Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Traffic Control and Construction Phasing Management

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the development and implementation of temporary traffic control plans to support construction activities within the City of Compton, ensuring safe and efficient movement of vehicles and pedestrians throughout the project duration. Responsibilities include managing lane closures, coordinating detours, and maintaining uninterrupted access for emergency vehicles, all while adhering to established safety standards and minimizing disruptions to the public. The work must be carefully phased to align with construction schedules and environmental or operational constraints. This subcontract under NAICS code 541370 is solicited by the City of Compton Public Works Department, with performance required in Compton, California, specifically at ZIP code 90220. Responses are due by August 28, 2026, and bidders must be prepared to deliver comprehensive traffic management solutions that prioritize public safety, regulatory compliance, and coordination with local agencies. The contract seeks experienced entities capable of handling dynamic construction environments with precision and accountability.

General Info

Develop temporary traffic control plans in Compton, CA, ensuring safety, compliance, and minimal public disruption during construction.

Agency

California → City of Compton Public Works DepartmentView Agency

NAICS

541370 - Surveying and Mapping (except Geophysical) ServicesView NAICS

Place of Performance

Compton, CA, 90220, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Compton Public Works Department
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Compton Public Works Department
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and implement temporary traffic control plans, manage lane closures, coordinate detours, and ensure emergency vehicle access during construction.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Compton Public Works Department

Same awarding agency

NAICS: 541330
New
SLED
Annual Residential Rehabilitation Project (Phase 2D)
Solicitation # CIP# 18-01
The City of Compton Public Works Department is soliciting qualified engineering consultants to provide construction management and inspection services for the Annual Residential Rehabilitation Project Phase 2D, focused on Tucker Street, Bradfield Avenue, and Greenleaf Boulevard in Compton, California. The scope of work includes comprehensive street rehabilitation activities such as cold milling, ARHM and AC pavement installation, aggregate base placement, curb and gutter construction, sidewalk upgrades, driveway approaches, cross gutters, alley intersections, utility adjustments to grade, curb ramps, signing, striping, pavement legends, speed humps, and traffic signal loop installations. All work must strictly adhere to the approved plans, specifications, and industry standards, with materials testing conducted by a certified geotechnical professional. The consultant is responsible for daily inspection and reporting, photographic and video documentation, scheduling and progress monitoring, traffic control plan review, change order analysis with independent cost estimates, meeting coordination, and ensuring compliance with environmental and regulatory permits. Final acceptance requires a walkthrough, punch-list completion, and submission of as-built drawings, O&M manuals, and certificates of compliance. Proposals must be submitted by 5:00 p.m. on Thursday, August 27, 2026, to the City of Compton City Clerk’s Office at 205 South Willowbrook Avenue, Compton, CA 90220, addressed to Project Manager John D. Strickland, Jr. Submissions require one original, two copies, and one digital copy on USB drive, all sealed and labeled with the submitting entity’s contact information. A separate sealed envelope must contain the fee schedule and a total “Not to Exceed” fee covering labor, materials, reprographics, meetings, and presentations. Offerors must include a company overview with organizational chart, staffing plan, resumes of key personnel, license numbers for the Construction Manager and Inspectors, a proposed work schedule, and documentation regarding the use of Disadvantaged Business Enterprises. The evaluation criteria include completeness of proposal, understanding of scope, past performance, qualifications of team members, resources allocated, and schedule feasibility, though specific weights are not defined. The City reserves the right to reject any or all proposals. The overall project engineer’s estimate is approximately $3,024,120, but the contract award amount will be determined solely by the proposed “Not to Exceed” fee submitted by the consultant. All aspects of the project are subject to the City’s contract administration procedures, with payment requests reviewed and verified prior to dis
Engineering Services

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details