Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Traffic Control Device Installation & Removal Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Independence is soliciting bids for subcontracted services related to the on-site installation, maintenance, and removal of temporary traffic control devices within designated work zones along city-maintained roadways. This contract encompasses all necessary activities to ensure safe and compliant traffic management during construction, maintenance, or utility operations, requiring adherence to state and federal standards for traffic control. Contractors must be prepared to respond promptly to work zone schedules, operate safely in active roadway environments, and maintain equipment and personnel to support round-the-clock or time-sensitive deployment as needed. The opportunity is open as a subcontract and has a response deadline of August 25, 2026, with the solicitation posted on July 27, 2026. The North American Industry Classification System code listed is 238990, indicating it falls under other specialty trade contractors, typically covering specialized construction services not classified elsewhere. The place of performance is limited to roadways under the jurisdiction of the City of Independence in Missouri, and bidders must comply with all local regulations and safety protocols. While no set-aside designation or specific point of contact details are provided, interested parties should access the official bid page via the provided link for full submission requirements and terms.

General Info

Bids sought for temporary traffic control services on City of Independence Missouri roadways, due August 25, 2026.

Agency

Missouri → City of IndependenceView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

MO, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMissouri → City of Independence
ContactsNo contacts available
OfficeN/A
Organization / Agency
Missouri → City of Independence
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site installation, maintenance, and removal of temporary traffic control devices at designated work zones across city-maintained roadways.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Proposed Chain Link Fence and Gates for Tank#1, Control Building and Well No. 1The Portland Borough Authority is soliciting sealed bids online through the PennBid platform for the installation of a chain link fence and associated gates at two secured areas within its Tank No. 1 facility in Upper Mount Bethel Township, Northampton County, Pennsylvania. The project involves fencing around Tank No. 1 and the Control Building, totaling approximately 375 linear feet, and around the Wellhouse and Emergency Generator, totaling approximately 180 linear feet, with each area including a twenty-foot swing or slide gate and a four-foot man gate. The fence for the first area must integrate with an existing perimeter fence around the reservoir. Bids must be submitted electronically via PennBid by 9:00 AM local time on August 17, 2026, with all bidding documents available free of charge starting July 27, 2026. Each bid must include a bid security of ten percent of the total bid amount in the form of a certified check, bank draft, cash, or a surety bond, and a Non-Collusion Affidavit must accompany all submissions. The successful bidder will be required to provide performance and payment bonds at 100 percent of the contract award amount, issued by a surety company listed in the U.S. Treasury Department’s Circular No. 570 and authorized to operate in Pennsylvania. All labor must comply with Pennsylvania Department of Labor and Industry prevailing wage rates, and the contractor must certify compliance with nondiscrimination hiring practices and furnish proof of adequate insurance coverage. The Authority may hold bids for up to 45 days following the opening to evaluate qualifications and ensure compliance. Bids will be opened online on PennBid at the deadline, with results reviewed at the PBA Board meeting the same day. The Authority retains full discretion to reject any or all bids, waive minor irregularities, and accept any proposal it deems most advantageous, and the bidder is responsible for paying the PennBid platform fee.
Northampton County

POSTED

about 17 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Missouri → City of Independence

Same awarding agency

NAICS: 541611
New
SLED
Anti-Boycott Compliance & Affidavit Management (Israel)The contract seeks advisory and documentation services to ensure compliance with Missouri’s Anti-Discrimination Against Israel Act, specifically RSMo 34.600, requiring the contractor to conduct thorough supply chain reviews and manage affidavits related to boycott compliance. The services must address the identification and verification of entities involved in the supply chain to confirm they are not participating in or supporting discriminatory boycotts of Israel, and to maintain proper documentation to support state compliance efforts. The work involves interpreting legal requirements, implementing compliance procedures, and providing accurate, auditable records to uphold the state’s position against discriminatory boycotts. The contract is structured as a subcontract under the City of Independence, Missouri, with a posting date of July 21, 2026, and a response deadline of August 4, 2026. It falls under NAICS code 541611, indicating a focus on management consulting services. The place of performance and point of contact details are unspecified, and no set-aside classification is indicated. While the bid is accessible through the PublicPurchase platform, all work is expected to be conducted in alignment with Missouri state law, with emphasis on legal adherence, procedural diligence, and documentation integrity throughout the supply chain review process.
Administrative Management and General Management Consulting Services

POSTED

7 days ago

DEADLINE

in 7 days
View Details
NAICS: 238320
New
SLED
Protective Coatings Replacement: Filter No. 10 Courtney Bend Water Treatment PlantThe City of Independence, Missouri, is seeking qualified firms to perform protective coating replacement on Filter No. 10 at the Courtney Bend Water Treatment Plant. The scope of work requires comprehensive surface preparation and application of new protective coating systems to both interior and exterior surfaces of the filter, including all necessary equipment, materials, labor, and workmanship to ensure durable, high-quality results. Bids must be submitted electronically through the publicpurchase.com portal by the deadline of August 25, 2026, with no paper, fax, or email submissions accepted. A virtual bid opening will be conducted on the same date via Microsoft Teams, with access details provided for participants. The place of performance is clearly defined as the Filter No. 10 facility located in Independence, Missouri. The contract is issued as an Invitation to Bid under solicitation number 26037, with a NAICS code of 238320, indicating a focus on specialized trade contracting. While the estimated contract value is not specified, the solicitation implies a firm-fixed-price structure typical of public works bids. The contractor must comply with Missouri Revised Statute § 34.600, certifying that they do not participate in any boycott of Israel, and must submit a signed affidavit affirming this compliance. Labor compensation must adhere to prevailing wage requirements under Missouri state law, with no additional details provided regarding payment terms, accounting codes, invoicing systems, or inspection criteria beyond general compliance with public works regulations. No formal contract clauses, evaluation factors, packaging standards, or detailed inspection procedures are included in the solicitation materials. Contract administration information such as the Contracting Officer, COR, COTR, or payment office details is not provided. All submissions must be uploaded through the online portal using any acceptable file type, with no restrictions on format, number of files, or document length.
Painting and Wall Covering Contractors

POSTED

7 days ago

DEADLINE

in 28 days
View Details