Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Town of Fairfax Bridge Preventative Maintenance Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Fairfax is undertaking preventive maintenance repairs on three bridges—Marin Road, Spruce Road, and Canyon Road—as part of the Caltrans Bridge Preventative Maintenance Program, with the goal of preserving structural integrity, correcting deficiencies before costly rehabilitation becomes necessary, and extending the service life of these critical infrastructure assets. Work is strictly limited to the dry season, from April 15 through October 15, to minimize disruption to aquatic habitats, particularly in creek crossings, where temporary dewatering and flow diversion will be employed. All construction activity must adhere to strict environmental safeguards, including compliance with Caltrans Standard Specifications, BAAQMD air quality guidelines, and California Code of Regulations, while prohibiting the use of toxic materials, mandating concrete washout control, and requiring spill prevention measures such as absorbent pads under equipment and禁止refueling near stream banks. The project demands full coordination with state and federal regulatory agencies, including obtaining permits from the U.S. Army Corps of Engineers, California Department of Fish and Wildlife, and the Regional Water Quality Control Board, along with consultations under the Endangered Species Act and AB 52 tribal cultural resource protections. Contract execution is overseen by the Town of Fairfax, with Kristin Arnold, Public Works Director, serving as the primary point of contact. Performance is site-specific, occurring only at the three approved bridge locations in Fairfax, California, with no formal delivery points or shipping logistics involved. The scope includes structural repairs, traffic control planning, noise mitigation using Caltrans-compliant mufflers, and restricted work hours that exclude Sundays and federal holidays. Post-construction obligations mandate stream channel restoration using certified weed-free straw and jute matting, erosion control inspections after key rain events, and compliance with ongoing environmental monitoring. While no formal contract value, pricing structure, or federal acquisition regulations are detailed, the project operates under state and local environmental review frameworks under CEQA and incorporates specific socioeconomic requirements, including participation from a certified small and women-owned business, Kelly Biological Consulting. No federal contract clauses, packaging directives, invoicing systems, or technical evaluation criteria for award are applicable, making this a locally administered infrastructure maintenance initiative driven by environmental compliance and regional infrastructure needs.

General Info

Town of Fairfax performs dry-season bridge maintenance on three sites with strict environmental and regulatory compliance.

Agency

California → City of Fairfax

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Marin Road, Spruce Road, Canyon Road, Fairfax, CA, 94930

Set-Aside

NONE

Documents

(5)

Notice of Determination - Fairfax Bridge Preventative Maintenance Program

PDFnotice-of-determination

Draft Initial Study/Mitigated Negative Declaration for Fairfax Bridge Preventive Maintenance Program

PDFinitial-study-mnd

Summary Form for Bridge Preventative Maintenance Program Document Submittal

PDFenvironmental-summary

Town of Fairfax Bridge Preventative Maintenance Program Notice of Completion

PDFnotice-of-completion

Town of Fairfax Bridge Preventative Maintenance Program NOI

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fairfax
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fairfax
Office AddressN/A
Contacts
Kristin ArnoldPublic Works Director

Interested Companies (1)

Show more
WRA
San Rafael, CA

Full Description

Show more
The proposed project consists of three existing bridges proposed to undergo preventive maintenance repairs through Caltrans’ Bridge Preventative Maintenance Program (BPMP). Two of the bridges, on Marin Road and Spruce Road, are within a few blocks of each other, while the third creek crossing, Canyon Road Bridge, is approximately 2.35 miles southwest of the other two. The purpose of the BPMP is to maintain the existing inventory of bridges in good or fair condition, correct structural deficiencies in a bridge's life before requiring costly rehabilitation, and extend the service life of existing bridges. Various improvements and levels of repair are needed for each of the three bridges. Construction work in the creek would be completed during the dry season when the local creek segments are at their lowest flow rates, and the work areas would be dewatered by temporarily diverting potential flows.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details