Transportation and Economic Corridors - Invitation to Bid - TND0012201 - Hwy 2:36 - Grading, GBC, ACP, Street Light Installation, Construction of Structural Steel Girder Bridge, Construction of S.P.C.S.P. Culvert and Other Work
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to a major infrastructure project under Tender TND0012201 for transportation improvements along Highway 2:36 south of Morinville, Alberta, encompassing extensive grading, pavement construction, bridge development, and utility installations. The scope includes 279,400 cubic metres of common excavation, 1.1 million cubic metres of borrow excavation, and 270,000 cubic metres of rippable rock excavation, alongside the installation of 610 square metres of mechanically stabilized earth walls, numerous culverts of varying diameters, and 107,100 tonnes of granular base course. Asphalt concrete pavement totaling 57,000 tonnes of EPS Mix Type H2 will be laid across approximately 340,000 square metres of roadways, with additional pavement milling and cold planning conducted over 90,000 square metres. Street lighting installation comprises 61 pre-cast concrete bases, 51 standard 15-metre luminaires, and two distribution enclosures, while 732 metres of W-beam guardrail and 4,130 metres of trenching and backfilling are included. Traffic signal systems and drill seeding over 40 hectares are also specified. Construction of the structural steel girder bridge at B.F. 85214 involves 1,642 metres of H-piles, over 250,000 kilometres of reinforcing steel including stainless steel, 1,068 cubic metres of concrete (516 cubic metres Class C and 552 cubic metres Class HPC), and a full suite of structural steel fabrication, bearings, deck joints, and bridgerail systems. Waterproofing covers 2,240 square metres, and 430 tonnes of asphalt concrete will be placed on the bridge deck. The culvert replacement at B.F. 85220 includes removal of an existing structure and installation of a new S.P.C.S.P. culvert, with excavation and backfill as lump-sum items. All materials are to be supplied by the contractor, with performance requirements tied to compliance with Alberta Transportation specifications. The solicitation opens on May 27, 2026, with submissions due by July 30, 2026 at 2:01 p.m. MST, and the project must be completed by August
General Info
Agency
NAICS
Place of Performance
Alberta, CANSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed