Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Missouri was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mullanphy Rd - Shackelford Rd to Patterson Rd - STP-4901(650) CONSTRUCTION

Closed
25-0266-PWState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

2 days ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

2 days ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Project STP-4901(650) is a federally funded Surface Transportation Program construction contract administered by the City of Florissant, Missouri, for the resurfacing and improvement of Mullanphy Road from Shackelford Road to Patterson Road. The scope of work includes grading, pavement repair, mill and overlay, entrance reconstruction, storm sewer improvements, and the installation of new sidewalks and ADA-compliant curb ramps. The project is subject to FHWA and MoDOT oversight, with NEPA environmental clearance and right-of-way certification already obtained. Utility coordination is substantially complete, and no significant utility conflicts are expected to impact the contractor's progress. The contract is a lump sum agreement with a performance period of 150 calendar days, establishing a completion deadline of August 13, 2027. Failure to meet this deadline results in liquidated damages of $1,100 per day. Bidders must provide a 5% bid security, and the successful awardee must furnish a 100% performance bond and payment bond sureties. Contractors are required to pay the higher of the Missouri state prevailing wage or Davis-Bacon federal rates and must comply with Buy America requirements for iron and steel. Additional mandates include a $1,000,000 insurance policy naming the City as an additional insured, E-Verify compliance via a work authorization affidavit, and certification against the boycott of Israel. The contract will be awarded to the lowest responsive and responsible bidder.

General Info

City of Florissant Mullanphy Road construction project due May 14, 2027.

Place of Performance

MO, USA

Set-Aside

NONE

Documents

14

25 0266 PW - Mullanphy Rd Resurfacing IFB

PDF, High priority: read this first14 pages · ifb
High

City of Florissant Contract Agreement 2026

DOC, High priority: read this firstcontract-document
High

General Conditions for City of Florissant Public Works Contract

PDF, High priority: read this first9 pages · general-conditions
High

IFB 25-0266-PW Mullanphy Rd Resurfacing STP-4901(650) Construction

PDF, High priority: read this first14 pages · ifb
High

Instructions to Bidders - City of Florissant

PDF, High priority: read this first7 pages · instructions-to-bidders
High

Missouri Annual Wage Order No. 31 for St. Louis County

PDF, High priority: read this firstwage-determination
High

Special Conditions for City of Florissant Construction Contract

PDF, High priority: read this first5 pages · special-conditions
High

State of Missouri Labor Provisions Wage Determination

PDF, High priority: read this first1 page · wage-determination
High

STP-4901(650) Mullanphy Road Resurfacing Addendum No. 1

PDF, High priority: read this first1 page · amendment
High

STP-4901650 Mullanphy Road Resurfacing Construction Plans

PDF, High priority: read this firstspecifications
High

STP-4901(650) Mullanphy Road Resurfacing Invitation for Bids

PDF, High priority: read this first1 page · ifb
High

STP-4901(650) Mullanphy Road Resurfacing Invitation for Bids

PDF, High priority: read this first158 pages · rfb
High

Exhibit 4 Anti-Discrimination Against Israel Act Certification

PDF, Low priority2 pages · certification
Low

Work Authorization Affidavit for Business Entities - City of Florissant

PDF, Low priority1 page · affidavit
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Public Works
Contacts2 people available
OfficeFlorissant, MO, 63031, USA
Organization / AgencyMissouri → Public Works
Office AddressFlorissant, MO, 63031, USA
Contacts
Melanie BringerPurchasing

Interested Companies (14)

Gershenson ConstructionEureka, MO
Raineri Construction
Byrne & Jones EnterprisesSt. Louis, MO

See All 14 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
STP-4901(650) is a federally funded Surface Transportation Program project administered locally by the City of Florissant under FHWA and MoDOT oversight. NEPA environmental clearance for the entire project was obtained on October 30, 2024, and right-of-way clearance was certified by MoDOT on April 15, 2026. Utility coordination has been substantially completed. Ameren Missouri maintains overhead power facilities along the south side of Mullanphy Road and will relocate one conflicting pole prior to construction. AT&T, Charter Communications, and MCI/Verizon facilities are clear of conflicts. Spire Gas and Missouri American Water maintain underground mains beneath the roadway; no conflicts are anticipated, though valve adjustments to grade will be coordinated with each utility during construction. There are no railroads within or adjacent to the project limits. Based on this status, utility work is not expected to impact the contractor's progress. The contract carries 100 Working Days for completion on May 14th, 2027 , with liquidated damages assessed at $1,100 per day for failure to complete work within the allowed contract time.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS