Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Tilting Weir Gate Fabrication & Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Tilting Weir Gate Fabrication and Installation involves providing specialized water control infrastructure for prime contractors working with the Department of Santa Clara Valley Water District in California. The scope of work includes the fabrication of tilting weir crest gates designed for 60 to 70-degree angles, as well as the installation of critical mechanical components such as hoist systems, gear boxes, wire ropes, and hoisting drums. The contractor is responsible for delivering a fully operational system, which encompasses the initial startup, calibration, and commissioning phases, along with providing necessary training for gate operations. Interested parties must submit their responses by November 18, 2026, under NAICS code 332312.

General Info

Subcontract for fabricating and installing tilting weir gates for Santa Clara Valley Water.

Documents

This scope was carved out of VW0719.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

C0720 Coyote Percolation Dam Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Contracts & Support #335 Department of Santa Clara Valley Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnishes and installs tilting weir (crest) gates for prime contractors on Water District water control projects. Fabricates gates designed for 60 to 70-degree angles, installs hoist systems, gear boxes, wire ropes, and hoisting drums. Performs startup, calibration, commissioning, and training for gate operations. Delivers a fully operational tilting weir gate system.

Similar Contracts

Same NAICS industry code

More opportunities from California → Construction Contracts & Support #335 Department of Santa Clara Valley Water District

Same awarding agency

NAICS: 237990
SLED
C0720 Coyote Percolation Dam Phase 2
Solicitation # VW0719
The Coyote Percolation Dam Phase 2 project, solicitation VW0719, is a construction contract issued by the Santa Clara Valley Water District for work in San Jose, California. The project focuses on fish passage enhancement and includes the construction of an approximately 500 linear foot fish passage lane using engineered streambed materials, gate replacement, and channel modifications. The estimated project cost ranges between 7.5 million and 9 million dollars, with a total performance period of 724 calendar days. Work is structured across five milestones, encompassing mobilization, two seasons of in-channel construction, a winter shutdown for offsite fabrication, and final commissioning and closeout. Bids are due electronically via the PlanetBids portal by November 18, 2026, at 2:00 p.m. A responsive bid requires a 10 percent electronic bid bond and the completion of several mandatory certifications, including a Non-Collusion Affidavit, CARB In-Use Off-Road Diesel Fueled Fleet compliance, and certifications regarding sanctions on Russia and business activities in Iran. The contract establishes a 30 percent minimum participation goal for Small Business Enterprises (SBE). Award will be granted to the responsible bidder submitting the lowest responsive bid. The contractor must provide performance and payment bonds and adhere to public works prevailing wage requirements and a Project Labor Agreement if the project exceeds 2 million dollars.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS