Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transportation and Economic Corridors - Invitation to Bid - TND0024319 - Concrete Repairs, Cold Milling, Asphalt Concrete Pavement, Pedestrian Actuated Crosswalk Signal Installation, Traffic Signal Installation and Other Work

Closed
AB-2026-04045Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026This contract encompasses a wide range of pavement and infrastructure work to be performed across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. The scope includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping of existing pavement markings, surface preparation for new striping, various paint markings, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road water drainage systems, some of which may require permits. All work must comply with applicable standards and be executed at various port-wide sites as needed. The contract is titled Asphalt Paving & Striping Portwide Unit Price 2026 and is forecasted for issuance under NAICS code 237310. It is managed by the Port of Seattle through its Port Construction Services division, with Heather Bowden as the primary point of contact and Lesley Miles serving as Project Manager. The solicitation is posted on the Port’s online portal and is intended to establish unit pricing for ongoing and future work at the port’s facilities, enabling efficient task order execution without a formal bidding process at the time of individual job requests. Work is expected to begin in 2026 and will be performed on an as-needed basis across the port’s extensive property network.
Port Construction Services

POSTED

about 1 hour ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract for TND0024319 encompasses a comprehensive roadway rehabilitation and traffic improvement project located between kilometre 17.54 and 19.58 along the north central region of Alberta, specifically west of Highway 41 to north of Highway 659 within the Town of Bonnyville. The scope includes concrete repairs, cold milling of 37,000 square metres of existing asphalt pavement, placement of 5,050 tonnes of EPS mix type H2 asphalt concrete using PG 58-28 binder, installation of 468 metres of 150 mm high curb and gutter, supply and installation of 5,300 metres of durable lane line striping, and the supply and installation of three fully integrated traffic signal systems at 46 Street, 50 Street, and 55 Street. Additionally, the contractor must provide and install a pedestrian actuated crosswalk signal system, along with all associated materials and labor for other incidental work required to complete the project. All materials must be supplied by the contractor and meet specified standards. Tenders must be submitted via email only to trans.tender@gov.ab.ca no later than 2:01:00 p.m. on Thursday, June 25, 2026, with inquiries directed to Bijhan Chaglani, Project Procurement Officer at Alberta Transportation and Economic Corridors. The project is issued under solicitation number AB-2026-04045 and falls under NAICS code 237310 for highway and street construction. The contract has a fixed completion date of July 15, 2027, requiring timely execution of all work phases. The solicitation is open without set-aside provisions and is administered under the Government of Alberta’s transportation infrastructure program, with no indication of federal jurisdiction despite the agency name listing.

General Info

Bid for Alberta Bonnyville road repairs, crosswalks, traffic signals; submit by June 25, 2026.

Agency

Government of Canada → Transportation and Economic CorridorsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Transportation and Economic Corridors
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Transportation and Economic Corridors
View Agency Profile
Office AddressN/A
Contacts
Bijhan ChaglaniContracting Authority

Full Description

Show more
Tender available date: Tuesday, May 26, 2026. Tender closing date: Thursday, June 25, 2026. Project Inquiries: Bijhan Chaglani, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Bijhan.Chaglani@gov.ab.ca. TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0024319 Concrete Repairs, Cold Milling, Asphalt Concrete Pavement, Pedestrian Actuated Crosswalk Signal Installation, Traffic Signal Installation and Other Work 28:18 W. of Hwy 41 to N. of Hwy 659 within the Town of Bonnyville kilometre 17.54 to 19.58 NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 468 Metre Curb and Gutter (150 mm high, 250 mm gutter) 37,000 Square Metre Cold Milling Asphalt Pavement - 50 5,050 Tonne Asphalt Concrete Pavement – EPS Mix Type H2 (PG 58-28) 576 Metre Supply of Piling - Plain Steel H-Pile 5,300 Metre Durable Lane Line - Supply and Install 1 Lump Sum Traffic Signal System - Supply and Install - 46 Street 1 Lump Sum Traffic Signal System - Supply and Install - 50 Street 1 Lump Sum Traffic Signal System - Supply and Install - 55 Street Contractor to supply all materials. Contract Completion Date: July 15, 2027.