Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - SFO Recycled Water System Project - TP 4004 -Structural Steel, Canopy, Misc. Metals

Closed
11431.66 - TP4004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Capital Projects - Construction

POSTED

about 16 hours ago

DEADLINE

in 13 days
NAICS: 238120
New
SLED
EVA DELL BARRIER ACCESS GATES
Solicitation # MS27-052
The City of Victorville is soliciting competitive bids under solicitation MS27-052 for the fabrication and installation of four steel barrier access gates at Eva Dell Park. The project requires a licensed C-13 contractor to provide all labor and materials to install one 31-foot gate, one 35-foot gate, and two 37-foot gates, all constructed from Schedule 40 steel pipe. The contract will be awarded to the lowest responsible bidder who attends the mandatory pre-bid meeting and site walk held on November 10, 2026. Final responses are due by December 3, 2026. As a project funded by the Community Development Block Grant (CDBG) program, strict compliance with the Davis-Bacon Act and California state prevailing wage laws is required, with the higher of the two rates applying. Contractors must submit weekly certified payroll reports using Form WH-347 and adhere to Build America, Buy America (BABA) provisions and California Air Resources Board regulations. Additionally, the successful bidder must divert at least 65 percent of non-hazardous construction and demolition debris from landfills. Financial security requirements include a bid guarantee of at least 10 percent of the total proposal amount, with the winning contractor required to provide Faithful Performance and Payment Bonds for 100 percent of the contract price. The contractor must also provide a guaranty bond covering defective materials or workmanship for twelve months following City acceptance. Compliance with the Americans with Disabilities Act (ADA) and various federal and state non-discrimination and affirmative action policies is mandatory.
City of Victorville

POSTED

about 21 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves Walsh Construction Co. II, LLC serving as the design-builder for the Recycled Water Systems Project at San Francisco International Airport. The project aims to design and construct an Advanced Water Treatment Plant (AWTP) to meet regulatory standards for recycled water and PFAS removal, along with upgrades to existing treatment facilities, including the addition of a new 250,000-gallon storage tank, pump station, and approximately three miles of pipeline connecting to airport facilities. The work also encompasses upgrades to three existing Sequence Batch Reactors (SBR) and the construction of a new SBR to ensure permit compliance. This is a progressive design-build effort, with trade work authorized incrementally, and the project will be completed through design, permitting, activation, commissioning, and closeout phases within the Mel Leong Treatment Plant, which handles wastewater from airport operations. The specific trade package, TP-4004, focuses on structural steel, canopies, and miscellaneous metals, with a bid deadline of August 18, 2025. The scope includes providing all labor, materials, and supervision necessary for fabrication and installation of structural steel components such as beams, columns, girders, steel decking, and associated supports for multiple structures, including buildings and canopies. The subcontractor is responsible for transportation, handling, galvanization, field welding, and inspection coordination, ensuring compliance with technical specifications and safety standards. Only pre-qualified bidders are eligible to submit proposals, with a participation goal of 1.7%, and interested parties can contact the designated project representative for further details and bid documents. The contract size is estimated between 50 and 100 million dollars, with the project located in California.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → SFO Construction
Office AddressN/A
Contacts

Full Description

Show more
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No.: TP-4004Trade Package Title: Structural Steel, Canopy-AC, Misc. MetalsDescription of the Trade Package Scope of Work:Subcontractor shall provide all labor, materials, equipment, and supervision necessary to complete this scope of work in accordance with the construction drawings and technical specifications. Structural steel, canopies and miscellaneous metals are applicable to the following structures: Electrical & Control Building (912), Process Building (914), Blower Building, Sequencing Batch Reactor #4, and Combined Effluent Pump Station.Structural steel includes, but not limited to, roof I beams, steel decking, metal framing, external pipe support frame (west side of Process Building), frame for the air compressor canopy, and roof HVAC unit bracing.Canopies framing includes awnings above entrance doors, connection between Process and Control & Electrical Building, and wrap-around canopy for Blower Building.Miscellaneous metals include but not limited to, furnish and install of CAL OSHA compliant ladders, landings, covers for roof access, metal grating for trenches including rebate embeds, metal stairs, railing, and stair nosing.Blower Building structure design is at 50% at time of bid. Bidder shall assume W16x31 roof trusses in drawing S2.61.03; metal deck, support angles, canopy framing, and all other details are assumed to match those of the Process and Control buildings. There are specific bid assumptions at the Blower Building stated within the scope part of this document. When Final Design results in a material difference from bid drawings and bid assumptions, the change(s) will be address via a future Change Order(s).When final design becomes available for Blower Building, the selected subcontractor may pursue a Reconciliation Change Order based on changes between the final drawings and the assumptions used for bid.BASE SCOPETransportation and Handling• Subcontractor is responsible for the delivery, storage and handling of structural steel material free from mill scale, rust and pitting.• Subcontractor is responsible for the intactness of the coating until steel is erected. Repair if damaged.Fabrication and Installation•Structural Steel and Components:▪Bidder shall include galvanization as specified for structural steel materials. For portions that are intentionally left ungalvanized for welding purposes, shall be field galvanized as approved by the Engineer. Galvanization repair is included in subcontractor scope.▪Subcontractor shall provide all embeds and anchor bolts necessary to install structural steel systems including canopy bracing. Installation shall include HSS posts, welded and bolted beam connections, and metal deck for the roof system. Furnish steel finishes appropriate for water treatment plant environment.▪Furnish and install structural steel beams.▪Furnish and install structural steel columns.▪Furnish and install structural steel girders. Bidder includes fabrication and installation of base plates and anchors of girder-CMU connections per detail 4/S8.12.▪At the Blower Building, bidder shall assume W16x31 roof trusses in drawing S2.61.03▪Furnish and install steel connections and bolts.▪Furnish and install gusset screws and plates.▪Touch-up galvanizing onsite after lifting-aids are removed if necessary.▪Furnish and install metal track blocking.▪Furnish and install headed-embeds over intermediate CMU wall per detail 9/S8.12.▪Furnish and install HSS behind storefront connecting to the CMU wall. Coordinate with masons.▪Furnish and install all embeds and anchor bolts for structural steel systems.▪Furnish connection bolts and anchor bolts.▪Furnish and install Adhesive Bonding Reinforcing Bars and All Thread Rods in Masonry reference specification section 04 05 18▪For Mechanical Anchoring and Fastening to Concrete and Masonry reference specification section 05 05 24•Steel Decking:▪Furnish and install steel decking.•Subcontractor to cut penetration openings in steel decking.•Furnish and install roof deck support angles for penetrations that can be reasonably inferred from other discipline drawings•Lap welding for all decks▪Install penetrations in B decking▪Furnish and install structural steel members for roof and decking system. Include ledger angles.▪Furnish and install steel deck, including cutting, shaping, fitting, drilling, welding, ridge plates, valley plates, reinforcing plates for openings, and miscellaneous pieces necessary for proper installation. Refer to 2/S2.40.05 and 2/S2.40.06 for deck types of Building 912 and 914.▪All steel decking shall receive a protective zinc coating. Refer to drawings and specifications for requirements. Any damaged coating shall be repaired in the field per approved procedure, at no additional cost to the General Contractor and SFO.•Structural HVAC roof curb:▪Furnish and install supporting steel members for HVAC roof top unit curbs.•Stairs and Railing:▪Furnish and install all aluminum stairs and stair nosing’s per specification 05.50.00.▪Furnish and install all grating for stair treads.▪Furnish and install railings per specification 05 52 13-2.01B2- Pipe and Tub Railings.•For AWTP see detail 7/C8.60.02 on the project, including post pockets. Railings must be provided with engineered shop drawings. See drawing A4.01.•For SBR and Sludge Buffer Tanks, assume future safety railings over the structure. Assume a total of 1090 LF of railing on both sides of the walkway. Assume base plate and surface mount anchor.•For Blower Building see page A4.61.01 for railing. See detail 7/C8.60.02.•Stand Alone Canopy:▪Furnish and install canopy including all columns, beams, steel decking, anchor bolts, and cross bracing▪Subcontractor responsible for field verification of anchor bolts layout. Installation of anchor bolts by others.•Building Entrance Door Canopies:▪Furnish and install all headed stud connections per specifications and drawings.▪Furnish and install canopy and awnings above doors and entrances.▪Furnish and install supporting steel angles for canopies.▪Furnish and install HSS supporting member for canopy.▪Furnish and weld the canopy I beam to base plates on the exterior of CMU wall. Refer to Detail 3/ S8.13.▪At the Blower Building, bidder shall include canopy and awnings shown in profile view on drawing A7.61.01 in design package 7 drawings, and on plan view on drawing S2.61.03.▪At the Blower Building, bidder shall assume diagonal kickers connecting to the CMU will be the same as HSS connections, in drawing A8.61.04 Detail 3. Connections between canopy and CMU building will match those of the Process and Control buildings. See details 2/S8.13 and 3/S8.13 based on canopy width.•Miscellaneous Metals:▪Furnish and install all miscellaneous galvanized steel per specifications and drawings▪Furnish and install metal grating▪Furnish and install preformed channel pipe supports.▪Furnish all embedded angle, frames and accessories for metal grating, and hatches.▪Furnish and install galvanized pipe support framing structure on the west side of the processes building for pipe coming out of pipe trench. See drawing S3.40.07▪Furnish and install all exterior roof access ladders and guards with coating as indicated in the specifications.▪Furnish and install hose racks in locations shown on the drawings.▪Furnish and Install Cast iron stop plank grooves and trench drains.▪Furnish and install steel plate rated for 1 hour roof wall.▪Furnish galvanized A53 Grade B steel bollards▪Subcontract is responsible for all F1554 threaded rods and wedge anchors post install including epoxy, for ledger angles, ladders, canopy kicker, and any other structural metal attached to CMU.▪At the Blower Building, bidder shall include 1EA future exterior roof access ladders that is similar to the Process and Control buildings.QC/Inspections•Perform welding for structural metals in accordance with spec 05 12 00•Coordinate with Walsh for any 3rd party inspections including but not limited to welding, high strength bolt testing,•Provide welding procedure specifications (WPS) in accordance with AWS D1.1, D1.4, and D1.6 for yard fabrication and jobsite field welding. Provide welder qualification certificates.Trade Package Bid Due Date and Time: 8/18/2025Main Trades of the Trade Package: Iron workersSBE Participation Requirement: 1.7%Design-Builder requirements or prequalification criteria: Only pre-qualified bidders will be allowed to submit bids. If you did not previously pre-qualify during the pre-qualification timeframe, you will not be able to bid on this project.Contact for Trade Package information: Dominic C Fung, contact@example.gov web link to the Trade Package or more information: Please contact the email above if you were previously pre-qualified with Walsh and are interested in bidding for this trade package. Walsh will share the bid documents to pre-qualified subcontractors via email and/or BuildingConnected upon request.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS