Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TOS No. 95 - MacArthur Lake Stormwater Capture Project

Awarded
216563State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The City of Los Angeles's Bureau of Engineering, in partnership with LA Sanitation & Environment, is seeking a qualified consultant to provide comprehensive design services for the MacArthur Lake Stormwater Capture Project. The scope includes initial design, assistance during the bid and award process, and ongoing support during construction to ensure the project's successful implementation. The contract, designated as TOS No. 95, is specifically limited to Carollo Engineers from the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List, with any added subconsultants needing registration with RAMP if not originally listed in Schedule A. The project has a contract value estimated between 5 million and 15 million dollars and is set within California, with a response deadline of September 30, 2024. Interested parties can find further details and submit responses through the provided link, with Brandon Kawaguchi serving as the primary contact for inquiries.

General Info

Documents

19

Attachment A - MacArthur Lake Stormwater Capture Project 90% Plans 7.26.24

PDF, High priority: read this firstspecifications
High

Attachment B - MacArthur Lake Stormwater Capture Project 90% Specifications July 2024

PDF, High priority: read this firstspecifications
High

Attachment F - Measure W Sign Design Guidelines

PDF, High priority: read this firstspecifications
High

Attachment Q - Community Outreach and Engagement Program (COEP) Outline

PDF, High priority: read this firstsow
High

City of Los Angeles Residential Parkway Landscaping Guidelines June 2015

PDF, High priority: read this firstguidelines
High

MacArthur Lake Stormwater Capture Project Basis of Design Report

PDF, High priority: read this firstbasis-of-design-report
High

MacArthur Lake Storm Water Capture Project - Class A Estimate

PDF, High priority: read this firstcost-estimate
High

Schedule B Task Work Order List of Subconsultants

XLS, High priority: read this first1 page · schedule-b
High

Schedule B - Task Work Order List of Subconsultants for TOS SN53

PDF, High priority: read this firstschedule-b
High

Storm Drain Design Plan Submittal Checklist

PDF, High priority: read this firstsow
High

TOS 95 - MacArthur Lake Stormwater Capture Project

PDF, High priority: read this firstrfp
High

Transfer Agreement for MacArthur Lake Rehabilitation Project

PDF, High priority: read this firstcontract-document
High

Transfer Agreement - LACFD SCW Municipal Program 2020MP47

PDF, High priority: read this firstcontract-document
High

Attachment L - Non-Collusion Affidavit

PDF, Low priorityother
Low

Attachment O - SCWP CA Code of Ordinances Chapter 16

PDF, Low priorityordinance
Low

MacArthur Park Stormwater Capture Project COEP Plan Draft

PDF, Low prioritycommunity-outreach-plan
Low

Ordinance No. 177404 - RAP Tree Protection and Replacement Policy

PDF, Low priorityordinance
Low

Safe, Clean Water Program Implementation Ordinance - Chapter 18

PDF, Low priorityordinance
Low

Stormwater Project Design Review and Comment Process Memo

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Public Works, Engineering Bureau
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Brandon Kawaguchi

Full Description

Show more
The City of Los Angeles, Bureau of Engineering (BOE), in conjunction with LA Sanitation & Environment (LASAN) is seeking the services of a consultant to provide design as well as design services during bid and award, and design support services during construction for the MacArthur Lake Stormwater Capture Project. *Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP. **This TOS is only applicable to Carollo Engineers from the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS