Traffic Control and Work Zone Safety
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Traffic Control and Work Zone Safety involves the implementation of temporary traffic control measures for construction activities on I-5 in Sacramento. The scope of work includes the deployment of signage, cones, and flaggers, as well as necessary coordination with Caltrans, District 3 in the Marysville/Sacramento area. The project is categorized under NAICS code 561730 and was posted on September 19, 2025. It is managed by the state of California through Caltrans to ensure safety and traffic flow within the designated work zones during the construction period.
General Info
Agency
Place of Performance
Sacramento, CASet-Aside
Documents
This scope was carved out of 03-25-6-BB-1377.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
CVIN, dba Vast Networks Interstate 5 Middle-Mile Broadband Network Project (Encroachment Permit 03-25-6-BB-1377)
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
