Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Titan II Battery Energy Storage System and Imperial Irrigation District R-Line Upgrades Project

Forecast
CUP #22-0003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Titan II, LLC is seeking to modify an existing conditional use permit to install a 40-megawatt battery energy storage system and a corresponding gen-tie line that will connect to the Imperial Irrigation District’s existing 92 kV R-Line. Simultaneously, the project includes comprehensive upgrades to a 34-mile segment of the R-Line between the Dixieland and Anza substations, involving the replacement of aging wooden transmission poles with steel monopoles of similar height to improve system reliability, increase capacity, and mitigate vulnerabilities from severe weather. The majority of the upgrades will occur within the current right-of-way, but expansion will be necessary in select areas where the existing corridor is too narrow, requiring coordination with the Bureau of Land Management for a right-of-way grant on federally managed lands and temporary construction access. As a federal action, the transmission line upgrades are subject to environmental review under the National Environmental Policy Act, necessitating submission of a Standard Form 299 and a Plan of Development to BLM. The project comprises two interdependent components: the conditional use permit modification for the battery storage system and the broader infrastructure improvements to the R-Line, both aimed at enhancing grid resilience and supporting future energy needs in Imperial County.

General Info

Titan II, LLC to upgrade 34-mile R-Line with steel poles and add 40MW battery storage, requiring federal environmental review.

Agency

California → Imperial County

Place of Performance

Various; see Attachment A, CA, 92004

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Imperial County
Office AddressN/A
Contacts
Sharyn HidalgoProject Manager
Jurg HeubergerProject Manager

Interested Companies (1)

HDRDenver, Colorado

Full Description

Show more
The project applicant, Titan II, LLC, is currently requesting to modify a previously- approved conditional use permit (CUP) (CUP #17-0006) to add a 40 megawatt battery energy storage system (BESS) and gen-tie line to interconnect with the existing Imperial Irrigation District’s (IID) R-Line on APN 018-170-067 (CUP #22-0003). The proposed project would also include replacing and upgrading equipment along an approximately 34-mile segment of the existing IID 92 kV R-Line, between the Dixieland Substation and Anza Substation. The R-Line upgrades are planned in order to address long-term integrity of the system as well as capacity and maintenance issues associated with the existing R-Line, which among others, is susceptible to further deterioration and damage from high wind events and/or storms. Generally, the R-Line upgrades would involve replacing existing wooden transmission poles that are approximately 50 to 80 feet in height with steel monopoles. The new steel pole structures would be of similar height, ranging from approximately 50 to 80 feet. The transmission line route traverses private land as well as federal land under the jurisdiction of Bureau of Land Management (BLM). The majority of the proposed transmission line upgrades would be located within the existing transmission line alignment and right-of-way (ROW); however, in a few areas, the existing ROW is very limited/narrow and will need to be expanded to accommodate the improvements. Accordingly, the project applicant is seeking an ROW grant from BLM to authorize expansion of the existing ROW on BLM-managed lands, as well as temporary access required to support construction activities. In order to process the requested authorization, the project applicant would be required to submit a Standard Form 299 (SF 299) Application and an associated Plan of Development to BLM. Review and approval of the ROW application constitutes a federal action; therefore, the proposed R -Line upgrades would be subject to environmental review in accordance with the National Environmental Policy Act and applicable BLM implementing regulations and guidance. The proposed project consists of the following components: 1) Modification to CUP #17-0006 to add the BESS and gen-tie line to interconnect with the R-Line (CUP #22-0003), and 2) Upgrades to the IID’s R-Line.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and coordinating professional engineering and laboratory services for geotechnical design and roadway materials testing. Construction will be subject to rigorous material characterization tests, including California Bearing Ratio and Plate Load tests, with operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 1 hour ago

DEADLINE

in 3 months
View Details
NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Dalton Utilities

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
Federal
Y1AZ--504-21-703 Training and Admin Support Space Construction
Solicitation # 36C25727B0001
The Amarillo VA Medical Center requires the construction of infrastructure and concrete pad space to support mobile EHRM training and administrative facilities at the Amarillo VA Health Care System in Amarillo, Texas. The scope of work includes providing electrical power, domestic water, sanitary sewer, and telecommunications fiber to three utility pad locations, constructing concrete pads according to specifications, and restoring any landscaping, roads, or sidewalks disturbed during construction. This project, identified as Project No. 504-21-703, is anticipated to be awarded as a Firm-Fixed Price Construction contract via an Invitation for Bid (IFB) in accordance with FAR Parts 14 and 36. The estimated contract value ranges between $0 and $1,000,000, with a period of performance of 183 calendar days following the issuance of the Notice to Proceed. This procurement is a set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 237130, which has a small business size standard of $45.0 million. To be considered responsive, offerors must be certified as an SDVOSB by the U.S. Small Business Administration (SBA) and be listed in the SBA’s Small Business Search (SBS) database prior to submission, adhering to 13 CFR Part 128 and VAAR 819.70. The tentative solicitation period is set for November 30 to December 30, 2026, with a tentative award date of January 20, 2027. Primary points of contact include Contracting Officer Makarim Abdul-Jabbar and Contracting Officer’s Representative Logan Dunn.
257-NETWORK Contract Office 17 (36C257)

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information
Solicitation # MHMV200009-MHMV120009-MHMV08002
The U.S. Air Force 377th Contracting Division is seeking market intelligence via a Request for Information (RFI) for the demolition and construction of electrical substations at Kirtland Air Force Base, New Mexico. The project involves three primary efforts: the repair of Substation 9 and its feeders, the removal of Substation 23 with load connection to Substation 24A Feeder 5, and the demolition of Substation 3 to facilitate the rebuild of a modern 10,000 KVA consolidated Substation 10. The goal is to modernize the base electrical infrastructure with 12.47 kV distribution systems, eliminate single points of failure, and ensure regulatory compliance. The government is evaluating the feasibility of using a Progressive Design-Build (PDB) delivery method under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. 2808a. The scope of work requires a phased design approach, moving from conceptual design to a final 100% stamped construction document set, with a target completion date of May 2027 or sooner. Technical requirements include compliance with IBC, UFC 3-501-01, NFPA 70, and IEEE C2 standards, as well as strict adherence to Department of Defense cybersecurity protocols for electric meters. Contractors must provide a Critical Path Method schedule and engage an independent testing organization for system calibration. Key administrative requirements include the provision of performance bonds, adherence to Davis-Bacon wage rates, and strict environmental controls regarding hazardous materials and ozone-depleting compounds. Interested firms are requested to provide company profiles, relevant experience, and feedback on the proposed PDB-OTA acquisition strategy.
FA9401 377 Msg Pk

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
Solicitation W91QVN27QA007 is a Firm Fixed Price request for quotations to provide non-personnel maintenance and repair services for 21 C4I Communication Tower sites and related facilities supporting the 41st Signal Battalion in South Korea. The scope of work includes structural integrity assessments, physical inspections for rust and damage, bonding and grounding tests, lighting protection maintenance, LED beacon and side marker light replacement, tower painting, and lead abatement. Specific facility repairs are limited to the interior and exterior of the Osan Bucket C4I Communication Shelter. The period of performance is a 12-month base period running from January 1, 2027, to December 31, 2027, across five primary locations: CP Walker, Highpoint, Osan Bucket, Yongsan, and Papyongsan. Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price technically acceptable offer. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and proof of mandatory ROK business licenses, specifically Information and Communication and Electrical Construction licenses. Key personnel requirements include a Contract Manager, a CQCSM/Safety Manager with an associate degree and five years of relevant experience, and a Lead Technical Engineer. All quotes must be submitted in Korean Won via PIEE by November 18, 2026, and must include both a detailed price breakdown and a completed SF 1449 pricing schedule. Performance will be monitored via a Quality Assurance Surveillance Plan and a Performance Requirements Summary to ensure compliance with NETCOM and Army regulations.
0411 Aq Hq Contract Augmented

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
SLED
80627Y0173-Neighborhood Internet Installation at HPD Bronx Family Living Center
Solicitation # 80627Y0173
The New York City Department of Housing Preservation and Development is soliciting proposals for the Neighborhood Internet pilot project at the Bronx Family Living Center. The project involves installing a hybrid fiber/fixed wireless internet network, which includes retrofitting two neighboring buildings for hotel-style Wi-Fi service and installing rooftop antennas to establish one building as a wireless hub. The selected vendor must provide 1GB+ fiber backhaul service and ongoing network maintenance for a three-year term. Technical requirements specify that the network must be certified for Wi-Fi 6 (802.11ax) or newer and comply with Citywide Privacy Protection Policies and Protocols. This is a M/WBE Noncompetitive Small Purchase, meaning only New York City-Certified M/WBE firms are eligible to apply. The contract is estimated to be valued at or above $200,000, making Local Law 63 applicable. Proposals are evaluated primarily on experience, qualifications, and capacity (75% weight), specifically regarding residential wireless and hybrid fiber/wireless deployments. Subcontracting is limited to 40% of the total contract amount, with non-M/WBE subcontractors capped at 20%, though fiber backhaul providers are exempt from this limit. All submissions, including cost proposals and required affirmations regarding the Iran Divestment Act, Macbride Principles, and tax status, must be completed through the PASSPort system.
Department Of Housing Preservation And Development

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the Underground Utility District 38 Overhead-to-Underground Service Conversions project (CS 09-26-07). The primary objective is to safely convert 195 residential electrical services from overhead to underground routing without increasing customer capacity or modernizing existing customer-owned equipment, which will be reused if deemed safe by the City Building Division. The scope includes the installation of approximately 8,389 linear feet of aluminum service conductors across standard and 3-inch lateral locations. The project is expected to start around March 1, 2027, and must be completed within 365 calendar days of the Notice to Proceed. Eligible bidders must possess a valid California C-10 Electrical Contractor license and be registered with the Department of Industrial Relations. A mandatory virtual pre-bid meeting was held on November 5, 2026, and all bids must be submitted via the OpenGov Bid Portal by November 25, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on capacity, experience, and past performance. Required submissions include a 10% bid security, a subcontractor list, and a bid schedule. Once awarded, the contractor must provide performance and payment bonds for 100% of the contract price and adhere to the City of Alameda Project Stabilization Agreement to ensure labor harmony and prevailing wage compliance.
Engineering and Operations

POSTED

1 day ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS