Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117

Closed
FA813726R0030Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict material handling and labeling standards, particularly for wood products and electrical wiring. Compliance with the Americans with Disabilities Act, Buy American requirements, and prevailing wage rates for Glynn, Brantley, and McIntosh counties is mandatory. Proposals must be submitted electronically in separate price and technical volumes to the Contracting Officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, with evaluation factors including compliance with the Buy American Act. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and requires adherence to ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems. Quality assurance is managed through a multi-stage inspection process involving punch-out, pre-final, and final acceptance inspections. Monthly invoicing must be submitted via Wide Area Work Flow with required NAVFAC certifications and supporting documentation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 25 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must comply with six specific GFEs, with several mandatory requirements for a bid to be deemed responsive. Specifically, proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be included in the bid package. Documentation for outreach efforts may be submitted up to three business days after the bid closing date. Failure to meet these specific GFE requirements will result in the bid being deemed non-responsive.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the full bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, with Massachusetts state regulations prevailing if they are more stringent than federal requirements. The contract is a small business set-aside and requires a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a Massachusetts contractor's license, a W9, a completed vendor questionnaire, a wage rate certification, and a minimum 90-day bid guarantee. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Additionally, the selected contractor must provide payment and performance bonding for the full project value within ten days of award and maintain general liability insurance of at least one million dollars per occurrence. Pricing submitted in proposals must remain firm for 60 calendar days.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also requires extensive sitework involving rock excavation, grading, and wetland mitigation, as well as the installation of primary and secondary electrical distribution systems and new access roads. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

This solicitation for the renovation of men’s and women’s restrooms at Building 117 on Tinker Air Force Base is restricted exclusively to Small Business MAC Basic Ordering Agreement (BOA) holders and is conducted as a Total Small Business Set-Aside under FAR 19.5, using NAICS code 236220 with a size standard of $45 million in annual receipts. Proposals must be submitted by June 29, 2026, under solicitation number FA813726R0030, and only those prime contractors who attended the mandatory site visit on May 14, 2026, will be eligible for award. The contract employs a Firm Fixed Price arrangement, with award going to the lowest priced proposal that passes all technical acceptability thresholds, demonstrates price reasonableness, is found responsible, and fully conforms to solicitation requirements. The work involves complete demolition and replacement of plumbing fixtures, domestic piping to isolation valves, and sanitary sewer lines in both restrooms, requiring full compliance with Tinker AFB’s facility standards, environmental abatement protocols for asbestos, lead-based paint, and PCBs, and adherence to strict safety and health standards including OSHA regulations and respiratory protection programs. Offerors must submit proposals in specified formats without password protection or compressed files, include a bid guarantee of at least 20% of the proposal amount, and comply with SAM.gov registration and annual certification requirements. All electronic deliverables must be provided on DVD±R/RW media with labels printed directly on the disc, and all materials must be delivered in original, unopened packaging. The contract mandates a Project Manager, QC Manager, Site Safety and Health Officer, and Design Quality Manager on-site at all times, with a performance period of 625 calendar days following notice to proceed. Invoicing and payment will be processed exclusively through the Wide Area Workflow system, and all submittals, drawings, and documentation must be reviewed and approved in accordance with detailed technical specifications, including amended drawings reflecting a door swing change from in-swing to out-swing for improved emergency response times. Base access for contractor personnel requires prior submission of an Entry Access List, with subcontractors needing sponsorship by the prime contractor, and all personnel must comply with REAL ID Act requirements for unescorted entry to controlled areas.

General Info

Tinker AFB BOA holders renovate restrooms in building B117; mandatory site visit May 14, proposals due June 26.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

185

13 48 00 Seismic Protection for Mechanical Equipment Specification

PDF, High priority: read this firstspecifications
High

190023 Reno Restrooms B117 Pre-Bid RFI Follow-Up

PDF, High priority: read this firstq-and-a
High

190023 Renovate Restrooms B117 RFIs Final COR Signed

PDF, High priority: read this firstq-and-a
High

Amendment 0001 to Solicitation FA813726R00300001

PDF, High priority: read this firstamendment
High

Concrete Reinforcing Specification Section 03 20 00.00 10

PDF, High priority: read this firstspecifications
High

Electric Duct Heaters Specification Section 23 82 43.00 40

PDF, High priority: read this firstspecifications
High

Environmental Requirements for Construction on Tinker AFB - Section 00 72 00

PDF, High priority: read this first89 pages · sow
High

Fire Alarm Reporting System, Radio Type Specification Section 28 31 33.00 10

PDF, High priority: read this firstspecifications
High

Fire Detection and Alarm System Specification Section 28 31 00.00 10

PDF, High priority: read this firstspecifications
High

Fire Detection and Alarm System Specification Section 28 31 64.00 10

PDF, High priority: read this firstspecifications
High

General Requirements for Construction on Tinker Air Force Base

PDF, High priority: read this first16 pages · sow
High

General Safety Requirements for Construction on Tinker Air Force Base

PDF, High priority: read this first18 pages · specifications
High

Guide Specification for Forced Hot Water Heating System

PDF, High priority: read this firstspecifications
High

HVAC System Cleaning Specification Section 23 01 30.41

PDF, High priority: read this firstspecifications
High

Interior Signage Specification Section 10 14 00.20

PDF, High priority: read this firstspecifications
High

LonWorks Direct Digital Control for HVAC Specification

PDF, High priority: read this firstspecifications
High

Section 01 32 16.00 20 Small Project Construction Progress Schedules

PDF, High priority: read this first10 pages · specifications
High

Section 01 33 00 Submittal Procedures

PDF, High priority: read this first21 pages · sow
High

Section 01 33 16.00 10 Design Data (Design After Award)

PDF, High priority: read this first30 pages · sow
High

Section 01 45 00.00 10 Quality Control Specification

PDF, High priority: read this first12 pages · specifications
High

Section 01 50 00 Contractor Facilities

PDF, High priority: read this first8 pages · sow
High

Section 01 78 00 Closeout Submittals

PDF, High priority: read this first27 pages · sow
High

Section 01 78 23 Operation and Maintenance Data

PDF, High priority: read this first14 pages · sow
High

Section 02 41 00 Demolition and Deconstruction Specifications

PDF, High priority: read this firstspecifications
High

Section 03 11 13.00 10 Structural Cast-In-Place Concrete Forming

PDF, High priority: read this firstspecifications
High

Section 03 30 00 Cast-in-Place Concrete Specifications

PDF, High priority: read this firstspecifications
High

Section 03 39 00.00 10 Concrete Curing Specification

PDF, High priority: read this firstspecifications
High

Section 03 62 16 Metallic Non-Shrink Grouting Specification

PDF, High priority: read this firstspecifications
High

Section 04 20 00 Unit Masonry Specification

PDF, High priority: read this firstspecifications
High

Section 05 05 23.16 Structural Welding Specification

PDF, High priority: read this firstspecifications
High

Section 05 12 00 Structural Steel Specification

PDF, High priority: read this firstspecifications
High

Section 05 40 00 Cold-Formed Metal Framing Specification

PDF, High priority: read this firstspecifications
High

Section 05 50 13 Miscellaneous Metal Fabrications Specification

PDF, High priority: read this firstspecifications
High

Section 06 10 00 Rough Carpentry Specifications

PDF, High priority: read this firstspecifications
High

Section 06 20 00 Finish Carpentry Specifications

PDF, High priority: read this firstspecifications
High

Section 06 41 16.00 10 Plastic Laminate Clad Architectural Cabinets

PDF, High priority: read this firstspecifications
High

Section 06 61 16 Solid Surfacing Fabrications Specification

PDF, High priority: read this firstspecifications
High

Section 07 12 00 Built-Up Bituminous Waterproofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 14 00 Fluid-Applied Waterproofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 19 00 Water Repellents Specification

PDF, High priority: read this firstspecifications
High

Section 07 21 16 Mineral Fiber Blanket Insulation Specification

PDF, High priority: read this firstspecifications
High

Section 07 22 00 Roof and Deck Insulation Specification

PDF, High priority: read this firstspecifications
High

Section 07 24 00 Exterior Insulation and Finish Systems Specification

PDF, High priority: read this firstspecifications
High

Section 07 31 13 Asphalt Shingles Specification

PDF, High priority: read this firstspecifications
High

Section 07 42 13 Metal Wall Panels Specification

PDF, High priority: read this firstspecifications
High

Section 07 42 63 Fabricated Wall Panel Assemblies Specification

PDF, High priority: read this firstspecifications
High

Section 07 51 13 Built-Up Asphalt Roofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 52 00 Modified Bituminous Membrane Roofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 53 23 EPDM Roofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 54 19 Polyvinyl-Chloride Roofing Specification

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 26, 2026 to Jun 29, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA

Full Description

Show more

Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 17 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 Pre Bid RFI Follow Up_COR_Signed


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 08 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 Solicitation Amendment FA813726R00300001


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 08 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 Technical Specifications


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 02 Jun 2026


Description of update>>>  Uploaded 190023 Renovate Restrooms B117 RFIs_ FINAL_COR_Signed


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 28 May 2026


Description of update>>>  Uploaded Model.zip file containg as-builts and TAFB_Tech_Reqs (Div 02-48).zip.  Contact the CO or CS listed in contact information if you are not able to access.


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 22 May 2026


Description of update>>>  Uploaded TAFB General Requirements (Div 00-01)


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 21 May 2026


Description of update>>>  Uploaded Initial Site Visit WWYK190023 and WWYK20190023_REV02_19MAY2026 Drawings.  After the site visit, the Fire Department advised they would like an inswing door changed to outswing to minimize response times.  Attached are the amended drawings.  The only change is the door swing.  No change in materials.


Proposals due 29 Jun 2026


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


==========================================================================================



This posting is for Tinker AFB - MAC BOA Holders ONLY.  


Project Solicitation Number:  FA813726R0030 


Project Title: WWYK190023 – Renovate Restrooms, B117
Project Location: Tinker AFB - B117


Renovate men’s and women’s restrooms at B117 via Design-Bid-Build contract. This involved complete demolition and replacement of all the existing plumbing fixtures, domestic piping to iso valves, and sanitary sewer in both the men’s and women’s restrooms.


The project is restricted to SB MAC BOA holders only.


Project specific documents are attached to this posting.


If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  


After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 5 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.


After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.  Initial Site Visit is set for May 14, 2026 – 1:30 PM – B117


You must attend the Initial Site Visit for the project to be considered eligible to propose.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 237310
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details
NAICS: 238190
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

13 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS