TR27013-Manhole Reconstruction Citywide(JOC)

Open
TR27013State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Contract TR27013 is a Job Order Contract for citywide manhole reconstruction managed by the City of Baltimore Department of Transportation. The project focuses on the construction of cast-in-place conduit manholes, with a primary deliverable of 85 cubic yards. The estimated cost classification range for this project is between $2,000,000.01 and $3,000,000.00. To be eligible to bid, contractors must be prequalified by the City of Baltimore Office of Boards and Commissions under category B02553 for duct line construction. Subcontractors performing work exceeding $50,000.00 must also meet these prequalification standards. A mandatory pre-bidding information session is scheduled for November 10, 2026, at 10:30 AM at 2025 Inverness Avenue, 2nd Floor; attendance is required to bid. Interested parties must email their contact details to Chris Hubbard by November 9, 2026, to receive a meeting invite. Sealed bids must be submitted to the Office of the Comptroller in City Hall by November 18, 2026, at 11:00 AM. The contract mandates a 30% Minority Business Enterprise (MBE) goal and a 15% Women's Business Enterprise (WBE) goal. For bids exceeding $100,000.00, a bid bond or certified check of at least 2% of the total bid is required. Notably, the Baltimore Apprenticeship Trainee Program requirement is excluded from this contract.

General Info

City of Baltimore contract for citywide manhole reconstruction costing $2M to $3M.

Agency

Maryland

Place of Performance

MD, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaryland
Contacts1 person available
OfficeMD, USA
Organization / Agency
Maryland
Office AddressMD, USA
Contacts
Shahana DAGHAProcurement Officer / Buyer

Full Description

Show more
The Prequalification Category required for bidding on this project is, B02553 (DUCT LINE CONSTRUCTION). The Cost Classification Range for this project will be from $2,000,000.01 to $3,000,000.00.Principle Items of work for this project are: CAST IN PLACE CONDUIT MANHOLE 85 CYThe MBE goal is 30% The WBE goal is 15%
Additional Instructions: A MANDATORY "Pre-Bidding Information" session will be conducted at 2025 INVERNESS AVENUE, 2ND FLOOR at 10:30am on NOVEMBER 10, 2026 hosted by the Department of Transportation. YOU MUST ATTEND THE MANDATORY PRE-BID MEETING IN ORDER TO BID ON THIS CONTRACT AS A PREQUALIFIED CONTRACTOR. Roll call will be taken at the beginning of the pre-bid meeting. By no later 3pm on NOVEMBER 9, 2026 email your contact information to include your name, company name, phone number and email address to contact@example.gov to receive an invite to the meeting.
Procurement Goals: MBE: 30.00, womenOwnedMBE: 15.0

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a performance bond, a payment bond, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with North Carolina Administrative Code regarding Minority and Women-Owned Business requirements is mandatory, requiring the submission of a Good Faith Efforts Form and Table A. Project administration is managed by Willis Engineers on behalf of the City of Belmont, with payments processed via Applications for Payment due 30 days after presentation to the owner. Work must adhere to various industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. The project must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is actively seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including bidder qualifications, past project experience, and management plans. Key contractual terms include a 5% retainage on progress payments and liquidated damages of $1,000 per calendar day. Compliance with the Davis-Bacon Act, American Iron and Steel requirements, and OSHA standards is mandatory. The successful bidder must provide performance and payment bonds equal to 100% of the contract amount and file required insurance within 15 days of the award.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, asphalt paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax to Veronica Garcia by the deadline of December 3, 2026, and must remain valid for 120 days. All participating subcontractors are required to maintain valid California contractor licenses and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS