Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Town of Pomfret - Construction Contractors for State Project 111-126

Closed
39306State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
Replacement of Bridge No. 104005, Grassy Hill Road over Unnamed Brook, Town of Old Lyme, CT
Solicitation # 1090-0007
The project involves the replacement of Bridge No. 104005 on Grassy Hill Road over an unnamed brook in Old Lyme, Connecticut. The primary scope of work consists of replacing a twin pipe barrel culvert with a precast concrete box culvert, including the installation of SCH B0 PVC pipe and the provision of granular fill as directed by the engineer. The project is governed by EJCDC C-700 Standard General Conditions and requires adherence to ASTM D1785 for piping, 2010 ADA Standards for accessible design for railings, and OSHA requirements for temporary excavation and de-watering systems. The contract is being solicited by the Town of Old Lyme through Nathan L. Jacobson & Associates, Inc., with a submission deadline of December 2, 2026. Bids must be submitted on a lump sum and unit price basis via an electronic bidding service. The award will be granted to the responsible bidder submitting the lowest responsive bid, with a state-funding estimate of $857,525. Key requirements include a Small Business Enterprise goal of 29.39%, compliance with Connecticut prevailing wage laws, and the submission of a bid bond, a non-collusion affidavit, and a statement of bidder's qualifications. Substantial completion is required within 120 days of the commencement date, with final payment readiness expected within 150 days. There is no set-aside status for this solicitation.
Nathan L. Jacobson & Associates, Inc.

POSTED

about 4 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Town of Pomfret is soliciting sealed bids from qualified construction contractors for State Project No. 111-126, the Air Line Trail Reconstruction and Accessibility Improvements. This project, funded by the Transportation Alternatives Program via the Connecticut Department of Transportation under Federal Aid Project No. PEDS(305), involves constructing a stone dust surface segment of the Air Line Trail from Route 44/169 in Pomfret to the Quinebaug River in Putnam. The scope of work includes tree removal, grading, drainage improvements, fencing, minor landscaping, the installation of access ramps and retaining walls, a staircase connecting to the Quinebaug River Trail, and the restoration of all disturbed areas. Construction is expected to begin in the winter of 2026/2027 with an estimated duration of 360 calendar days. The contract will be awarded to the lowest responsive and responsible bidder who demonstrates proper licensing, adequate staffing and equipment, and the necessary experience to complete the work. Bidders must comply with all Federal, State, and Municipal laws, including prevailing wage, labor, and nondiscrimination requirements, as well as CTDOT and Federal Highway Administration guidelines. While the Disadvantaged Business Enterprise participation goal is set at zero percent, bidders must still provide all required DBE documentation, certifications, insurance, and performance and payment bonds. A mandatory pre-bid meeting is scheduled for October 21, 2026, at 10:00 AM. Sealed bids, consisting of one hard copy and one electronic copy on a flash drive, must be submitted to First Selectman Maureen Nicholson by November 5, 2026, at 11:00 AM.

General Info

Bids sought for Air Line Trail reconstruction and accessibility improvements in Pomfret.

Documents

1
PDF, High priority: read this first2 pages · itb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Asphalt and Concrete RestorationOpen now, due in 21 days
  • Concrete, Asphalt, and PavingOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA

Full Description

Show more
The Town of Pomfret is seeking sealed bids from qualified construction contractors to provide construction services for State Project No, 111-126, Air Line Trail Reconstruction and Accessibility Improvements. The project is funded through the Transportation Alternatives Program administered by the CT DOT, Federal Aid Project No. PEDS(305). Improvements include construction of a stone dust surface segment of the Air Line Trail from Route 44/169 in Pomfret to the Quinebaug River in Putnam. The project also includes tree removal, drainage improvements, grading, fencing, minor landscaping, access ramp/retaining walls, a staircase connecting to the Quinebaug River Trail, and restoration of disturbed areas. Mandatory pre-bid meeting on October 21, 2026 at 10:00 AM. See Legal Notice for details.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 523991
New
SLED
Request for Proposals (RFP) OPEB and Investment Administration
Solicitation # 2026-7
The Housing Authority of the City of Middletown (MHA) is soliciting proposals for investment and OPEB trust administration services for an initial three-year period. The scope of work includes financial management and reporting, investment oversight as an advisor and custodian, benefit administration for OPEB-related disbursements, cash management, and governance support for the MHA Board of Commissioners or Trustees. The selected firm must adhere to governmental accounting standards and investment restrictions approved by State law and HUD, specifically HUD PIH Notice 1996-33. A critical requirement is the execution of the HUD-required General Depository Agreement without modification, which mandates 100% collateralization of all deposits exceeding the FDIC-insured amount. Awards will be based on the most advantageous offer, evaluated through a point system consisting of background and experience (45 points), technical response (30 points), and fee competitiveness (25 points). MHA prefers a single award but reserves the right to make multiple awards. Proposals must be submitted via email by December 23, 2026, and must include client references, an organizational chart with staff resumes, a detailed technical response to the scope of services, and a comprehensive fee proposal. The contract is expected to become effective around January 4, 2026. There is no specified set-aside status for this solicitation.
Trust, Fiduciary, and Custody Activities

POSTED

about 5 hours ago

DEADLINE

in 30 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS