Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117

Closed
FA813726R0030Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 8 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

This solicitation for the renovation of men’s and women’s restrooms at Building 117 on Tinker Air Force Base is restricted exclusively to Small Business MAC Basic Ordering Agreement (BOA) holders and is conducted as a Total Small Business Set-Aside under FAR 19.5, using NAICS code 236220 with a size standard of $45 million in annual receipts. Proposals must be submitted by June 29, 2026, under solicitation number FA813726R0030, and only those prime contractors who attended the mandatory site visit on May 14, 2026, will be eligible for award. The contract employs a Firm Fixed Price arrangement, with award going to the lowest priced proposal that passes all technical acceptability thresholds, demonstrates price reasonableness, is found responsible, and fully conforms to solicitation requirements. The work involves complete demolition and replacement of plumbing fixtures, domestic piping to isolation valves, and sanitary sewer lines in both restrooms, requiring full compliance with Tinker AFB’s facility standards, environmental abatement protocols for asbestos, lead-based paint, and PCBs, and adherence to strict safety and health standards including OSHA regulations and respiratory protection programs. Offerors must submit proposals in specified formats without password protection or compressed files, include a bid guarantee of at least 20% of the proposal amount, and comply with SAM.gov registration and annual certification requirements. All electronic deliverables must be provided on DVD±R/RW media with labels printed directly on the disc, and all materials must be delivered in original, unopened packaging. The contract mandates a Project Manager, QC Manager, Site Safety and Health Officer, and Design Quality Manager on-site at all times, with a performance period of 625 calendar days following notice to proceed. Invoicing and payment will be processed exclusively through the Wide Area Workflow system, and all submittals, drawings, and documentation must be reviewed and approved in accordance with detailed technical specifications, including amended drawings reflecting a door swing change from in-swing to out-swing for improved emergency response times. Base access for contractor personnel requires prior submission of an Entry Access List, with subcontractors needing sponsorship by the prime contractor, and all personnel must comply with REAL ID Act requirements for unescorted entry to controlled areas.

General Info

Tinker AFB BOA holders renovate restrooms in building B117; mandatory site visit May 14, proposals due June 26.

Agency

Department Of Defense → FA8137 Afsc PziocView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

(185)

Section 10 28 13 Toilet Accessories Specification

PDFspecifications

Section 05 40 00 Cold-Formed Metal Framing Specification

PDFspecifications

Section 03 11 13.00 10 Structural Cast-In-Place Concrete Forming

PDFspecifications

Section 32 12 15 Airfield Paving Hot Mix Asphalt Specification

PDFspecifications

Section 05 50 13 Miscellaneous Metal Fabrications Specification

PDFspecifications

Section 32 01 22 Bituminous Rejuvenation Specification

PDFspecifications

Section 07 60 00 Flashing and Sheet Metal Specifications

PDFspecifications

HVAC System Cleaning Specification Section 23 01 30.41

PDFspecifications

Section 08 81 00 Glazing Specification

PDFspecifications

Att12_190023_Drawings_Final

PDFother

Section 07 12 00 Built-Up Bituminous Waterproofing Specification

PDFspecifications

Section 07 31 13 Asphalt Shingles Specification

PDFspecifications

Section 04 20 00 Unit Masonry Specification

PDFspecifications

Section 22 00 00 Plumbing, General Purpose

PDFspecifications

Section 32 16 13 Concrete Sidewalks and Curbs and Gutters Specifications

PDFspecifications

Section 23 08 00 Commissioning of HVAC Systems

PDFspecifications

Section 23 52 00 Heating Boilers Guide Specification

PDFspecifications

Section 01 45 00.00 10 Quality Control Specification

PDF12 pagesspecifications

Specification for Asphalt Treated Permeable Base (ATPB) Drainage Layer

PDFspecifications

Section 32 01 14 Asphalt Pavement Sealer Specification

PDFspecifications

Section 07 84 00 Firestopping Specification

PDFspecifications

Section 09 30 10 Ceramic, Quarry, and Glass Tiling Specification

PDFspecifications

EAL List for Construction Project WWYK190023 Renovate Restrooms B117

XLSXother

Environmental Requirements for Construction on Tinker AFB - Section 00 72 00

PDF89 pagessow

Section 23 35 00 Overhead Vehicle Tailpipe and Welding Fume Exhaust Removal System

PDFspecifications

Fire Detection and Alarm System Specification Section 28 31 00.00 10

PDFspecifications

Section 32 01 17 Crack Sealing in Asphalt Concrete Pavements

PDFspecifications

Section 10 21 13 Toilet Compartments Specification

PDFspecifications

Amendment 0001 to Solicitation FA813726R00300001

PDFamendment

Wire Mesh Partitions Specification Section 10 22 13

PDFspecifications

Section 23 64 10 Water Chillers Vapor Compression Type Specification

PDFspecifications

Section 01 42 00 Sources for Reference Publications

PDF4 pagesspecifications

190023 Renovate Restrooms B117 RFIs Final COR Signed

PDFq-and-a

Section 23 81 00 Unitary Air Conditioning Equipment Guide Specification

PDFspecifications

Section 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment

PDFspecifications

WWYK20190023 Revision 02 Document

PDFother

Section 08 41 13 Aluminum-Framed Entrances and Storefronts Specification

PDFspecifications

Section 08 11 13 Steel Doors and Frames Specification

PDFspecifications

Section 08 52 00 Wood Windows Specification

PDFspecifications

Section 01 50 00 Contractor Facilities

PDF8 pagessow

Section 26 05 48.00 10 Seismic Protection for Electrical Equipment

PDFspecifications

Section 06 10 00 Rough Carpentry Specifications

PDFspecifications

Section 23 05 93 Testing, Adjusting, and Balancing for HVAC

PDFspecifications

Section 02 41 00 Demolition and Deconstruction Specifications

PDFspecifications

Section 13 34 19 Metal Building Systems Specification

PDFspecifications

Section 32 11 29 Lime-Stabilized Subgrade Specification

PDFspecifications

Section 09 65 00 Resilient Flooring Specification

PDFspecifications

Solicitation FA813726R0030 Renovate Restrooms B117 Tinker AFB

PDFrfp

Section 32 11 23 Aggregate Base Course Specification

PDFspecifications

Section 32 92 19 Seeding Specification

PDFspecifications

Section L - Instructions to Offerors for Construction Project

PDF8 pagesinstructions-to-offerors

Section 23 65 00 Cooling Towers Guide Specification

PDFspecifications

Section 07 53 23 EPDM Roofing Specification

PDFspecifications

Electric Duct Heaters Specification Section 23 82 43.00 40

PDFspecifications

Section 26 00 00.00 20 Basic Electrical Materials and Methods

PDFspecifications

Section 09 72 00 Wallcoverings Specification

PDFspecifications

Fire Detection and Alarm System Specification Section 28 31 64.00 10

PDFspecifications

Section 32 13 14 Pavement Non-Airfield Specifications

PDFspecifications

Section 10 44 16 Fire Extinguishers Specification

PDFspecifications

Section 07 52 00 Modified Bituminous Membrane Roofing Specification

PDFspecifications

Section 08 34 01 Forced Entry Resistant Components Specification

PDFspecifications

Section 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control

PDFspecifications

General Requirements for Construction on Tinker Air Force Base

PDF16 pagessow

Wage Determination OK20260049 for Oklahoma County Building Construction

PDFwage-determination

Section 32 13 11 Airfield Pavement Portland Cement Concrete

PDFspecifications

Fire Alarm Reporting System, Radio Type Specification Section 28 31 33.00 10

PDFspecifications

Section 32 17 23 Pavement Markings Specification

PDFspecifications

Section 09 68 00 Carpet Specification

PDFspecifications

Section 23 03 00 Basic Mechanical Materials and Methods

PDFspecifications

Section 32 84 24 Irrigation Sprinkler System Specification

PDFspecifications

Section 26 56 00 Exterior Lighting Specification

PDFspecifications

Tinker AFB Thermal Insulation Specification

PDFspecifications

Concrete Reinforcing Specification Section 03 20 00.00 10

PDFspecifications

Section 23 82 46.00 40 Electric Unit Heaters Specification

PDFspecifications

Section 07 54 19 Polyvinyl-Chloride Roofing Specification

PDFspecifications

190023 Reno Restrooms B117 Pre-Bid RFI Follow-Up

PDFq-and-a

Section 31 23 16 Excavation, Trenching, and Backfilling for Utilities

PDFspecifications

Section 26 29 23 Variable Frequency Drive Systems Under 600 Volts

PDFspecifications

Model.zip

ZIP

Section 32 12 10.1 Bituminous Tack Coat Specification

PDFspecifications

Section 07 21 16 Mineral Fiber Blanket Insulation Specification

PDFspecifications

Section 32 13 74 Joint Sealing in Concrete Pavement Non-Jet-Fuel-Resistant

PDFspecifications

Welding Pressure Piping Specification Section 40 17 26.00 20

PDFspecifications

Section 09 22 00 Supports for Plaster and Gypsum Board

PDFspecifications

Section 08 11 16 Aluminum Doors and Frames Specification

PDFspecifications

Section 23 81 23 Computer Room Air Conditioning Units Specification

PDFspecifications

Section 10 22 39 Folding Panel Partitions Specification

PDFspecifications

Section 03 62 16 Metallic Non-Shrink Grouting Specification

PDFspecifications

Section 01 32 16.00 20 Small Project Construction Progress Schedules

PDF10 pagesspecifications

Section 33 11 00 Water Utility Distribution Piping Specifications

PDFspecifications

Section 23 05 15 Common Piping for HVAC Specification

PDFspecifications

Section 06 61 16 Solid Surfacing Fabrications Specification

PDFspecifications

Section 23 36 00.00 40 Air Terminal Units Specification

PDFspecifications

Section 08 36 13 Sectional Overhead Doors Specification

PDFspecifications

Section 03 39 00.00 10 Concrete Curing Specification

PDFspecifications

Section 23 82 01 Warm Air Heating Systems Specification

PDFspecifications

Guide Specification for Forced Hot Water Heating System

PDFspecifications

Section 07 42 13 Metal Wall Panels Specification

PDFspecifications

Section 26 20 00 Interior Distribution System Specification

PDFspecifications

Section 26 41 00 Lightning Protection System Specification

PDFspecifications

Section M - Evaluation Factors for Award

PDF5 pagesevaluation-factors

Section 32 92 23 Sodding Specification

PDFspecifications

Initial+Site+Visit+WWYK190023.pdf

PDF

SOW Renovate Restrooms B117 Tinker AFB WWYK190023

PDFsow

Section 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids

PDFspecifications

Section 21 13 17 Dry Pipe Sprinkler System Specification

PDFspecifications

Section 06 41 16.00 10 Plastic Laminate Clad Architectural Cabinets

PDFspecifications

Section 07 51 13 Built-Up Asphalt Roofing Specification

PDFspecifications

LonWorks Direct Digital Control for HVAC Specification

PDFspecifications

Section 26 08 00 Apparatus Inspection and Testing

PDFspecifications

Section 05 12 00 Structural Steel Specification

PDFspecifications

Section 07 62 13 Copper Sheet Metal Flashing and Trim Specification

PDFspecifications

Section 07 72 20 Gravity-Type Roof Ventilators Specification

PDFspecifications

Section 31 00 00 Earthwork Specification

PDFspecifications

Special Provisions for Work on or Near Airfield at Tinker AFB

PDF4 pagesspecial-provisions

Section 23 54 16 Heating System Gas-Fired Heaters Guide Specification

PDFspecifications

Section 23 23 00 Refrigerant Piping Guide Specification

PDFspecifications

Tinker AFB Fuel Gas Piping Specification

PDFspecifications

Section 05 05 23.16 Structural Welding Specification

PDFspecifications

Specification for Diesel-Generator Set, Stationary 15-300 kW, Standby Applications

PDFspecifications

Section 26 36 00.00 10 Automatic Transfer Switch Specification

PDFspecifications

Section 09 51 00 Acoustical Ceilings Specification

PDFspecifications

TAFB_Tech_Reqs+%28Div+02-48%29.zip

ZIP

Section 31 23 15 Excavation, Filling and Backfilling for Buildings

PDFspecifications

Section 32 01 18 - Joints in Concrete Flatwork Specification

PDFspecifications

Section 23 82 23.00 40 Unit Ventilators Specifications

PDFspecifications

Special Provisions for Working on Tinker AFB Section 00 80 00

PDF2 pagesspecial-provisions

Tinker AFB WWYK190023 Renovate Restrooms Submittal Register

PDFsubmittal-register

Section 08 51 13 Aluminum Windows Specification

PDFspecifications

Section 23 34 23.00 40 HVAC Power Ventilators Specification

PDFspecifications

Section 01 78 23 Operation and Maintenance Data

PDF14 pagessow

Specification Section 26 28 01.00 10 Coordinated Power System Protection

PDFspecifications

Section 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems Specifications

PDFspecifications

Section 07 14 00 Fluid-Applied Waterproofing Specification

PDFspecifications

Section 07 92 00 Joint Sealants Specification

PDFspecifications

Section 08 71 00 Door Hardware Specifications

PDFspecifications

Section 01 33 00 Submittal Procedures

PDF21 pagessow

Section 07 19 00 Water Repellents Specification

PDFspecifications

Section 26 05 00.00 40 Common Work Results for Electrical

PDFspecifications

Section 09 29 00 Gypsum Board Technical Specifications

PDFspecifications

Steel Standing Seam Roofing Specification Section 07 61 14.00 20

PDFspecifications

Specification Section 26 23 00 Low-Voltage Switchgear

PDFspecifications

Section 32 01 16 Cold Milling Asphaltic Concrete Specification

PDFspecifications

Section 32 01 19 Field Molded Sealants Specification

PDFspecifications

13 48 00 Seismic Protection for Mechanical Equipment Specification

PDFspecifications

Section 21 13 13 Wet Pipe Sprinkler System Fire Protection

PDFspecifications

Section 32 13 73 Joint Sealing in Concrete Pavement Jet-Fuel-Resistant

PDFspecifications

Section 08 34 19.10 20 Rolling Service and Fire Doors Specification

PDFspecifications

Section 09 90 00 Paints and Coatings Specification

PDFspecifications

Section 31 23 06 Excavation, Embankment, and Preparation of Subgrade

PDFspecifications

Technical Specifications Table of Contents

PDFspecifications

Section 32 12 10.2 Bituminous Prime Coat Specification

PDFspecifications

Section 01 33 16.00 10 Design Data (Design After Award)

PDF30 pagessow

Section 32 01 17.62 Fabric Reinforcement for Asphalt Concrete Pavements

PDFspecifications

Section 01 78 00 Closeout Submittals

PDF27 pagessow

Table of Contents for Construction Contract at Tinker AFB

PDF1 pageother

Specification 05 21 00 Steel Joist Framing

PDFspecifications

Section 23 08 01.00 20 Testing Industrial Ventilation Systems

PDFspecifications

Section 23 64 26 Chilled and Condenser Water Piping Systems Guide Specification

PDFspecifications

Section 03 30 00 Cast-in-Place Concrete Specifications

PDFspecifications

Section 33 71 02 Underground Electrical Distribution Specification

PDFspecifications

Section 23 70 03 Heating and Utilities Systems, Central Steam

PDFspecifications

Section 32 31 13 Chain Link Fences and Gates Specification

PDFspecifications

Interior Signage Specification Section 10 14 00.20

PDFspecifications

Section 08 56 53 Blast Resistant Tempered Glass Windows Specification

PDFspecifications

Section 10 14 00.10 Exterior Signage Specification

PDFspecifications

Specification Section 05 30 00 Steel Decks

PDFspecifications

Section 08 14 00 Wood Doors Specification

PDFspecifications

Section 23 82 16.00 40 Air Coils Specification

PDFspecifications

Section 08 33 23 Overhead Coiling Doors Specification

PDFspecifications

Section 07 42 63 Fabricated Wall Panel Assemblies Specification

PDFspecifications

Section 26 51 00 Interior Lighting Specifications

PDFspecifications

Tinker AFB Metal Roof System Specification

PDFspecifications

Section 26 42 14.00 10 Cathodic Protection System Specification

PDFspecifications

Section 10 26 00 Wall and Door Protection Specification

PDFspecifications

Section 07 22 00 Roof and Deck Insulation Specification

PDFspecifications

Section 23 25 00 Chemical Treatment of Water for Mechanical Systems

PDFspecifications

Specification 32 01 13 Spray Applications, Seal Coats, and Surface Treatments

PDFspecifications

General Safety Requirements for Construction on Tinker Air Force Base

PDF18 pagesspecifications

Section 06 20 00 Finish Carpentry Specifications

PDFspecifications

Section 08 51 23 Steel Windows Specification

PDFspecifications

Section 07 24 00 Exterior Insulation and Finish Systems Specification

PDFspecifications

Section 23 31 13.00 40 Metal Ducts Specification

PDFspecifications

Section 33 40 00 Storm Drains Specification

PDFspecifications

Tinker General Requirements Change Log Aug 2022

PDF2 pagesmodification

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Organization / Agency
Department Of Defense → FA8137 Afsc Pzioc
View Agency Profile
Office AddressTINKER AFB, OK, 73145-9125, USA

Full Description

Show more

Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 17 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 Pre Bid RFI Follow Up_COR_Signed


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 08 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 Solicitation Amendment FA813726R00300001


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 08 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 Technical Specifications


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 02 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 RFIs_ FINAL_COR_Signed


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 28 May 2026


Description of update>>>  Uploaded Model.zip file containg as-builts and TAFB_Tech_Reqs (Div 02-48).zip.  Contact the CO or CS listed in contact information if you are not able to access.


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 22 May 2026


Description of update>>>  Uploaded TAFB General Requirements (Div 00-01)


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 21 May 2026


Description of update>>>  Uploaded Initial Site Visit WWYK190023 and WWYK20190023_REV02_19MAY2026 Drawings.  After the site visit, the Fire Department advised they would like an inswing door changed to outswing to minimize response times.  Attached are the amended drawings.  The only change is the door swing.  No change in materials.


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



This posting is for Tinker AFB - MAC BOA Holders ONLY.  


Project Solicitation Number:  FA813726R0030 


Project Title: WWYK190023 – Renovate Restrooms, B117
Project Location: Tinker AFB - B117


Renovate men’s and women’s restrooms at B117 via Design-Bid-Build contract. This involved complete demolition and replacement of all the existing plumbing fixtures, domestic piping to iso valves, and sanitary sewer in both the men’s and women’s restrooms.


The project is restricted to SB MAC BOA holders only.


Project specific documents are attached to this posting.


If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  


After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 5 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.


After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.  Initial Site Visit is set for May 14, 2026 – 1:30 PM – B117


You must attend the Initial Site Visit for the project to be considered eligible to propose.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
TINKER AFB MAC BOA-WWYK260007- Renovate Pratt & Whitney Area - B3001
Solicitation # FA813726R0033
Solicitation FA813726R0033 is a negotiated request for proposal for the renovation of the Pratt and Whitney Area in Building 3001 at Tinker Air Force Base, Oklahoma. This project, identified as WWYK260007, is restricted to Tinker AFB MAC BOA holders and is a 100 percent small business set-aside. The scope involves a complete interior renovation of the second floor following flood damage, requiring design and engineering services, materials, labor, and the modification and rebalancing of existing HVAC and control systems. The project must comply with UFC, DoD, Air Force, IBC, and NFPA standards, as well as the Architectural Barriers Act for accessibility. The contract is awarded based on Lowest Priced Technically Acceptable (LPTA) procedures, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. The mandatory performance period requires the contractor to begin work within 10 calendar days of the notice to proceed and complete all activities within 329 calendar days. Proposals must include a technical volume and a detailed pricing volume, with construction costs broken down to CSI Level IV. The final deadline for proposal submission is September 11, 2026, by 2 PM CST. Key requirements include the submission of a bid bond, adherence to Davis-Bacon wage determinations, and the provision of key personnel resumes within five days of the notice to proceed.
Commercial and Institutional Building Construction

POSTED

about 24 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, and renovation projects for real property facilities at Tinker AFB, Oklahoma. The scope includes three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars and is structured with an initial five-year ordering period beginning March 26, 2027, followed by a five-year option period. The procurement is a partial small business set-aside under NAICS 236210. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including construction and design history, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to provide 100 percent performance and payment bonds for task orders and must adhere to strict TAFB facility standards, safety regulations, and cybersecurity requirements. Proposals must be submitted electronically to the designated MACC Workflow Org Box, and all offerors must maintain active registration in the System for Award Management.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS