TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract solicitation is specifically for holders of the Tinker AFB MAC Basic Ordering Agreement (BOA), focusing on the renovation of men’s and women’s restrooms in building B117 at Tinker Air Force Base. The project follows a Design-Bid-Build process and entails the complete demolition and replacement of all existing plumbing fixtures, domestic piping up to isolation valves, and sanitary sewer systems within the restrooms. The project is designated as a total small business set-aside under NAICS code 236220, reflecting construction work, and requires interested contractors to be registered MAC BOA holders with Tinker AFB. Interested prime contractors must RSVP within five calendar days of the posting by contacting the specified contracting points of contact to confirm their intent to attend the mandatory Initial Site Visit, scheduled for May 14, 2026, at 1:30 PM at building B117. The RSVP must also indicate whether attendees have base access or provide an Entry Access List for those requiring access. Subcontractors cannot RSVP directly but must do so through a prime contractor sponsor. Attendance at the Initial Site Visit is a requirement to be eligible to submit a proposal, with final proposals due by June 26, 2026. Contracting officers provided contact information for assistance, including support for accessing project-specific documents through a secure DoD Safe transmission process.
General Info
Agency
NAICS
Place of Performance
S Coffeyville, OK, 73145, USASet-Aside
Documents
(184)Section 10 28 13 Toilet Accessories Specification
Section 05 40 00 Cold-Formed Metal Framing Specification
Section 03 11 13.00 10 Structural Cast-In-Place Concrete Forming
Section 32 12 15 Airfield Paving Hot Mix Asphalt Specification
Section 05 50 13 Miscellaneous Metal Fabrications Specification
Section 32 01 22 Bituminous Rejuvenation Specification
Section 07 60 00 Flashing and Sheet Metal Specifications
HVAC System Cleaning Specification Section 23 01 30.41
Section 08 81 00 Glazing Specification
Att12_190023_Drawings_Final
Section 07 12 00 Built-Up Bituminous Waterproofing Specification
Section 07 31 13 Asphalt Shingles Specification
Section 04 20 00 Unit Masonry Specification
Section 22 00 00 Plumbing, General Purpose
Section 32 16 13 Concrete Sidewalks and Curbs and Gutters Specifications
Section 23 08 00 Commissioning of HVAC Systems
Section 23 52 00 Heating Boilers Guide Specification
Section 01 45 00.00 10 Quality Control Specification
Specification for Asphalt Treated Permeable Base (ATPB) Drainage Layer
Section 32 01 14 Asphalt Pavement Sealer Specification
Section 07 84 00 Firestopping Specification
Section 09 30 10 Ceramic, Quarry, and Glass Tiling Specification
EAL List for Construction Project WWYK190023 Renovate Restrooms B117
Environmental Requirements for Construction on Tinker AFB - Section 00 72 00
Section 23 35 00 Overhead Vehicle Tailpipe and Welding Fume Exhaust Removal System
Fire Detection and Alarm System Specification Section 28 31 00.00 10
Section 32 01 17 Crack Sealing in Asphalt Concrete Pavements
Section 10 21 13 Toilet Compartments Specification
Amendment 0001 to Solicitation FA813726R00300001
Wire Mesh Partitions Specification Section 10 22 13
Section 23 64 10 Water Chillers Vapor Compression Type Specification
Section 01 42 00 Sources for Reference Publications
190023 Renovate Restrooms B117 RFIs Final COR Signed
Section 23 81 00 Unitary Air Conditioning Equipment Guide Specification
Section 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment
WWYK20190023 Revision 02 Document
Section 08 41 13 Aluminum-Framed Entrances and Storefronts Specification
Section 08 11 13 Steel Doors and Frames Specification
Section 08 52 00 Wood Windows Specification
Section 01 50 00 Contractor Facilities
Section 26 05 48.00 10 Seismic Protection for Electrical Equipment
Section 06 10 00 Rough Carpentry Specifications
Section 23 05 93 Testing, Adjusting, and Balancing for HVAC
Section 02 41 00 Demolition and Deconstruction Specifications
Section 13 34 19 Metal Building Systems Specification
Section 32 11 29 Lime-Stabilized Subgrade Specification
Section 09 65 00 Resilient Flooring Specification
Solicitation FA813726R0030 Renovate Restrooms B117 Tinker AFB
Section 32 11 23 Aggregate Base Course Specification
Section 32 92 19 Seeding Specification
Section L - Instructions to Offerors for Construction Project
Section 23 65 00 Cooling Towers Guide Specification
Section 07 53 23 EPDM Roofing Specification
Electric Duct Heaters Specification Section 23 82 43.00 40
Section 26 00 00.00 20 Basic Electrical Materials and Methods
Section 09 72 00 Wallcoverings Specification
Fire Detection and Alarm System Specification Section 28 31 64.00 10
Section 32 13 14 Pavement Non-Airfield Specifications
Section 10 44 16 Fire Extinguishers Specification
Section 07 52 00 Modified Bituminous Membrane Roofing Specification
Section 08 34 01 Forced Entry Resistant Components Specification
Section 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control
General Requirements for Construction on Tinker Air Force Base
Wage Determination OK20260049 for Oklahoma County Building Construction
Section 32 13 11 Airfield Pavement Portland Cement Concrete
Fire Alarm Reporting System, Radio Type Specification Section 28 31 33.00 10
Section 32 17 23 Pavement Markings Specification
Section 09 68 00 Carpet Specification
Section 23 03 00 Basic Mechanical Materials and Methods
Section 32 84 24 Irrigation Sprinkler System Specification
Section 26 56 00 Exterior Lighting Specification
Tinker AFB Thermal Insulation Specification
Concrete Reinforcing Specification Section 03 20 00.00 10
Section 23 82 46.00 40 Electric Unit Heaters Specification
Section 07 54 19 Polyvinyl-Chloride Roofing Specification
Section 31 23 16 Excavation, Trenching, and Backfilling for Utilities
Section 26 29 23 Variable Frequency Drive Systems Under 600 Volts
Section 32 12 10.1 Bituminous Tack Coat Specification
Section 07 21 16 Mineral Fiber Blanket Insulation Specification
Section 32 13 74 Joint Sealing in Concrete Pavement Non-Jet-Fuel-Resistant
Welding Pressure Piping Specification Section 40 17 26.00 20
Section 09 22 00 Supports for Plaster and Gypsum Board
Section 08 11 16 Aluminum Doors and Frames Specification
Section 23 81 23 Computer Room Air Conditioning Units Specification
Section 10 22 39 Folding Panel Partitions Specification
Section 03 62 16 Metallic Non-Shrink Grouting Specification
Section 01 32 16.00 20 Small Project Construction Progress Schedules
Section 33 11 00 Water Utility Distribution Piping Specifications
Section 23 05 15 Common Piping for HVAC Specification
Section 06 61 16 Solid Surfacing Fabrications Specification
Section 23 36 00.00 40 Air Terminal Units Specification
Section 08 36 13 Sectional Overhead Doors Specification
Section 03 39 00.00 10 Concrete Curing Specification
Section 23 82 01 Warm Air Heating Systems Specification
Guide Specification for Forced Hot Water Heating System
Section 07 42 13 Metal Wall Panels Specification
Section 26 20 00 Interior Distribution System Specification
Section 26 41 00 Lightning Protection System Specification
Section M - Evaluation Factors for Award
Section 32 92 23 Sodding Specification
SOW Renovate Restrooms B117 Tinker AFB WWYK190023
Section 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids
Section 21 13 17 Dry Pipe Sprinkler System Specification
Section 06 41 16.00 10 Plastic Laminate Clad Architectural Cabinets
Section 07 51 13 Built-Up Asphalt Roofing Specification
LonWorks Direct Digital Control for HVAC Specification
Section 26 08 00 Apparatus Inspection and Testing
Section 05 12 00 Structural Steel Specification
Section 07 62 13 Copper Sheet Metal Flashing and Trim Specification
Section 07 72 20 Gravity-Type Roof Ventilators Specification
Section 31 00 00 Earthwork Specification
Special Provisions for Work on or Near Airfield at Tinker AFB
Section 23 54 16 Heating System Gas-Fired Heaters Guide Specification
Section 23 23 00 Refrigerant Piping Guide Specification
Tinker AFB Fuel Gas Piping Specification
Section 05 05 23.16 Structural Welding Specification
Specification for Diesel-Generator Set, Stationary 15-300 kW, Standby Applications
Section 26 36 00.00 10 Automatic Transfer Switch Specification
Section 09 51 00 Acoustical Ceilings Specification
Section 31 23 15 Excavation, Filling and Backfilling for Buildings
Section 32 01 18 - Joints in Concrete Flatwork Specification
Section 23 82 23.00 40 Unit Ventilators Specifications
Special Provisions for Working on Tinker AFB Section 00 80 00
Tinker AFB WWYK190023 Renovate Restrooms Submittal Register
Section 08 51 13 Aluminum Windows Specification
Section 23 34 23.00 40 HVAC Power Ventilators Specification
Section 01 78 23 Operation and Maintenance Data
Specification Section 26 28 01.00 10 Coordinated Power System Protection
Section 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems Specifications
Section 07 14 00 Fluid-Applied Waterproofing Specification
Section 07 92 00 Joint Sealants Specification
Section 08 71 00 Door Hardware Specifications
Section 01 33 00 Submittal Procedures
Section 07 19 00 Water Repellents Specification
Section 26 05 00.00 40 Common Work Results for Electrical
Section 09 29 00 Gypsum Board Technical Specifications
Steel Standing Seam Roofing Specification Section 07 61 14.00 20
Specification Section 26 23 00 Low-Voltage Switchgear
Section 32 01 16 Cold Milling Asphaltic Concrete Specification
Section 32 01 19 Field Molded Sealants Specification
13 48 00 Seismic Protection for Mechanical Equipment Specification
Section 21 13 13 Wet Pipe Sprinkler System Fire Protection
Section 32 13 73 Joint Sealing in Concrete Pavement Jet-Fuel-Resistant
Section 08 34 19.10 20 Rolling Service and Fire Doors Specification
Section 09 90 00 Paints and Coatings Specification
Section 31 23 06 Excavation, Embankment, and Preparation of Subgrade
Technical Specifications Table of Contents
Section 32 12 10.2 Bituminous Prime Coat Specification
Section 01 33 16.00 10 Design Data (Design After Award)
Section 32 01 17.62 Fabric Reinforcement for Asphalt Concrete Pavements
Section 01 78 00 Closeout Submittals
Table of Contents for Construction Contract at Tinker AFB
Specification 05 21 00 Steel Joist Framing
Section 23 08 01.00 20 Testing Industrial Ventilation Systems
Section 23 64 26 Chilled and Condenser Water Piping Systems Guide Specification
Section 03 30 00 Cast-in-Place Concrete Specifications
Section 33 71 02 Underground Electrical Distribution Specification
Section 23 70 03 Heating and Utilities Systems, Central Steam
Section 32 31 13 Chain Link Fences and Gates Specification
Interior Signage Specification Section 10 14 00.20
Section 08 56 53 Blast Resistant Tempered Glass Windows Specification
Section 10 14 00.10 Exterior Signage Specification
Specification Section 05 30 00 Steel Decks
Section 08 14 00 Wood Doors Specification
Section 23 82 16.00 40 Air Coils Specification
Section 08 33 23 Overhead Coiling Doors Specification
Section 07 42 63 Fabricated Wall Panel Assemblies Specification
Section 26 51 00 Interior Lighting Specifications
Tinker AFB Metal Roof System Specification
Section 26 42 14.00 10 Cathodic Protection System Specification
Section 10 26 00 Wall and Door Protection Specification
Section 07 22 00 Roof and Deck Insulation Specification
Section 23 25 00 Chemical Treatment of Water for Mechanical Systems
Specification 32 01 13 Spray Applications, Seal Coats, and Surface Treatments
General Safety Requirements for Construction on Tinker Air Force Base
Section 06 20 00 Finish Carpentry Specifications
Section 08 51 23 Steel Windows Specification
Section 07 24 00 Exterior Insulation and Finish Systems Specification
Section 23 31 13.00 40 Metal Ducts Specification
Section 33 40 00 Storm Drains Specification
Tinker General Requirements Change Log Aug 2022
Timeline
Contract was updated
Contract was updated
Contract was updated
Solicitation
Contract was updated
Contract was updated
Contract was updated
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 08 Jun 2026
Description of update>>> Uploaded 190023 Renovate Restrooms B117 Technical Specifications
Proposals due 29 Jun 2026
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
==========================================================================================
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 02 Jun 2026
Description of update>>> Uploaded 190023 Renovate Restrooms B117 RFIs_ FINAL_COR_Signed
Proposals due 29 Jun 2026
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
==========================================================================================
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 28 May 2026
Description of update>>> Uploaded Model.zip file containg as-builts and TAFB_Tech_Reqs (Div 02-48).zip. Contact the CO or CS listed in contact information if you are not able to access.
Proposals due 29 Jun 2026
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
==========================================================================================
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 22 May 2026
Description of update>>> Uploaded TAFB General Requirements (Div 00-01)
Proposals due 29 Jun 2026
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
==========================================================================================
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 21 May 2026
Description of update>>> Uploaded Initial Site Visit WWYK190023 and WWYK20190023_REV02_19MAY2026 Drawings. After the site visit, the Fire Department advised they would like an inswing door changed to outswing to minimize response times. Attached are the amended drawings. The only change is the door swing. No change in materials.
Proposals due 29 Jun 2026
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
==========================================================================================
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0030
Project Title: WWYK190023 – Renovate Restrooms, B117
Project Location: Tinker AFB - B117
Renovate men’s and women’s restrooms at B117 via Design-Bid-Build contract. This involved complete demolition and replacement of all the existing plumbing fixtures, domestic piping to iso valves, and sanitary sewer in both the men’s and women’s restrooms.
The project is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Initial Site Visit is set for May 14, 2026 – 1:30 PM – B117
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.