Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Signal Control System Programming and Commissioning

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SEEKING QUALIFIED SUBCONSULTANTS IN RIVERSIDE COUNTY/SOCAL TO SUPPORT WELL REPLACEMENT PROJECT WITH WATER DISTRICT
Solicitation # seeking-qualified-subconsultants-riverside-countysocal-support-well-replacement-project-water
GHD Inc. is soliciting qualified subconsultants to support the Corydon Well Replacement Design Project for Elsinore Valley Municipal Water District in Riverside County, California, with a focus on engaging Disadvantaged Business Enterprises, Small Business Enterprises, Women-Owned Business Enterprises, Minority-Owned Business Enterprises, and other certified small businesses. The project requires a range of professional services including engineering, environmental consulting, surveying, geotechnical analysis, permitting, public outreach, and utility location, with work expected to align with multiple NAICS codes such as 541330 for engineering services. Interested firms must submit a qualifications package by August 7th, 2026, and request solicitation documents no later than 5 p.m. PST on August 14th, 2026, to Charlie Brown at charles.brown@ghd.com. The formal response deadline for submissions is September 15th, 2026, and the opportunity is set aside under SBA programs for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities, alongside DBE certification under the Department of Transportation.
GHD Inc.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc., acting on behalf of the Elsinore Valley Municipal Water District, is seeking proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project. The project involves designing a new municipal groundwater production well to replace and permanently abandon the existing Corydon well, with technical specifications requiring compliance with AWWA potable water well standards, SWRCB-DDW, DWR, and EVMWD requirements. The new well must feature a 24-inch diameter stainless steel Ful-Flo louvered screen, match existing vertical turbine pump equipment, and tie into the Corydon Blend station and Malaga blending transmission main. The scope is divided into two phases: Phase 1 includes civil site design, technical specifications, line-bid items for drilling and abandonment, plus full-time on-site construction management oversight; Phase 2 involves architectural, structural, electrical, mechanical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key deliverables include a Preliminary Design Report at 30% design level, review of up to 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and development of Record Drawings reflecting field changes, along with startup and operator training support. The solicitation is issued as a Request for Proposals under the SBA small business set-aside program, with eligibility extended to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, SBA-certified Service-Disabled Veteran-Owned Small Business, and Disadvantaged Business Enterprise firms. All proposals must be submitted via the PlanetBids Vendor Portal by 10:00 a.m. local time on September 1, 2026, following strict formatting requirements including a cover letter, detailed project approach, qualified personnel resumes, representative project history, three references, and a fully itemized cost proposal broken down by task with hourly rates and incidental costs. Proposals must include mandatory certifications such as American Iron and Steel Compliance, Lobbying Certification, Debarment and Suspension Certification, System for Award Management (SAM) information, Executive Order N-6-22 compliance related to Russian sanctions, Conflict of Interest Disclosure, Insurance Requirements Acknowledgment, Public Works Contractor Registration, and Iran Contracting Act certification if the proposal exceeds $1 million. The award will be based on demonstrated competence and professional qualifications with evaluation factors weighted as follows: Relevant Qual
Ardurra Group, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design, construction support, and full lifecycle engineering services for a new municipal groundwater production well to replace and permanently abandon the existing Corydon Well, located on Elsinore Valley Municipal Water District (EVMWD) property. The project is divided into two phases: Phase 1 focuses on the design of the new well, site facilities, and abandonment of the existing well in strict compliance with Riverside County and California State Water Resources Control Board standards, including preparation of technical specifications, civil site drawings, line-bid items, bidding assistance, and full-time on-site construction management and hydrogeological oversight during drilling. Phase 2 involves engineering design and support for the well equipping phase, encompassing architectural, civil, mechanical, structural, electrical, and instrumentation and controls systems, along with testing, commissioning, and documentation for operational readiness. The new well must feature a 24-inch diameter stainless steel Ful-Flo louvered screen matching the existing casing depth, with sanitary seals installed per AWWA potable water well construction standards. The project is subject to the Build America, Buy America Act and 2 CFR Part 184, requiring certification of domestic sourcing for iron, steel, and manufactured products, with detailed documentation and substitution review procedures mandated. Federal funding from a Bureau of Reclamation grant up to $400,000 imposes compliance with Uniform Administrative Requirements (2 CFR Part 200), including debarment and suspension certification, lobbying restrictions under the Byrd Act, Clean Air Act and Clean Water Act flow-downs to subcontracts over $150,000, and procurement of recovered materials when purchase thresholds are met. The engagement requires a fully qualified firm to provide comprehensive multidisciplinary services including hydrogeology, aquifer analysis, geotechnical investigation, soil and corrosion testing, subsurface utility location, environmental permitting, water quality sampling, public outreach, and regulatory coordination with state and local agencies. A detailed proposal must include firm qualifications, relevant municipal water and well project experience, resumes of key personnel, current California professional licenses, DBE and small business participation plans, a California Air Resources Board Certificate of Reported Compliance, Department of Industrial Relations registration for public work, and a validated Unique Entity Identifier with System for Award Management status. Proposals must address the detailed scope outlined in Attachments 1 and A, provide a cost structure broken down by task with hourly rates and incidental charges, and comply with all certification requirements in Attachment 2—including Conflict of
GEI Consultants, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract encompasses the programming, testing, and field commissioning of traffic signal controllers along with the development and deployment of timing plans, all of which must be seamlessly integrated with the City of San Diego’s central traffic management systems. Work will be performed on-site in San Diego, specifically within the 92111 area, ensuring that all signal operations are optimized for local traffic patterns and synchronized with citywide infrastructure. The contractor is expected to deliver fully functional systems that meet performance standards, including rigorous testing protocols and successful field validation prior to final handover. Subcontracting for this effort is permitted under NAICS code 541330, indicating the nature of the work falls under engineering services, and the deadline for submission is August 11, 2026. The project requires technical expertise in traffic signal hardware and software, central system interfaces, and real-world implementation under city standards. All activities must align with the operational goals of the City of San Diego to improve traffic flow, safety, and system reliability, with no set-aside provisions specified, meaning all eligible entities may respond. Performance is expected to be completed in accordance with the city’s specifications and timelines, with an emphasis on minimizing disruptions during deployment.

General Info

Programming, testing, and commissioning traffic signal controllers integrated with San Diego’s central traffic systems by August 11, 2026.

Agency

California → City of San DiegoView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

San Diego, CA, 92111, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260710007.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Linda Vista and Comstock Intersection Upgrade

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of San Diego
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Programming, testing, and field commissioning of traffic signal controllers and timing plans with integration into central management systems.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 541620
SLED
Stormwater and Erosion Control ComplianceThe contract titled Stormwater and Erosion Control Compliance requires the development and implementation of Stormwater Pollution Prevention Plans and Best Management Practices to ensure regulatory compliance during construction activities in Chula Vista, California, with a zip code of 91915. The work focuses on preventing stormwater contamination by establishing site-specific controls, monitoring procedures, and erosion mitigation measures aligned with environmental standards. The effort is intended to support construction projects in maintaining compliance with federal, state, and local environmental regulations throughout the project lifecycle. The contract is classified as a subcontract under NAICS code 541620, indicating it involves environmental consulting services. The solicitation was posted on July 16, 2026, with a response deadline of September 2, 2026, at 9:00 PM. Although no specific set-aside provisions or agency organizational details are provided, the contracting authority is the City of San Diego, which will oversee compliance and performance through its designated project sites in Chula Vista. All activities must be completed in accordance with required environmental safeguards, and successful bidders are expected to demonstrate expertise in site assessment, plan development, and ongoing BMP enforcement to prevent runoff pollution and soil erosion.
Environmental Consulting Services

POSTED

26 days ago

DEADLINE

in 22 days
View Details
NAICS: 238210
SLED
Otay Wtp Raw Water Ps Switchboard Replacement
Solicitation # K-27-2482-DBB-3
The contract involves the replacement of the switchboard and installation of a new standby generator with an integrated automatic transfer switch at the Otay Water Treatment Plant in Chula Vista, California, under solicitation number 20260715022. The scope includes demolition of the existing ATS shed, switchboard, foundation, and chain-link fence, followed by installation of a new switchboard with ATS, a permanent standby generator housed in a sound enclosure, underground electrical services linking the switchboard, generator, and pump house, and new fencing. Work must comply with the City of San Diego’s The GREENBOOK, The WHITEBOOK, Standard Drawings, and other state and local standards including CALTRANS specifications and the CA MUTCD. All construction must adhere to municipal codes and environmental requirements, particularly stormwater BMP compliance, with inspections and acceptance conducted on-site by City personnel using approved testing methods from California Tests and ASTM standards. The procurement follows a Lowest Price Technically Acceptable (LPTA) methodology as mandated by San Diego City Charter Section 94, meaning award will be made to the lowest responsive and responsible bidder who meets all technical and regulatory requirements without price-to-value trade-offs. Bidders must submit electronic proposals via PlanetBids by September 2, 2026, including mandatory certifications such as Debarment and Suspension, Mandatory Disclosure of Business Interests, and Contractor’s Certification of Pending Discrimination Actions within the last ten years. Offerors must also declare their business status as Small or Emerging and may claim eligibility under various socioeconomic categories including SBE, SLBE, EBE, E-LBE, MBE, WBE, DBE, DVBE, and OBE. Failure to complete any certification renders the bid non-responsive. Subcontractor substitutions without City approval are prohibited and may result in contract default. Payment will be processed through the City’s Prism® portal, with Rosa I. Riego as the primary point of contact. No formal packaging, marking, or FOB terms are specified, and the contract type is not explicitly stated, but the presence of bid bonds and performance guarantees implies a Firm Fixed Price structure. All contract requirements flow down to subcontractors, and confidentiality obligations regarding protected personal information must be strictly upheld throughout performance.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

26 days ago

DEADLINE

in 22 days
View Details