Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Control and Field Safety Planning for Drainage Inspections

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 541330
New
SLED
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation # 2026-RFQL-054
The City of Napa Utilities Department is seeking a qualified consulting team through Request for Qualifications 2026-RFQL-054 to perform a stability assessment, spillway improvements, and a feasibility alternatives study for the Conn Dam. The project is driven by requirements from the California Department of Water Resources Division of Safety of Dams (DSOD), which identified that the existing spillway does not meet current Probable Maximum Flood (PMF) design criteria and raised concerns regarding the long-term geotechnical stability of the dam embankment. The selected consultant will be responsible for conducting comprehensive subsurface explorations, performing static and seismic slope stability evaluations, and recommending alternatives to mitigate spillway deficiencies. Additionally, the scope includes evaluating options to increase reservoir storage capacity to enhance water supply reliability and flood protection, while supporting future U.S. Army Corps of Engineers (USACE) feasibility studies. This procurement follows a Qualifications-Based Selection process per the Brooks Act, where the award is based on technical capability and experience rather than cost. Evaluation is a two-step process consisting of a Statement of Qualifications weighted at 70 percent and optional oral interviews weighted at 30 percent. A critical project milestone is the submission of a comprehensive geotechnical investigation report to the DSOD by December 31, 2028. The contract requires strict adherence to federal and state regulations, including 2 CFR Part 200 Uniform Guidance, the Build America Buy America Act, and various civil rights and accessibility certifications. Statements of Qualifications are due by October 29, 2026, via the City's Opengov procurement portal.
Utilities Department

POSTED

about 4 hours ago

DEADLINE

in about 5 hours

AI Contract Overview

Show more

The contract outlines the development and implementation of traffic control plans for field crews conducting drainage inspections near roadways in San Diego, with a primary focus on ensuring strict adherence to established safety standards. The work involves designing and deploying strategies to manage vehicle and pedestrian traffic around inspection sites, minimizing risks to workers and the public while maintaining efficient roadway operations. Contractors are expected to tailor plans to specific site conditions, coordinate with local authorities as needed, and remain compliant with all applicable transportation and occupational safety regulations. This subcontract, classified under NAICS code 541330, is issued by San Diego County with a response deadline of July 18, 2026, and a posted date of May 12, 2026. Performance is restricted to the San Diego area, and while no set-aside provisions or organizational type requirements are specified, the contract demands proven experience in traffic management and field safety planning. All proposed solutions must prioritize worker protection and public safety, with documentation and implementation procedures subject to review by county representatives. Interested parties must submit proposals through the provided external portal by the stated deadline.

General Info

Develop traffic control plans for drainage inspections in San Diego, ensuring safety and regulatory compliance by July 18, 2026.

Place of Performance

San Diego, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 13226.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFI - COUNTYWIDE DRAINAGE ASSET COLLECTION SERVICES

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → San Diego County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and implement traffic control plans for field crews working near roadways during drainage inspections, ensuring compliance with safety standards.

More opportunities from California → San Diego County

Same awarding agency

NAICS: 236220
New
SLED
Authorization to Advertise and Award of a Construction Manager at Risk Contract for Major Systems Renovation of the San Diego Central JailThe County of San Diego General Services is seeking a Construction Manager at Risk for the major systems renovation of the San Diego Central Jail located at 1173 Front Street, San Diego, California. The project focuses on modernizing critical infrastructure, including the replacement and upgrade of mechanical, electrical, and plumbing systems, as well as heating, ventilation, and air conditioning throughout the facility. The scope of work encompasses tenant improvements to housing units, administrative areas, kitchen, and laundry facilities, along with the modernization of dormitory rooms and office spaces. Additionally, the project includes the installation of new fire alarms, communications systems for radio, data, and phone, and integrated electronic security and control systems. This renovation is designed to improve existing facilities without expanding the overall footprint or capacity of the jail. Due to the nature of the work involving interior alterations and the replacement of utility systems, the project is categorically exempt from the California Environmental Quality Act under Sections 15301 and 15302. Project management is led by Marcus Lubich, and the initiative follows a Board of Supervisors approval granted on February 25, 2025, with formal documentation processed on September 11, 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS