Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on October 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Marais Des Cygnes River 2D Modeling Project

Closed
2025-043State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Lift Station Communication Improvement (FEMA)
Solicitation # 26-051UM-RFP
The City of Plant City is soliciting proposals under solicitation 26-051UM-RFP for a turnkey engineering design and implementation project to modernize the communication network for 55 wastewater lift stations. The project focuses on replacing or integrating Remote Terminal Unit (RTU) hardware and deploying a new cellular-based communication network to ensure seamless connectivity with the City's SCADA system. This initiative is partially funded by a FEMA grant via the Florida Division of Emergency Management, requiring all work to adhere to strict standards for system hardening, operational continuity, and disaster resilience. The project includes the delivery of pre-configured communication assemblies and requires installation by a licensed electrical contractor, with system startup performed by the supplier. The selection process utilizes a points-based evaluation focusing on the logical sequencing of the proposed project schedule, the credentials of the proposer, and a track record of at least three similar projects completed in Florida within the last ten years. Bidders must provide itemized pricing for site-specific materials and project-wide labor. Compliance requirements are extensive, including adherence to the Davis-Bacon Act, Equal Employment Opportunity regulations, the Americans with Disabilities Act, and specific FEMA sub-recipient agreement terms. Proposals are due by 2:00 pm local time on November 19, 2026, and must include a baseline project schedule, a human trafficking affidavit, and certifications regarding foreign country entities. Final acceptance of the work by the City is required before any applicable warranty periods commence.
Utilities Maintenance

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
SLED
Cellular Service Site Assessment and Feasibility Study
Solicitation # 2026-TA-0906
The Town of Nantucket, through its Town Administration, is soliciting proposals for a Cellular Service Site Assessment and Feasibility Study under solicitation number 2026-TA-0906. The project requires licensed professionals to evaluate the physical, structural, and regulatory suitability of the Town's water storage tanks for future telecommunications use. Key deliverables include a comprehensive final report and presentation, as well as a regulatory and permitting assessment identifying necessary approvals from the FCC, Massachusetts DEP, and the Nantucket Historic District Commission. The anticipated period of performance is twelve months, and the selected contractor must provide a detailed work plan and timeline. Proposals must be submitted electronically by November 4, 2026, divided into separate technical and price volumes. To be considered, firms must meet minimum qualifications, including at least three years of full-time experience in similar work and a proven ability to complete projects for comparable or larger municipalities. Evaluation is based on a minimum quality review followed by a comparative ranking of finalists based on project understanding and relevant experience. The Town will negotiate with the highest-ranked finalist whose price falls within the budgeted amount. The contract is governed by the laws of the Commonwealth of Massachusetts and requires the contractor to enter into the Town's standard 30B Form Service Agreement. Mandatory requirements include providing a Tax Compliance Certification, a Certificate of Non-Collusion, and evidence of financial stability. Comprehensive insurance coverage is required, including Commercial General Liability of $1 million per occurrence, a $3 million Umbrella/Excess Liability policy, and Workers' Compensation in accordance with Massachusetts General Laws. Payment terms are set at thirty days following the receipt of a satisfactory invoice.
Town Administration

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Fruitland Sewer Extension Preliminary Engineering Report
Solicitation # 2027-RFP-033
Wicomico County is soliciting proposals under solicitation 2027-RFP-033 for professional engineering services to develop a Preliminary Engineering Report (PER) for the Fruitland Sewer Extension Project. The primary objective is to evaluate alternatives for providing public sewer service to seven specific focus areas around Fruitland, prioritizing locations prone to septic system failure. The project assumes connection to the City of Fruitland municipal sewer system and treatment at the City of Fruitland WWTP. While the scope excludes analysis of the treatment plant's capacity, the selected vendor must identify necessary upgrades for existing downstream pumping stations and sanitary sewers. The PER must comply with USDA RUS Bulletin 1780-2 and build upon the Wicomico County Water and Sewer Master Plan from September 2021. The contract will be awarded based on best value for money, with evaluation heavily weighted toward demonstrated experience, technical expertise, and project approach (35%), as well as the capacity to deliver products timely (15%). Required deliverables include a life cycle present worth cost analysis of feasible options, detailed cost estimates, and conceptual schematics. The successful vendor must provide a lump sum fee proposal and execute an Agreement for Engineering Services using EJCDC documents per RUS Bulletin 1780-26. Key administrative requirements include providing a Maryland Certificate of Status, submitting insurance certificates within ten days of award, and executing the contract within fourteen days of receipt. Proposals are due by December 2, 2026, at 2:30 pm via the electronic procurement portal.
Public Works

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to the Marais Des Cygnes River 2D Modeling Project within Johnson County’s Stormwater Management Program, which is overseen by the Urban Services Division of the Public Works Department. The project aims to evaluate the benefits of advanced 2D hydrologic and hydraulic modeling across approximately 125 miles of streamways and a drainage area of 76 square miles, focusing on three sub-watersheds: Big Bull Creek, Little Bull Creek, and Ten Mile Creek. The initiative is funded through a dedicated sales tax and is guided by the Stormwater Management Advisory Council, representing 20 municipalities in Johnson County. The scope involves detailed technical modeling efforts to improve stormwater management strategies in the watershed, with a contract value estimated between $500,000 and $1.5 million. The procurement process is structured around a formal Request for Proposal (RFP) issued in October 2025, with a submission deadline in November 2025. The RFP emphasizes compliance with federal regulations, including the requirements outlined in 2 CFR Part 200, which govern federal awards and funding. The documents specify detailed project requirements, evaluation criteria, and contractual obligations, including adherence to federal statutes such as equal employment opportunity, Davis Bacon Act, and anti-kickback provisions. The project also involves strict guidelines for proposal submission, including cybersecurity measures, required documentation, and vendor qualifications. Additional related solicitations include bids for construction projects, recycling services, and other municipal procurement activities, demonstrating Johnson County’s comprehensive approach to infrastructure, environmental management, and community services.

General Info

Place of Performance

KS, USA

Set-Aside

NONE

Documents

21

2025-043 Athletic Track Repairs at Bristol Eastern High School ITB

PDF, High priority: read this firstitb
High

2025-043 Miscellaneous Electric Supplies RFQ

PDF, High priority: read this firstrfq
High

Advertisement for Bids - Wilson Creek Park Phase 1, Bid #2025-043

DOCX, High priority: read this firstadvertisement-for-bids
High

Appendix A - 2CFR200 Federal Terms and Conditions

DOCX, High priority: read this firstcontract-document
High

Bid 2025-043 One (1) 3400 Gallon Slide-in Brine Tank System

PDF, High priority: read this firstifb
High

Bid 2025-043 - One (1) 3400 Gallon Slide-in Brine Tank System

PDF, High priority: read this firstrfq
High

Bid Invitation 2025-043 Wilson Creek Park Phase 1

PDF, High priority: read this firstrfb
High

Electric Commodity Special Conditions for Electric Distribution Materials

PDF, High priority: read this first1 page · special-notice
High

Instructions to Bidders - Commodities

PDF, High priority: read this first2 pages · instructions-to-bidders
High

Johnson County RFP 2025-043 Marais Des Cygnes River 2D Modeling Project

PDF, High priority: read this firstrfp
High

Johnson County RFP 2025-043 Marais Des Cygnes River 2D Modeling Project

PDF, High priority: read this firstrfp
High

RFB 2025-043 Snow Plowing Services for CCAR

PDF, High priority: read this firstrfb
High

RFP 2025-043 Marais Des Cygnes 2D Modeling Project

PDF, High priority: read this firstrfp
High

RFP 2025-043 Marais Des Cygnes River 2D Modeling Project

XLSX, High priority: read this firstaward
High

RFP 2025-043 Police Department Floor Removal and Installation

PDF, High priority: read this firstrfp
High

Bid Tabulation for RFP 2025-043 Marais Des Cygnes River 2D Modeling Project

XLSX, Low prioritybid-tabulation
Low

Bid Tabulation for RFP 2025-043 Marais Des Cygnes River 2D Modeling Project

XLSX, Low prioritybid-tabulation
Low

RFP 2025-043 Marais Des Cygnes River 2D Modeling Project Q&A

PDF, Low priorityq-and-a
Low

ESBD_428300_1750088087677_RFB 2025-043 Bid Package.pdf

PDF

ESBD_428300_1750088123280_RFB 2025-043 Zoom Information.pdf

PDF

ESBD_428300_1750088150596_RFB 2025-043 Plans - Link.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

16 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 11, 2024 to Sep 19, 2024. The notice title changed. NAICS code changed from 423610 to 423710. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Sep 19, 2024 to Nov 14, 2024. The notice title changed. NAICS code changed from 423710 to 561790. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Nov 14, 2024 to Dec 19, 2024. The notice title changed. NAICS code changed from 561790 to 333924. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Dec 19, 2024 to Dec 18, 2024. The notice title changed. NAICS code changed from 333924 to 541611. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Dec 18, 2024 to Dec 19, 2024. The notice title changed. NAICS code changed from 541611 to 236220. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Dec 19, 2024 to Feb 24, 2025. The notice title changed. NAICS code changed from 236220 to 541380. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Feb 24, 2025 to May 20, 2025. The notice title changed. NAICS code changed from 541380 to 339950. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from May 20, 2025 to Jun 5, 2025. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jun 5, 2025 to May 15, 2025. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from May 15, 2025 to Jun 13, 2025. The notice title changed. NAICS code added: 511210. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jun 13, 2025 to Jul 8, 2025. The notice title changed. NAICS code changed from 511210 to 237310. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 8, 2025 to Jul 16, 2025. The notice title changed. NAICS code changed from 237310 to 339950. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. NAICS code changed from 339950 to 325180. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 16, 2025 to Sep 1, 2025. The notice title changed. NAICS code changed from 325180 to 512110. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Sep 1, 2025 to Aug 28, 2025. The notice title changed. NAICS code changed from 512110 to 332911. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 28, 2025 to Nov 12, 2025. The notice title changed. NAICS code changed from 332911 to 541611. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
Contacts1 person available
OfficeKS, USA
Organization / AgencyKansas → Johnson County
Office AddressKS, USA

Full Description

Show more
The Johnson County Stormwater Management Program (SMP) is part of Johnson County’s Urban Services Division within the Public Works Department. The purpose of the SMP is to provide financial, technical, and planning support services for municipalities and unincorporated areas within Johnson County for the improvement of stormwater management. The SMP is funded currently through a dedicated 1/10th of one cent sales tax and is guided by the Stormwater Management Advisory Council (SMAC), a body representing the 20 cities in Johnson County. The SMP is exploring the advantages of 2D hydrologic and hydraulic modeling in Watershed Organization 4 in Johnson County, Kansas (Marais Des Cygnes River). The study area consists of approximately 125 miles of mapped streamways and 76 square miles of drainage area. The three sub-watersheds included in this study are Big Bull Creek, Little Bull Creek, and Ten Mile Creek (Sweetwater Creek, Tucker Branch).

More opportunities from Kansas → Johnson County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS