This Sources Sought opportunity from Department Of Defense was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Training Range Support

Closed
PANMCC-26-P-0000034364Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, and the contractor must maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors are required to use the Textura electronic invoicing system, provide a 100 percent performance and labor bond if requested, and adhere to arcflash compliance for electrical work. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Columbus, GA, 31903, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Stewart
Contacts1 person available
OfficeFORT STEWART, GA, 31314-3324, USA
Office AddressFORT STEWART, GA, 31314-3324, USA
Contacts

Full Description

Show more

THIS IS A CURRENT DRAFT


The contractor will be required to provide materials, construction and general labor support to unit Master Breacher Training in Fort Benning GA.  


4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: 


4.1. General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Part 4 and 5 of this PWS.


4.2. Materials/Supplies/Equipment: The Contractor shall provide the following items materials, supplies, and equipment necessary to meet the requirements under this SOW. Deliverables for potential fourth courses will be communicated to the Contractor no less than 90 days prior to the beginning of a fourth course. An additional fourth course may require the procurement of additional targets, to include, but not limited to 2x vehicles. Make and model will be determined and communicated to the Contractor no less than 90 days prior to course execution. Contractor shall provide the following items materials, supplies, and equipment necessary to meet the requirements under this SOW.


8 – 4’x8’x1/4” Steel sheets for thermal cutting


8 – Flattened expanded steel sheet metal for barricades


8 – steel platers 3/8” thick 6” diameter


20 – CMU blocks


100’ chain-link fencing material


3 – 10’ Steel I-Beams of various sizes and thickness for cutting with thermal torch. 3 beam minimum.


4 - 300 cubic foot sized oxygen bottles, full.


Additional materials to complete specific tasks.


PART 5


SPECIFIC CONTRACTOR TASKS


5. SPECIFIC TASKS:


  1. Door hanger rack that will accommodate 17 doors at one time. (Door Rack Provided)
  2. Wall hanger rack that will accommodate 8 walls at one time at a minimum. (Wall Rack Provided)
  3. Construction will be required prior to and during the course. 
  4. All targets shall be set up and/or put together for an onsite inspection by the Regimental Master Breacher, no later than one working week prior to the start of a course.
  5. All wall and brick building targets shall be constructed and available for an inspection 21 days prior to their planned use during the course
  6. Contractor shall be able to re-hang the shoot house doors (twice) in approximately 48 hours or less to meet course requirements.
  7. 100’ chain link fencing will be installed per what is considered standard installation.  Fence must have anchored terminal posts throughout.  Line posts must be spaced no more than 10’ apart with a top rail attached in between. Hung fencing materials shall be hung, tensioned, and a tension wire installed along the bottom.

5.1.7. The Master Breacher targets and associated items are to be constructed or otherwise provided by the Contractor on a per course basis.  All items listed below shall be constructed or provided at the beginning of the contract and replaced when necessary to fulfill the course’s needs.  Contractor shall provide all necessary equipment and materials to complete construction of the following targets prior to the beginning of each course, to include:


  1. Heavy Demolitions area:

  1. 2 - Target vehicles.  Vehicles shall have gas tanks removed, all fluids drained, windows and tires intact, engines intact and delivered to Griswold Range at Fort Benning, GA
  2. Doors and windows to be installed in 24 Door Hanger area and MOUT Breach Facility (The following item amounts may change in quantity between courses. The COR shall provide the contractor a final request list no later than 60 days from the start of the course. Below are the approximate amounts per course.) 
    1. 4 – Medium weight doors with all hardware to include dead bolts installed with a combination of 2"x4", 2"x8" pine lumber, Minimum 3.5" hinge.
    2. 76 - Heavy fire/filled wood doors with all hardware to include dead bolts installed with a combination of 2"x4", 2"x8" pine lumber'. Minimum 4" hinge.
    3. 36 - Light metal doors with all hardware to include dead bolts installed with a combination of 2" x 4", 2"x8" pine lumber. Minimum 3.5" hinge.
    4. 20 - Heavy metal doors with all hardware to include, true door frame, dead bolts and hydraulic closing pistons installed with a combination of 2"x4", 2"x8" pine lumber, and/or 4'x8' expanded metal barricades.  Minimum 4" hinge.
    5. 10 - Heavy metal “Middle Eastern” type custom fabricated doors built to specifications (specifications available upon request).  Minimum 4" hinges, 3 per door.  No barricading for this door other than what it is constructed of.  (Attachment C) Note: The Government has the right to request design changes to the 10- Heavy metal “Middle Eastern” type custom doors, if the Government identifies another geographical type of door a new design may not exceed cost of current refabricated door
    6. 8 - "Jail Door" type custom fabricated to specifications.  (Attachment D)
  3. Door Installation Requirements.
  4. Examples of barricading methods Attachment B (more detailed of methods are available upon request).
  5. All doors shall have a minimum of a doorknob w/ locking bolt, deadbolt w/ locking bolt, and 3 hinges per door. 
    1. If doors are not fitted with doorknobs, a doorknob shall be attached to the door and a 6" or greater slide bolt shall substitute in same location of where the locking bolt would be located.
    2. If doors are not fitted with deadbolts, 6" or greater slide bolts will substitute in same location of where the deadbolt would be installed.
    3. Doorknobs shall not be attached to door on material other than the material of the actual door.
  6. The 17 Door Hangers shall be hung one time, with 24 doors, and with varying barricading.    More guidance provided upon award of contract.
  7. The MOUT Breach facility shall be hung a total of 3 times, each time having different mixture of types of doors and barricading.  The COR will provide the contractor a request list for the MOUT Breach facility.
  8. When hung, all doors shall be locked and keys removed. 
  9. Doors shall be hung to US building code standards.
  10. Doors shall have molding around edge of door, so not see past door edge.
  11. Top of door shall have a header board installed for door installation.
  12. All areas above doors in doorway shall be covered by plywood, so not to see barricading on opposite side.
  13. Railroad Ties shall NOT be used as support beams for any building or door installations.
  14. Wall Breaching Requirements.  All walls shall be built by the Contractor at least 45 days prior to the start of the course to ensure proper curing time and be available to be inspected at 1 week prior to the start of the course.  All items listed below shall be constructed or provided by the Contractor or replaced when necessary to fulfill the course needs.  All poured concrete walls and pillars will be constructed to an Industrial standard of 5,000 PSI concrete. The rebar used in the reinforced High Strength Concrete walls will be welded or tied and the size may vary ½” to 1”.  Red Brick or CMU Brick mortar lines will have a “Horizontal Joint Reinforcement” wire mesh installed to the American building code standards Additional information about wall placement in Wall Hanger training area is available upon request. These walls can be used several times over the course of the contract.
    1. 9 - 4’L x 6’H x 6” W Concrete rebar reinforced walls, placed in Wall Hanger training area.
    2. 1 - 8”x8’x8’ High Strength Concrete rebar reinforced wall
    3. 1 - 10”x8’x8’ High Strength Concrete rebar reinforced wall
    4. 1 - 12”x8’x8’ High Strength Concrete rebar reinforced wall
    5. 1 - 8’x8’ concrete filled cinder block walls. 

ii. Concrete fill shall be standard wall fill concrete. 


iii. All filled walls shall have all over spill of wall fill concrete cleaned and removed from the vertical wall surface on both sides of wall. 


All mortar lines shall be clean and smooth.  Mortar lines shall not have mortar bulging from spaces. Walls shall have a uniform vertical build.


  1. 1 - 8’x8’ unfilled cinder block walls.    
  2. 1 - 8'x8' double thickness red brick walls. 

i. One wall shall be placed in Wall Hanger training area, and one wall shall be placed in the Breach Village training area. 


(4) Race Walls built as follows:


  1. Walls shall be wood framed. 
  2. Each layer of wall material shall be liberally and securely attached to the previous layer of wall.
  3. Wall shall be built as follows starting from non-breach side to the breach side, breach side being rooms marked A and 
    1. 4'x8'x5/8" Drywall
    2. 4'x8'x3/4" Plywood
    3. 2"x4" Wood framing
    4. 4'x8' Expanded Metal
    5. 4'x8'x3/4" Plywood
    6. 4'x8'x5/8" Drywall
  4.   More detailed plans shall be made available upon request by the Contractor.

1 - 10'x10'x3' wood stud framed sheeted with 3/4"Plywood sandbag bunkers.  Roof shall be reinforced with 2"x4" (or greater) diagonal bracing from each stud to the ceiling of the bunker.  Roof needs to be able to hold approx. 1500-2000 lbs.  A door shall be cut on one side (approximately 2.5'x2.5') and shall have a 2' deep tunnel from door opening.  Wood structure shall be set no more than 1' into the ground.  Both bunkers shall be covered with 12"-18" of dirt slowly tapering off at the sides.  One bunker shall be covered with sandbags single layer thick on top of the dirt covering them (approximately 800-1000 sandbags, bags shall be filled with sand).  Bunkers shall be built to prevent water from filling the bunker.


(5) Shoulder Fired Range and Target Materials.  All items listed below shall be constructed or provided per course by the Contractor or replaced when necessary to fulfill the course needs.


  1. 2 - 10’x10'x8' unfilled cinder block building, 1 doorway with solid wood door installed, with wooden plywood roof covered with single layer of filled sandbags.  Structure shall be built by Contractor at least 30 days prior to start of course to ensure proper curing time and be available to be inspected at that time.  

4.3 Storage of target and construction materials will not be provided by the Government. Locations to store target vehicles utilized on Griswold Range will be provided by the Government.


4.4 Locations for target disposal (small debris) will be provided by the Contracting Company via dumpsters located on ranges. The Contractor shall be responsible of the removal of all debris to dumpsters. The contractor shall be responsible for the removal of all used vehicles and dumpsters from the facilities upon completion of each course.


More opportunities from Department Of Defense → W6QM Micc-Ft Stewart

Same awarding agency

NAICS: 562920
New
Federal
Recycling Services
Solicitation # W9124M27QA005
Solicitation W9124M-27-Q-A005 is a firm fixed price request for proposals for recycling services at Fort Stewart and Hunter Army Airfield, Georgia. This acquisition is set aside 100 percent for 8(a) small business concerns under NAICS code 562920. The contractor will be responsible for collecting recyclable materials from containers, processing and preparing materials for resale in local markets, and maintaining government furnished property, including the quarterly cleaning and repair of 25 percent of all containers. The period of performance begins with a one month phase in period from April 1, 2027, to April 30, 2027, followed by a base period and four one year option periods, extending the total performance through March 31, 2032. Award will be granted to the responsible offeror meeting all specifications who provides the lowest evaluated price. Evaluation is based on three factors: technical capability, past performance, and price. To be eligible, offerors must receive an acceptable rating for technical capability, which includes their approach to scheduled and unscheduled events, a 48 hour vehicle replacement strategy, and a verified equipment inventory. Past performance requires three relevant recycling references from the last three years. Offers are due by November 16, 2026, at 1:00 PM EST and must be submitted electronically via the Procurement Integrated Enterprise Environment portal. All offerors must be registered in the System for Award Management database to be eligible for award.
Materials Recovery Facilities

POSTED

6 days ago

DEADLINE

in 27 days
View Details
NAICS: 238330
Federal
IDIQ Flooring
Solicitation # W9124M26BA004
Solicitation W9124M26BA004 is a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the Department of Defense, specifically the W6QM Micc-Ft Stewart. This 8(a) Competitive set-aside under NAICS 238330 is for the removal and installation of various floor coverings, including carpet, resilient flooring, ceramic tile, and special epoxy coatings, at Fort Stewart and Hunter Army Airfield. The project magnitude is estimated between 5 million and 19 million dollars, with a performance period consisting of a base year from November 16, 2026, to November 15, 2027, and four subsequent option years extending through November 15, 2031. Bids will be evaluated solely on price and price-related factors. To be considered responsive, bidders must be active in SAM.gov, provide a bid guarantee of 20 percent of the bid price or 3 million dollars, and submit a properly signed sealed bid package. The contract mandates strict adherence to quality standards, including ASTM and TCNA guidelines, and requires prior approval of samples by the Contracting Officer. Special requirements include the use of the Wide Area WorkFlow system for invoicing, compliance with the Davis-Bacon Act for labor standards, and adherence to ADA and ABA accessibility guidelines. Additionally, the contractor must follow specific hazardous waste protocols for asbestos-containing materials and ensure all materials are delivered and stored in undamaged condition.
Flooring Contractors

POSTED

12 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS