Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Traffic Striping and Legend Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Traffic Striping and Legend Installation involves providing pavement marking services for prime contractors on City of Newark pavement rehabilitation projects. The scope of work includes the application of traffic stripes, legends, and F-16 flash markers utilizing either paint or thermoplastic marking equipment. All work must be performed in strict accordance with the State of California Manual for Warning Signs, Lights and Devices for Use in Performing Work Upon Highways. The project is located in Newark, California, and falls under NAICS code 238990. Interested parties must submit their responses by the deadline of December 15, 2026. The contract was officially posted on November 12, 2026.

General Info

Subcontract for traffic striping and legend installation in Newark, California by December 15, 2026.

Place of Performance

Newark, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of CPFL 5317 (022).

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Thornton Avenue Pavement Rehabilitation Project Phase I

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Thornton Avenue Pavement Rehabilitation Project Phase I
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Newark
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Newark
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs pavement marking and striping for prime contractors on City of Newark pavement rehabilitation projects. Applies traffic stripes, legends, and F-16 flash markers using thermoplastic or paint marking equipment. Must comply with the State of California Manual for Warning Signs, Lights and Devices for Use in Performing Work Upon Highways. Delivers completed road markings.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details

More opportunities from California → City of Newark

Same awarding agency

NAICS: 237310
SLED
Thornton Avenue Pavement Rehabilitation Project Phase I
Solicitation # CPFL 5317 (022)
The City of Newark is soliciting bids for the Thornton Avenue Pavement Rehabilitation Project Phase I (Federal Project No. CPFL 5317 (022) / CIP Project No. 1366). The project scope involves comprehensive pavement rehabilitation along Thornton Avenue, including roadway surface milling, wedge grinding, localized full depth asphalt concrete base repairs, and asphalt concrete placement. The work is divided into a Base Bid spanning from the I-880 interchange to Cherry Street and Bid Alternate A spanning from Cherry Street to Olive Avenue. Additional work for Bid Alternate B involves replacing traffic loops and installing video detection units. The project has an engineer's estimate of $3.3 million and must be completed within 80 working days, with 60 days allocated for the Base Bid and 20 days for Bid Alternate A. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the Base Bid and Bid Alternate A. Requirements for bidders include a valid California Class A contractor's license, DIR registration, and evidence of financial responsibility, including references for three similar completed projects. Because the project is federally funded, contractors must adhere to Buy America requirements and pay workers according to Federal Davis Bacon Wage Rates. Mandatory documentation includes a performance bond and a labor and material bond, each for 100% of the contract price, as well as a bid bond. Compliance with the City's Construction Waste Management Plan, ADA requirements, and MUTCD standards is required. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 22 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS