Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - SFO Recycled Water System Project - TP 4009 -Plumbing AWTF

Closed
11431.66 - TP4009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The City of Dublin, Ohio, is soliciting bids for the SportsOhio PowerPlay Demolition project, located at 6314 Cosgray Road. The scope of work involves the demolition and restoration of the Can-Am/go cart track, batting cages, concrete seating pads, and mini golf course, along with associated hardscapes. Key activities include the removal and disposal of bridges, culverts, foundations, and engineered stream channels, as well as unclassified excavation, site grading for drainage, and the abandonment of private site utilities. The project has an engineer's estimate of 259,606.50 dollars and a final completion deadline of April 30, 2027, with a specific requirement that tree clearing occur between October 1 and March 31. The contract will be awarded based on a lowest and best analysis, evaluating bidders on financial stability, litigation history, and a minimum of five years of experience in relevant activities such as concrete removal and structure demolition. Bidders must submit their proposals electronically via Bid Express and provide a bid guaranty in accordance with the Ohio Revised Code. The project requires the payment of prevailing wages and emphasizes the use of Ohio-based products and labor. Performance must adhere to the City of Dublin and City of Columbus construction specifications, as well as OSHA safety regulations. Payment is structured at 95 percent of approved monthly applications until the work is 50 percent complete, at which point retainage may be reduced at the city's discretion.
City of Dublin, OH - Engineering

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 14 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Recycled Water Systems Project, managed by Walsh Construction Co. II, LLC, involves designing and building an Advanced Water Treatment Plant (AWTP) at the Mel Leong Treatment Plant to meet stringent recycled water standards and remove PFAS contaminants. The project includes constructing a 250,000-gallon storage tank, pump station, and approximately three miles of pipeline to connect various airport facilities. Upgrades to three existing Sequence Batch Reactors (SBRs) and the addition of a new SBR are also part of the scope to ensure compliance with permits. This is a progressive design-build effort, meaning work is authorized incrementally, with the ultimate goal of completing design, construction, permitting, activation, commissioning, and project closeout. The specific trade package, TP-4009, focuses on plumbing work within the AWTP, including installation of below-grade and concrete-encased sanitary drains, potable and recycled water piping, restroom fixtures, and associated infrastructure within the Process and Control Buildings. The scope encompasses mobilization, excavation, backfill, pipe installation, fixture installation, testing, and disinfection, with an emphasis on coordination with other trades and adherence to technical specifications. Bidding is open to pre-qualified subcontractors, with a submission deadline of June 12, 2025. The project aims to be executed within a contract size ranging from $50 million to $150 million, with primary contact through Tiffany Gonzalez-Ruiz at SFO Construction.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → SFO Construction
Office AddressN/A
Contacts

Full Description

Show more
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No: TP-4009Trade Package Title: Plumbing AWTFDescription of the Trade Package Scope of Work:1.1 SCOPE OF WORKThe Plumbing Subcontractor (Subcontractor) must always have a competent person on site while contracted work is being performed. Provide all labor, materials, equipment, and supervision necessary to complete the Plumbing scope of work in accordance with the conformed construction plans and technical specifications. Subcontractor shall provide protection measures for existing facilities adjacent or close to plumbing work area, and equipment and material staging areas. Subcontractor shall coordinate with Walsh for special inspections and/or pressure pipe testing. Subcontractor shall coordinate with all trades to ensure Walsh’s schedule remains uninterrupted.The plumbing scope of work is concentrated on the Advanced Water Treatment Facility, which consists of the Process Building (914), Control Building (912) and an exposed invert slab. This trade package includes below grade and concrete encased sanitary drains, potable water, recycled water piping and restroom fixtures.Plumbing subcontractor to coordinate condensate drainpipes with HVAC subcontractor.BASE BID SCOPEMobilization· Include all costs for mobilizing and demobilizing equipment necessary for the plumbing scope. Subcontractor shall anticipate multiple mobilizations between slab pours and wall construction.Spoils and On-Site Construction Debris Management· Stockpile spoils generated during cleanout onto Lot 23.· Protection of stocked spoils; off haul by others.Trench Excavation and Backfill· Trenching and backfill for under slab plumbing required up to point of connection as indicated on drawings.Installation of Plumbing Pipe and Fixtures· Pipe MaterialPlumbing pipe to extend 3 feet past the outer face of building wallGravity drain2-4 inchesPVC SCH80 – M2.01.02 Recycled water1-1/2”PVC SCH80Sanitary sewer4 inchesPVC Class 115, SDR 26Condensate drain line to remove excess water from fan coil units per drawing H0.03Pipe identification per specificationsInsulation and foam insulation for piping as required· Restroom FixturesDrain cleanoutsFloor drainsP-trapsSubcontractor will install in-wall rough-in prior to ADA shower being installed (by others). After ADA shower is installed, subcontractor will create plumbing opening (if necessary through FRP walls) and connect to fixtures to be furnished by the subcontractor.Sink and sink faucetsToiletsAccess panels as requiredIn-wall rough-inElectric hot water heatersWater filling stationTesting and Disinfection· Gravity Pipeline Testing per Specifications 33 01 11 and 33 01. Provide temporary valves, plugs, bulkheads, or other water control equipment and materials as required for the performance of the tests subject to the Owner's review.· Testing of backflow preventor.Trade Package Bid Due Date and Time: Thursday, June 12, 2025, by 2:00 PM PSTMain Trades of the Trade Package: PlumbingSBE Participation Requirement: SBE=100%Design-Builder requirements or prequalification criteria: Only pre-qualified bidders will be allowed to submit bids. If you did not previously pre-qualify during the pre-qualification timeframe, you will not be able to bid on this project.Contact for Trade Package information: Dominic C Fung, contact@example.gov web link to the Trade Package or more information: Please contact the email above if you were previously pre-qualified with Walsh and are interested in bidding for this trade package. Walsh will share the bid documents to pre-qualified subcontractors via email and/or BuildingConnected upon request.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS