Traffic Control and Signage
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the installation and management of temporary traffic control zones, detours, signage, and flagging operations along State Route 190, requiring precise coordination to ensure public safety and minimal disruption during construction or maintenance activities. The work must adhere to state and federal guidelines for traffic control, with specific focus on the deployment and removal of appropriate signage, barriers, and flagger personnel to guide vehicles safely through work areas. All services are to be performed under the authority of the Friant Water Authority in California, and the contract is classified as a subcontract under NAICS code 238990, indicating it falls within other heavy and civil engineering construction support activities. Performance is expected to take place within the geographic area of SR 190, though exact location details are not specified, and the contract was posted on July 2, 2026, signaling upcoming procurement activity for this critical infrastructure support service.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
This scope was carved out of Friant-Kern Canal Middle Reach Capacity Correction Project.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
