Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Traffic Control & Pavement Marking

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Missouri Public Works agency involves providing temporary traffic control devices and permanent pavement markings for prime contractors on City of Florissant and MoDOT roadway projects. The scope of work includes the implementation of Work Zone Traffic Management Plans, the installation of signage and traffic cones, and the application of 4-inch white Class 1 pavement marking paint with 18-mil Type P beads using specialized striping machines to ensure a safe and completed roadway. The opportunity is categorized under NAICS code 561999 and was posted on August 14, 2026. Interested parties must submit their responses by the deadline of September 9, 2026, at 3:00 PM. Further details and application processes are available through the Florissant procurement portal.

General Info

Subcontract for traffic control and pavement markings for Florissant and MoDOT roadway projects.

Agency

Missouri → Public WorksView Agency

NAICS

561990 - All Other Support ServicesView NAICS

Place of Performance

MO, USA

Set-Aside

NONE

Documents

This scope was carved out of 25-0266-PW.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mullanphy Rd - Shackelford Rd to Patterson Rd - STP-4901(650) CONSTRUCTION

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMissouri → Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
Missouri → Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides temporary traffic control devices and applies permanent pavement markings for prime contractors on City of Florissant/MoDOT roadway projects. Implements Work Zone Traffic Management Plans, installs traffic cones and signage, and applies 4-inch white Class 1 pavement marking paint with 18-mil Type P beads using striping machines. Delivers a safe work zone and completed roadway striping.

Similar Contracts

Same NAICS industry code

NAICS: 561990
New
Federal
R--JEFF - Utility Mapping
Solicitation # 140P6226Q0007
The National Park Service is seeking quotes for a firm-fixed-price contract to perform non-invasive subsurface utility locating and mapping of irrigation systems and utility lines across approximately 45 acres of landscaped and turf areas at Gateway Arch National Park. The primary objective is to create a general reference for park maintenance staff to diagnose irrigation failures and identify utility locations. Deliverables include non-survey-grade digital and paper maps, with a preference for GIS ESRI file geodatabase format projected to UTM Zone 15, NAD83 (2011). The contractor must utilize industry-standard methods such as Ground-Penetrating Radar and Electromagnetic locating equipment. This procurement is a total small business set-aside under NAICS 561990. Performance is expected to occur within 60 to 90 days of award, and the contractor is provided a one-year workmanship warranty following project acceptance. Key operational restrictions include a prohibition on using UTVs or vehicles off paved surfaces and a general ban on drones unless a specific exception is granted and the pilot is FAA certified. Marking paint is permitted but must be limited and avoided on improved surfaces. Quotes must be submitted on company letterhead via email to the contracting officer by September 10, 2026, and must include the offeror's SAM UEI and completed FAR 52.212-3 representations. Award will be based on the most advantageous combination of price and technical factors.
Mwr Missouri MABO(62000)

POSTED

1 day ago

DEADLINE

in 4 days
View Details

More opportunities from Missouri → Public Works

Same awarding agency

NAICS: 237310
SLED
Mullanphy Rd - Shackelford Rd to Patterson Rd - STP-4901(650) CONSTRUCTION
Solicitation # 25-0266-PW
The Mullanphy Road Resurfacing project, Federal Project No. STP-4901(650), is a federally funded construction effort administered by the City of Florissant under FHWA and MoDOT oversight. The scope of work involves milling and overlaying the asphalt section of Mullanphy Road from Shackelford Road to Patterson Road, constructing a new sidewalk on the south side from Loveland Drive to Vesper Drive, and installing ADA-compliant curb ramps. Additional requirements include grading, pavement repair, entrance reconstruction, and storm sewer improvements. The project is supported by completed NEPA environmental clearance and MoDOT right-of-way certification, with utility coordination substantially finished to ensure minimal impact on construction progress. The contract is awarded to the lowest responsive and responsible bidder, with electronic submissions required via the OpenGov portal by September 9, 2026. The performance period is set for 100 working days, with a completion deadline of May 14, 2027, and liquidated damages of $1,100 per day for delays. Contractors must adhere to strict compliance standards, including the Build America, Buy America Act, Missouri and federal prevailing wage laws, and the Anti-Discrimination Against Israel Act. Required security includes a 5% bid bond, a 100% performance bond, and insurance coverage of at least $1,000,000. Payment is processed within 30 days of approval by the Director, provided that invoices are submitted on company letterhead with certified payroll records.
Highway, Street, and Bridge Construction

POSTED

23 days ago

DEADLINE

in 3 days
View Details