Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on October 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Timber Creek Bridge Water Line Lowering Project

Closed
2026-7-BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract for the Timber Creek Bridge Water Line Lowering Project in Flower Mound, Texas, involves constructing approximately 400 linear feet of 12-inch water line beneath Timber Creek via jack and bore methods. The project scope requires furnishing all labor, equipment, and materials, with detailed technical specifications, plans, and standards incorporated by reference, including local, state, and federal regulations such as OSHA standards, TxDOT specifications, and regional construction standards. The work is scheduled to commence within 10 days of the Notice to Proceed, with a substantial completion deadline of 60 days and final completion within 90 days, subject to liquidated damages for delays. The project’s engineer’s estimate is approximately $290,000, and bids are to be submitted by November 11, 2025, with questions due by November 4, 2025. The procurement process emphasizes responsible bidding, requiring submission of all proposal pages, a 5% bid bond, and detailed subcontractor qualifications. The award will be based on the Lowest Price Technically Acceptable method, prioritizing responsiveness, responsibility, bid price, and subcontractor qualifications. Contract administration is managed through the Town’s Purchasing Department, with payments processed via ACH following submission of appropriate forms, and final acceptance contingent upon on-site inspection and testing by approved laboratories. The contract includes strict compliance with environmental, safety, and local standards, and mandates that all reinforcement steel be domestically manufactured. No federal clause numbers or MIL-STD standards are explicitly referenced; instead, the contract incorporates comprehensive standards and conditions governing safety, environmental protection, and construction quality.

General Info

Agency

Texas → Town of Flower Mound

Place of Performance

TX, USA

Set-Aside

NONE

Documents

4

2026-7-B Timber Creek Bridge Water Line Lowering Project IFB

PDF, High priority: read this firstifb
High

Timber Creek Bridge Water Line Lowering BID #2026-7-B IFB

PDF, High priority: read this first150 pages · ifb
High

Timber Creek Bridge Water Line Lowering IFB Plans - Bid Number 2026-7-B

PDF, High priority: read this first19 pages · ifb
High

Town of Flower Mound Vendor Information Sheet for RFB No. 2026-7-B

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Town of Flower Mound
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → Town of Flower Mound
Office AddressN/A
Contacts
Sabrina R. Zadow Purchasing Manager

Full Description

Show more
PREFACE: Important Instructions for All Bidders:   **Please read the bid instructions carefully and comply with these instructions as each bid will be reviewed for compliance. All proposal pages P-1 thru P-31 must be completed and submitted with your bid response including Sub-Contractor Qualifications.   Deviating from instructions could result in your bid being considered non-responsive.          The Town of Flower Mound is accepting sealed bids for the following item at the herein stated location until the due date and time stated below:  RFB No: 2026-7-B – Timber Creek Bridge Water Line Lowering Project Questions Deadline: 11/4/2025 at 12:00pm (CT) Due Date and Time: 11/11/2025 at 11:00am (CT) Engineer’s Estimate: $290,000.00    All questions must be submitted in writing (no exceptions) to contact@example.gov.  Questions will not be answered over the phone by the Engineer and/or Engineering Design Firm.   Location to Submit Responses: Town of Flower Mound, Attn: Sabrina Zadow, Purchasing Manager, 2121 Cross Timbers Road, Flower Mound, TX 75028      Hard copy set of plans and specs may be obtained at the herein stated submittal location for a fee of $50.00 per set. The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of approximately 400 linear feet of 12” water line by jack and bore underneath Timber Creek. The Timber Creek Bridge Water Line Lowering project is located approximately 300 feet northwest of the intersection of Timber Creek Rd and Rollo Ct.                           

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS