This Solicitation opportunity from Massachusetts was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Town of Norton Well 4 Replacement Project entails the complete furnishing and installation of a new well pump system, including a pitless adaptor and submersible well pump, along with all necessary associated piping, a well meter, electrical work, instrumentation and control coordination, site preparation, and appurtenances required for full operational integration. The project is managed by the Massachusetts Department of Water through agency code 60ETN and is designated under NAICS code 237110 for water and wastewater system construction. All work must be performed at the designated location in Norton, Massachusetts, with a zip code of 02766, ensuring compliance with local and state standards for potable water infrastructure.
The solicitation was posted on August 4, 2026, and all proposals must be submitted by August 18, 2026, with Frank Fournier serving as the primary point of contact for inquiries and coordination. The project is classified under state, local, and education (SLED) procurement with no specific set-aside designation, making it open to qualified contractors regardless of business size or ownership status. Bidders are expected to deliver a turnkey solution that meets all technical, safety, and regulatory requirements, with performance bound to the specified location and timeline outlined in the official solicitation document available via the provided UI link.
General Info
Norton, MA well pump system installation via BD-27-1308-60ETN-60ETN-132014, deadline August 18, 2026, Frank Fournier contact.
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope of work includes the furnishing and installation of a new well pump system, pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, well meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for 08/18/2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope includes furnishing and installing a new well pump system, pitless adaptor, submersible pump, piping, meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope includes furnishing and installing a new well pump system, pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope includes furnishing and installing a new well pump system, pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope includes furnishing and installing a new well pump system, pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope includes furnishing and installing a new well pump system, pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation issued by the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope of work includes the furnishing and installation of a new well pump system, pitless adaptor, submersible well pump, piping, well meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for 08/18/2026.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new drinking water supply well pump system, including a pitless adaptor, submersible pump, piping, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, well meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for 08/18/2026.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, well meter, electrical work, I&C coordination, and site work. Bid opening date is August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new drinking water supply well pump system, including a pitless adaptor, submersible pump, piping, metering, electrical work, and site restoration. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope of work includes the furnishing and installation of a new well pump system, pitless adaptor, submersible pump, piping, metering, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, meter, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, well meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for 08/18/2026.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton (Water Department) for the Well 4 Replacement Project. The scope includes furnishing and installing a new well pump system, pitless adaptor, submersible pump, piping, meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work includes the furnishing and installation of a new well pump system, including a pitless adaptor, submersible well pump, piping, well meter, electrical work, I&C coordination, and site work. Bid opening is scheduled for August 18, 2026.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for BD-27-1308-60ETN-60ETN-132014: Town of Norton Well 4 Replacement Project: Bid solicitation from the Town of Norton for the Well 4 Replacement Project. The scope of work involves furnishing and installing a new well pump system, including a pitless adaptor, submersible pump, piping, meter, electrical work, and site work. Bid opening is scheduled for August 18, 2026.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The scope of work includes furnishing and installing a new well pump system, complete, consisting of a pitless adaptor and submersible well pump, associated piping, well meter, electrical work, I&C coordination, site work and appurtenances.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award