of Work. Proposed repairs to the south jetty include rebuilding the jetty head with an approximate 100-foot cap and approximately 1,350 feet of the jetty trunk onto an existing relic structure. The relic structure is a mound of displaced stones from the original jetty formed underwater. The south jetty head section will be constructed with a 40-foot crest width and 1V:2.5H side slopes both channel-side and ocean-side, and a crest elevation of +18 feet NAVD88. The south jetty trunk sections will be constructed with a 30-foot crest width, +18 feet NAVD88 crest elevation, and varying side slopes depending upon location, from 1V:2.5H along the ocean-side and 1V:2.5H to 1V:1.5H along the channel-side. The estimated stone volume required for the south jetty repairs is approximately 9,900 cubic yards (CY) of 180 pounds per cubic foot (pcf) stone, 15,800 CY of 175 pcf stone, and 3,200 CY of 167 pcf stone. Access to the south jetty is from Bayocean Dike Road. The approximate 3-mile section of this road between the Tillamook County Bayocean Peninsula Park parking lot and the south end of the Kincheloe Point, where a barge material off-loading area is available, is an unmaintained, single-lane, dirt road, with several segments that have significant erosional undercutting of the road embankment. This section of road will not support heavy construction vehicles and the truck transport of materials ans to be used only for transport of personnel. The section of Bayocean Dike Road between the material off-loading area at Kincheloe Point and the ocean-most dune line near the south jetty root is an unmaintained, single-lane, dirt road. Prior to using this road section for construction vehicles and equipment, the road section will require vegetation clearing, debris and rock removal, widening, and repairs. In addition, a segment of this road near the end of the jetty root has been washed out and will require reconstruction prior to use. All road improvements will be subject to environmental requirements to protect existing wetland areas adjacent to roads and Western Snowy Plover critical habitat areas near the south jetty root. Previous construction of the south jetty involved use of a material off-loading facility at Kincheloe Point to off-load materials that were barged. The contractor may elect to construct a temporary barge off-loading facility. Dredging would likely be required to allow fully loaded barges to access the material off-loading facility. Based on the conditions at the anticipated material off-loading facility location, it is estimated that 5,000 cubic yards of sediment would be dredged from the area adjacent to the shore where the barge would likely be moored. All dredged material will be transported and placed in the designated staging area near the jetty root and upgraded to enhance Western Snowy Plover critical habitat. The environmental permits obtained for the project would restrict any installation of pilings for the material off-loading facility to an in-water work window between November 1 and February 15. For the south jetty construction work, there is an approximate 47-acre area near the jetty root available for temporary material and equipment staging and storage. Areas used for staging and storage will require grading at project completion. The anticipated period of performance for the repair work is September 2022 through November 2024. The estimated magnitude of construction for this project is between $25,000,000 and $100,000,000. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. All interested firms must be registered in the System for Award Management (SAM) and remain current for the duration of the contract to be eligible for award of a Government contract.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
The Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement project in Cascade Locks, Oregon, is a total small business set-aside procurement issued by the USACE Portland District. The project involves replacing a seismically deficient 248-foot swing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, shoulders, and a sidewalk. The scope includes partial demolition of the existing structure, construction of a concrete stub abutment anchored into rock and a south abutment supported by drilled shafts, and the development of approach roadways. Due to the requirement for continuous vehicular access, the work will likely be performed in phases and must adhere to strict environmental and seasonal restrictions, including specific in-water work windows for 2029 and 2030. The contract is a firm-fixed price agreement with a performance period of 1,295 calendar days from the notice to proceed. Key technical requirements include lead and asbestos removal, barge crane lifting near high-voltage power lines, and compliance with CMMC Level 1 cybersecurity standards. Specialized qualifications are required for ground anchors, jet grouting, and professional archaeological monitoring. The project is subject to rigorous quality control and inspection processes, including a three-stage sequence of punch-out, pre-final, and final acceptance inspections. Bidders must provide a bid guarantee and 100 percent performance and payment bonds. The final solicitation closing date was extended to October 29, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 484220
Federal
Pre-Solicitation Notice - Bonneville Dam Equipment Transport Blanket Purchase Agreement (BPA)
Solicitation # W9127N27A0001
The U.S. Army Corps of Engineers, Northwestern Division, Portland District intends to establish a Blanket Purchase Agreement (BPA) for commercial equipment transport services at the Bonneville Lock and Dam. This 100% small business set-aside, categorized under NAICS 484220, involves the on-call transport of light to heavy-haul equipment, ranging from 1.5 to 60 tons, between facilities on the Oregon and Washington shores via public highways. The agreement will span a five-year ordering period with an estimated annual volume of 60,000 dollars and a total potential value of up to 300,000 dollars. Selected BPA holders will be required to provide DOT-compliant vehicles and manage all route planning, including obtaining necessary permits from local, state, and federal authorities. Performance standards include a standard response time of 48 hours and a best-effort emergency response within 12 hours. For call orders under 2,500 dollars, selection will be based primarily on cost and availability with payment via credit card; orders exceeding 2,500 dollars will be competed among BPA holders and paid via electronic invoice. Contractors must maintain current insurance, adhere to FMCSA securement regulations, and submit a Quality Control Plan for government approval prior to the post-award conference.
Specialized Freight (except Used Goods) Trucking, Local

POSTED

14 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 238220
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

19 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS