Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on December 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TINKER AFB MAC BOA WWYK250031 - Repair B62528 (Round 2)

Closed
FA813726R0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

38

Building 62528 Floor Plan - Shawver As-Built Drawing E03

PDF, High priority: read this first1 page · specifications
High

FA813726R0001 - Repair B62528

PDF, High priority: read this firstifb
High

Repair B62528 (Round 2) RFI Responses

PDF, High priority: read this firstq-and-a
High

Solicitation FA813726R0001 - Construction, Alteration, or Repair

PDF, High priority: read this first39 pages · ifb
High

Statement of Work MACB Design-Build Repair B62528 WWYK250031

PDF, High priority: read this first28 pages · sow
High

Tinker Air Force Base Facility Standard 2020 Edition

PDF, High priority: read this first112 pages · facility-standard
High

860261.pdf

PDF, Low priorityother
Low

911035W.pdf

PDF, Low priorityother
Low

Building 62528 First Floor Plan

PDF, Low priority1 page · other
Low

Design Narrative WWYK250031 Repair B62528

PDF, Low priority41 pages · other
Low

Pre-Bid RFI Log for WWYK250031-Repair B62528

PDF, Low priority1 page · q-and-a
Low

Repair Heavy Metal Basin Facility Electrical Construction Design File 090204E-04

PDF, Low priority1 page · other
Low

Repair Heavy Metal Basin Facility IWTP B62528 Demolition Design File

PDF, Low priority1 page · other
Low

Repair Heavy Metal Basin Facility IWTP B62528 Demolition Drawing M02

PDF, Low priority1 page · other
Low

Repair Heavy Metal Basin Facility IWTP B62528 Design File

PDF, Low priority1 page · other
Low

Repair Heavy Metal Basin Facility IWTP B62528 Electrical Design File WWYK090204

PDF, Low priority1 page · other
Low

TAFB Electrical Standards 2024 Edition

PDF, Low priority28 pages · other
Low

Tinker AFB Fire Protection Standard 2023 Edition

PDF, Low priority9 pages · other
Low

Tinker AFB IWTP B62528 Heavy Metal Basin Repair Design Document 090204C-01

PDF, Low priority1 page · other
Low

Tinker AFB IWTP B62528 Heavy Metal Basin Repair Electrical Demolition Drawing

PDF, Low priority1 page · other
Low

Tinker AFB Repair Heavy Metal Basin Electrical Construction Drawing WWYK090204/A

PDF, Low priority1 page · other
Low

Tinker Air Force Base Mechanical Standard 2020 Edition

PDF, Low priority61 pages · other
Low

Wage Determination OK20250049

PDF, Low priority8 pages · other
Low

WWYK040311 Repair Metal Treatment Basin

PDF, Low priority1 page · other
Low

WWYK090204/A Repair Heavy Metal Basin Facility IWTP B62528 Construction Drawing

PDF, Low priority1 page · other
Low

WWYK090204/A Repair Heavy Metal Basin Facility IWTP B62528 Mechanical Construction Drawing

PDF, Low priority1 page · other
Low

WWYK090204 Repair Heavy Metal Basin Facility IWTP B62528 Project Drawing

PDF, Low priority1 page · other
Low

WWYK250031 Repair B62528 Project Drawings 25MAR2025

PDF, Low priority3 pages · other
Low

WWYK 250031 - Tinker AFB General Requirements Specification Submittal Register

XLSX, Low priority2 pages · other
Low

0311E-01.pdf

PDF1 page

0311M-01.pdf

PDF1 page

0311M-02.pdf

PDF

0311M-03.pdf

PDF

0311M-04.pdf

PDF

0311M-05.pdf

PDF

090204M-03+%28002%29.jpg

JPG

250031+Drawing.jpg

JPG

Site+Visit+Sign+in+Oct+21.jpeg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Nov 25, 2025 to Nov 28, 2025. The notice description changed.

Notice updated

Response deadline changed from Nov 28, 2025 to Dec 4, 2025. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Dec 4, 2025 to Dec 10, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA

Full Description

Show more

Update 5: 


Proposal due date has been extended to 10 December 2025 at 1PM



Update 4:


RFI responses are posted.  Proposal due date has been extended to 4 December, 2025 at 1PM.


====================================================================


Update 3:


Uploaded sign in sheet from site visit on 21 October 2025.


====================================================================


Update 2:


Uploaded Solicitation FA8137260001


Proposals due 28 November, 2025 by 2pm.  Early proposal submissions are acceptable.  


***If any other documents are needed for proposals, email POCs***


====================================================================


Update 1:


Only the MAC BOA Holder GCs that attended Site Visit on 21 October 2025 will be able to continue forward toward the award


RFIs due 28 Oct 2025 at 1300.


--------------------------------------------------------------------------------------------------------------------------------------------------------------------


This posting is for Tinker AFB - MAC BOA Holders ONLY.  
Project Solicitation Number:  FA813726R0001
Project Title: WWYK250031 – Repair B62528
Project Location: Tinker AFB - B62528


The government is re-soliciting this requirement after the cancelation notice last month.  If you did not attend the site visit in April, you're invited to attend on 21 October. 


All parties interested in submiting a proposal is required to attend the site visit on 21 Ocotober.  


Various demolition throughout building 62528 on Tinker Air Force Base (AFB), Oklahoma that are compliant with applicable NEC and NFPA standards.


The magnitude of this construction project is between $1,000,000 and $5,000,000.



Project specific documents are attached to this posting.



If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.



This posting is for Tinker AFB - MAC BOA Holders ONLY.  



After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Site Visit.  Your RSVP email must be received by 20 October 2025 at 1:00pm.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must send names of participants with your RSVP so that we can know how many personnel require base access.  After receipt of your RSVP, an MS Outlook meeting invite will be coordinated and will be forwarded stating the date and time of the Initial Site Visit.


You must attend the Site Visit for the project to be considered eligible to propose.



Current date and time for site visit is 21 October 2025, 1:00PM  CT - 1:30 PM CT


Location:  Entrance of Building 62528 at Tinker Air Force Base (AFB), Oklahoma


>>>>>This is an active construction site, you must bring construction PPE to attend initial site visit<<<<<



This posting is for Tinker AFB - MAC BOA Holders ONLY.  


Only the MAC BOA Holder GCs that attended Site Visit on 21 October 2025 will be able to continue forward toward the award


More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

4 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS