Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Washington was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Safety and Roadway Design Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 14 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves the design and engineering services for the rechannelization of a roadway, converting it from a four-lane to a three-lane configuration with a center turn lane. The project scope includes developing traffic control plans and implementing geometric layout improvements aimed at enhancing overall traffic safety. This effort is intended to improve traffic flow and reduce potential conflicts by creating safer and more efficient roadways. Issued by the City of Shoreline, Washington, this subcontract falls under the NAICS code 541330, which covers engineering services. The solicitation was posted on May 11, 2026, with a response deadline set for June 8, 2026. Interested parties can access further details and submit bids through the City of Shoreline’s public purchase platform. The contract emphasizes collaborative efforts to achieve traffic safety upgrades aligned with municipal infrastructure goals.

General Info

Design and engineering services for roadway rechannelization, traffic control, and safety improvements in Shoreline.

Agency

Washington → City of ShorelineView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of 1367835.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NE 175th Street – 5th Ave NE to 15th Ave NE Safety Improvements Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Shoreline
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → City of Shoreline
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design of roadway rechannelization from 4-lane to 3-lane with center turn lane, traffic control plans, and geometric layout improvements to enhance safety.

More opportunities from Washington → City of Shoreline

Same awarding agency

NAICS: 541350
SLED
Construction Management Services for 145th Street Off Corridor Bike Network
Solicitation # 1395428
The City of Shoreline, Washington, is soliciting statements of qualifications under RFQ 1395428 for Construction Management and Construction Administration services for the 145th Street Off Corridor Bike Network project. The selected consultant will provide project oversight, inspection services, financial tracking, and review of plans, specifications, and estimates to ensure compliance with federal, state, and local guidelines. The scope of work includes managing the installation of pedestrian and bicycle facilities, ramps, sidewalks, traffic circles, and wayfinding signs, with a focus on adhering to WSDOT and FHWA standards. The underlying construction project has an estimated cost between 750,000 and 1,500,000 dollars. Submissions are due by September 21, 2026, at 5:00 PM Pacific Local Time via publicpurchase.com. Proposals must be submitted as a single PDF not exceeding 17 pages, divided into an executive summary, statement of experience, project approach, and related project references. Evaluation is based on a 100-point scale, prioritizing the project approach and experience with federally funded projects. The City will use a best value procurement trade-off process to select the most qualified firm, with hourly rates negotiated after the technical selection. The anticipated notice to proceed is November 9, 2026, with construction expected to begin in March 2027. A voluntary small business enterprise participation goal of 10 percent has been established for the project.
Building Inspection Services

POSTED

19 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS