Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Traffic Control and Work Zone Management

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Roseville in California is seeking a subcontractor for Traffic Control and Work Zone Management to support prime contractors on City Environment Utilities Department projects. The selected provider will be responsible for implementing traffic control procedures within parkways and road rights-of-way, which includes the provision of safety devices, signage, barricades, and flaggers to ensure a safe environment for City staff and workers. All operations must strictly adhere to local traffic safety regulations and City safety standards to deliver a fully managed and secure work zone. This subcontract opportunity, categorized under NAICS code 561990, was posted on September 15, 2026, with a response deadline of September 30, 2026. The work will be performed within the city of Roseville, California. Interested parties should refer to the official solicitation link for further application details.

General Info

Roseville, CA seeks traffic control subcontractors for City Environment Utilities Department projects.

Agency

California → City of RosevilleView Agency

NAICS

561990 - All Other Support ServicesView NAICS

Place of Performance

Roseville, CA, 95678, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260915049.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Boring And Conduit Installation Services

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Roseville
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides traffic control and safety management for prime contractors on City Environment Utilities Department projects. Implements traffic control procedures for work within parkways and road rights-of-way, provides safety devices, signage, barricades, and flaggers, and manages work zone safety for City staff and workers. Must comply with local traffic safety regulations and City safety standards. Delivers a safe, managed work zone.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Roseville

Same awarding agency

NAICS: 238210
New
SLED
Procurement Of Emergency Backup Generator Replacement For Dual Purpose Pump Station
Solicitation # RFP 08-187
The City of Roseville is soliciting proposals for the procurement and installation of an emergency backup generator to replace an end-of-life 750kW system at the Dual Purpose Pump Station in Roseville, California. The selected contractor will be responsible for providing a 500kW, Tier 2, 277/480VAC, 3-phase, 60Hz standby engine generator featuring a sub-base tank, integral load bank, radiator-cooled mounting, electronic isochronous governor, and a critical grade silencer. Key responsibilities include providing equipment submittals, coordinating with the design team to reach a 100% design submittal, and procuring permits from the Placer County Air Quality Board. While the City will handle demolition and site preparation, the contractor must perform the jobsite installation inspection and ensure all equipment and safety signage comply with California state safety orders and building codes. Proposals are due by October 21, 2026, and will be evaluated based on a 100-point scale, with the City potentially conducting interviews to assess presentation quality and communication style. This is a prevailing wage project requiring certified payroll for contracts exceeding $25,000.00. The successful proposer must provide a 100% Faithful Performance Bond and a 100% Labor Bond, as well as proof of registration with the California Secretary of State. Required submission documents include a Proposer's Certification, Non-collusion Declaration, and a list of contractor licenses. The award will be granted to the responsible proposer deemed most advantageous to the City, who must then execute a City-prepared contract.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS