Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transportation and Economic Corridors - Invitation to Bid - TND0023901 - Selective Grading, GBC, Full Depth Reclamation, Cold Milling, ACP, Culvert Replacement, Concrete Repairs, Milled Rumble Strips, Street Light Installation and Other Work

Closed
AB-2026-05070International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, asbestos abatement, tunneling, boring, underground piping, asphalt and concrete paving, electrical work, and various site support services including traffic control and security. Bidders must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100% of their contract value, with Kiewit reimbursing the bond premiums. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms to maintain labor harmony and adhere to collective bargaining agreements with various trades. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating strict compliance with DBE Program requirements. Interested firms must provide certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bid packages and invitations are managed through the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Tender TND0023901, issued by Alberta Transportation and Economic Corridors, invites bids for a comprehensive roadway construction and rehabilitation project along a segment of the Westbound and Eastbound Legacy route, spanning approximately 32.21 kilometres from 680 metres east of Rge Rd 185 to the Highway 16 WB ramps. The scope includes selective grading, granular base course placement, full depth reclamation, cold milling of asphalt pavements at three different depths, installation of new asphalt concrete pavement using EPS mix types S3 and H2, replacement of smooth wall steel culverts, concrete curb and gutter removal and replacement, sidewalk construction, street light installation, guardrail and bridge approach rail upgrades, milled rumble strips, and roadway striping. All materials must be supplied by the contractor, with approximate quantities outlined including over 174,000 tonnes of aggregate, 108,000 tonnes of asphalt concrete, and significant volumes of excavation and base materials. The project requires strict adherence to technical specifications and performance standards set by the authority. The tender must be submitted electronically via email to trans.tender@gov.ab.ca no later than 2:01 p.m. MST on Friday, August 7, 2026, following a mandatory pre-tender meeting on Monday, July 27, 2026, conducted virtually over Microsoft Teams. Questions regarding the tender should be directed to Ikhtiyar Mammadov, Manager of Engineering Services Procurement. The contract is scheduled to be fully completed by July 31, 2028, and all work must be performed within the designated kilometre ranges specified for each construction phase. Bidders are required to account for traffic accommodation as a lump sum item and must comply with all provincial and federal regulations governing transportation infrastructure work in Alberta. This is a government procurement under the jurisdiction of the Government of Canada with no set-aside provisions.

General Info

Alberta Transportation tender for 32.21 km roadway construction with asphalt, culverts, sidewalks, and lighting, due August 7, 2026, completion by July 31, 2028.

Agency

Government of Canada → Transportation and Economic CorridorsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Transportation and Economic Corridors
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Transportation and Economic Corridors
View Agency Profile
Office AddressN/A
Contacts
Ikhtiyar MammadovContracting Authority

Full Description

Show more
Tender available date: Monday, July 13, 2026. Tender closing date: Friday, August 7, 2026. Pre-Tender Meeting: Monday, July 27, 2026 at 1:30 p.m. MST virtually over MS Teams. Project Inquiries: Ikhtiyar Mammadov, Manager, Engineering Services Procurement, Alberta Transportation and Economic Corridors. E-mail: Ikhtiyar.Mammadov@gov.ab.ca. TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0023901 Selective Grading, Granular Base Course (GBC), Full Depth Reclamation, Cold Milling, Asphalt Concrete Pavement (ACP), Culvert Replacement, Concrete Repairs, Milled Rumble Strips, Street Light Installation and Other Work 16:04 to 06, From 680m East of Rge Rd 185 to East of Rge Rd 170 kilometre 45.995 to 49.551 (WBL) kilometre 0.000 to 15.300 (WBL) 16:06, From West of Rge Rd 180 to McLeod River Bridge kilometre 4.800 to 17.300 (EBL) 47:06, From South of West Fraser Lumber Mill to Highway 16 WB Ramps kilometre 57.600 to 58.635 (EBL,WBL,NBL,SBL) NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation 164,520 Tonne Supply of Aggregate - No Option 71,500 Cubic Metre Common Excavation 10,400 Cubic Metre Borrow Excavation - Contractor Supplied 174 Metre Smooth Wall Steel Pipe - Supply and Install (750 mm dia.) 96,300 Square Metre Topsoil Placement 3,300 Tonne Granular Fill Des. 6 Class 80 34,600 Tonne Granular Base Course Des. 2 Class 25 4,813 Metre Concrete Curb and Gutter - Remove and Dispose 2,051 Square Metre Concrete Surface - Remove and Dispose 4,564 Square Metre Asphalt Surface - Remove and Dispose 2,660 Metre Curb and Gutter (150 mm Curb Height, 300 mm Gutter Width) 2,153 Metre Monolithic Sidewalk, Curb and Gutter (1.8 m Width) 1,410 Square Metre Solid Concrete Islands 1,380 Square Metre Solid Concrete Medians 151,600 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth 40,160 Square Metre Cold Milling Asphalt Pavement - 100 mm Depth 65,280 Square Metre Cold Milling Asphalt Pavement - 180 mm Depth 44,920 Square Metre Full Depth Reclamation 17,000 Tonne Asphalt Concrete Pavement – EPS Mix Type S3 (PG 64-37P) 108,200 Tonne Asphalt Concrete Pavement – EPS Mix Type H2 (PG 64-37P) 32.21 Kilometre Roadway Lines - Supplying Paint and Painting 1,950 Metre Strong Post W-Beam Guardrail - Supply and Install 19 Unit Bridge Approach Rail Transition 5 Unit Pre-Cast Concrete Street Light Base - Supply and Install 5 Unit Street Light Standard - Supply and Install (13.1 m Davit) Contractor to supply all materials. Contract Completion Date: July 31, 2028.