Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on June 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Timber Lakes Water Special Service Dist - Construction of Water System Capital Proj

Closed
NS24-203State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

AI Contract Overview

Show more

This contract involves the construction of a water system for the Timber Lakes Water Special Service District in Utah, with a total project value estimated between 1.5 million and 2.5 million dollars. The scope includes installing approximately 2,470 feet of 12-inch high-density polyethylene (HDPE) water pipes, 1,650 feet of 10-inch pipes, and 260 feet of 8-inch pipes. Additionally, the project encompasses the development of a new spring, the rehabilitation of an existing spring, and the construction of two new chlorination buildings to ensure water quality and system reliability. The project also involves the installation of eight new flow meter vaults to monitor water flow throughout the system. The solicitation was posted on June 5, 2024, with a response deadline of July 3, 2024. The project is managed by the Utah Department and falls under NAICS code 115310, which pertains to water and sewer line and related structures construction. Interested contractors can contact Nikki Sanchez via email for further details. The project aims to enhance the water infrastructure for the district, ensuring improved water delivery and quality for the community.

General Info

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

1

NS24-203 Timber Lakes Water Special Service Dist Construction of Water System

PDF, High priority: read this first3 pages · itb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
Contacts
Nikki Sanchez

Full Description

Show more
Approx 2,470 ft of 12-in, 1,650 ft of 10-in, & 260 ft of 8-in HDPE water pipes, eight new flow meter vaults, development of one new spring, rehab of 1 existing spring, & 2 new chlorination bldg.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS