Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Control System Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract is for the setup and maintenance of temporary traffic control systems in Riverside, California, requiring full compliance with Caltrans and MUTCD standards. It encompasses the installation and ongoing management of signage, delineators, and channeling devices to ensure safe and efficient traffic flow during roadwork or construction activities. The work must be performed in accordance with state and federal guidelines to guarantee public safety and regulatory adherence throughout the project duration. This is a subcontract with a response deadline of August 19, 2026, and is classified under NAICS code 238990 for other construction-related services. The contracting entity is the County of Riverside, with performance location specified as 92501 in Riverside. Interested parties must submit proposals by the deadline to be considered, and all work must be carried out at the designated site with strict attention to standard traffic control protocols. The contract does not indicate a specific set-aside designation, and no point of contact information is provided in the solicitation.

General Info

Temporary traffic control setup and maintenance in Riverside, CA, per Caltrans and MUTCD standards by August 19, 2026.

Place of Performance

Riverside, CA, 92501, USA

Set-Aside

NONE

Documents

This scope was carved out of D6-0053.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Gilman Springs Road Reconstruction Alessandro Boulevard To 250 Feet West Of Kevin Road Community Of Badlands

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Setup and maintenance of temporary traffic control systems including signage, delineators, and channeling devices in compliance with Caltrans and MUTCD standards.

More opportunities from California → County of Riverside

Same awarding agency

NAICS: 237310
SLED
Dos Lagos Drive And Weirick Road Resurfacing
Solicitation # D4-0089
Solicitation D4-0089 is a project issued by the County of Riverside Transportation Department for the resurfacing of approximately 0.3 miles of asphalt concrete pavement on Dos Lagos Drive and Weirick Road, from Temescal Canyon Road to Knabe Road in the Community of El Cerrito, California. The scope of work includes cold planing existing pavement, applying crack seal treatment, and overlaying with Hot Mix Asphalt (HMA). Additional requirements involve the installation of thermoplastic pavement markings, retroreflective markers, and the replacement of signal backplates with yellow retroreflective borders. The project must be completed within 25 calendar days from the Notice to Proceed, with primary work performed at night between 9:00 PM and 5:00 AM. The contract is governed by the 2025 Standard Specifications of the State of California Department of Transportation. Award selection is based on the lowest responsive and responsible bid. Bidders must provide a 10% bid bond, and the successful contractor must provide 100% performance and payment bonds, as well as evidence of insurance within ten business days of the award. Required submission documents include a non-collusion declaration, an Iranian Contracting Act certification or exemption, and a subcontractor list. All work is subject to prevailing wage rates and strict quality assurance sampling and testing conducted by the County and the Engineer.
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS