Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on November 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closed
23-03921AState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
27-018 T6026-1 North River Gap Sidewalk Project
Solicitation # 27-018
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project, which involves the construction of approximately 300 linear feet of sidewalk on the east side of North River Drive, spanning from 100 North River Drive to 501 North River Parkway. The scope of work includes site preparation through the removal of granite, concrete, and vegetation, the supply and grading of clean fill and topsoil, the reconstruction of two driveways, and the installation of ADA-compliant ramps. All work must adhere to Georgia Department of Transportation (GDOT) Standard Specifications and the Manual of Uniform Traffic Control Devices (MUTCD), with materials sourced from GDOT certified suppliers. The project requires a 75-day performance period from the issuance of the Notice to Proceed, with work permitted on weekdays from 8:00 AM to 5:00 PM and traffic-interfering activities restricted to 9:00 AM to 4:00 PM. Bids for solicitation 27-018 must be submitted by January 7, 2027. Required documentation includes a bid schedule, price certification, drug-free workplace certification, and a Georgia Security and Immigration Compliance Act affidavit. A bid bond is mandatory if the bid price exceeds $100,000, and the successful contractor must provide performance and payment bonds, as well as a certificate of insurance. Key deliverables include before-and-after project videos, independent testing for concrete and sub-grade compaction, and a two-year warranty on sod installation. There is no specified set-aside status for this solicitation.
City of Sandy Springs

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
International
EN27TFM021 South Peter FSR Extension - Arrow
Solicitation # EN27TFM021
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules. Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
BC Timber Sales Branch

POSTED

about 11 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The City of San Antonio is soliciting bids for the Texas A&M University Area Streets Phase 2 project, funded by the 2022 Bond. This infrastructure project involves roadway improvements from Maria Ferrier Avenue to Mauermann Road, specifically the construction of a new roadway featuring two travel lanes, concrete curb and gutter, sidewalks, and driveway approaches. The scope of work also includes comprehensive drainage improvements, excavation, striping, and sewer work. Under solicitation number 23-03921A, the contractor is responsible for providing and installing 2.5 inch grey schedule 40 conduit. While CPS will provide the streetlight bases for the contractor to install, CPS Energy will handle the subsequent wiring and connection of the streetlights. This Formal Invitation for Bids was issued on October 2, 2026, with a revised bid opening date of November 10, 2026, as established in Addendum No. 5. Administration of the procurement is managed by the Finance Department Procurement Division, with Jaime E. Contreras serving as the Procurement Manager.

General Info

San Antonio bids for Texas A&M Area Streets Phase 2 roadway and drainage improvements.

Agency

Texas → CITY OF SAN ANTONIO

Place of Performance

TX, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstamendment
High
PDF, Low prioritypresolicitation
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 7 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 3, 2026 to Nov 6, 2026.

Deadline changed

Response deadline changed from Nov 6, 2026 to Nov 10, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more

Full Description

Show more
Construct roadway improvements to includesidewalks, driveway approaches, drainage, and other improvements to include newroadway with two travel lanes, concrete curb and gutter, streetlights anddrainage improvements.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS