Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Cargo Building 626.1 - TP 0018 - Fire Protection

Closed
11918.66 -TP-0018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

Clark Construction has been contracted as the design-builder for a significant redevelopment project at San Francisco International Airport, focusing on replacing aging cargo facilities with a new two-story core-and-shell cargo building. The project encompasses a range of features including two floors of cargo warehouse space, multiple truck docks (both existing and future), structural provisions for material handling systems, and leasable office space with accessible amenities. The building's exterior combines insulated metal panels, glass, translucent polycarbonate, and durable concrete bases, with two elevators serving the facility. Prior to occupancy, demolition of an existing building and relocation of infrastructure such as vaults and equipment will be undertaken. This cargo building is part of the larger West Field Area redevelopment, which aims to establish a consolidated office and cargo district that includes additional cargo buildings, parking structures, office spaces, and a new hotel, contributing to an overall strategic plan to modernize and expand airport infrastructure. The contract includes a specific trade package for fire protection systems (TP-0018), with a bid deadline set for September 3, 2025. The scope involves installing comprehensive fire protection systems across the new cargo building. The project is classified under NAICS code 238910, indicating specialized electrical and plumbing work related to fire safety. The procurement process emphasizes a 20% participation requirement for local small, disadvantaged, or emerging businesses. Interested bidders can access detailed information and submit their proposals through the provided online portal. The overall project budget ranges from five to fifteen million dollars, with the primary point of contact for contract inquiries being Tiffany Gonzalez-Ruiz at SFO Construction.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → SFO Construction
Office AddressN/A
Contacts

Full Description

Show more
Design-Builder Firm Name: Clark ConstructionProject Overview:The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed.The 626 Cargo Building is part of the larger West Field Area which includes multiple cargo buildings, parking garages, additional office space and a new hotel. The West Field is collectively being re-planned to establish a new consolidated office campus and cargo district at SFO. Trade Package No.: TP-0018Trade Package Title: Fire ProtectionDescription of the Trade Package Scope of Work: Scope of work includes installation of fire protection systems.Trade Package Bid Due Date and Time: 09/03/2025 at 2:00 pmMain Trades of the Trade Package: Fire ProtectionCMD LBE Participation Requirement: 20%Best contact for Trade Package information (Name and Email): Nicolas Luciani Hurtado, contact@example.gov web link to the Trade Package or more information: https://app.buildingconnected.com/public/5579ca47675b720a008b2c5a

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS