Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transportation and Economic Corridors - Invitation to Bid - TND0025459 - BF70510, Construct Steel Truss Bridge, Demolish Existing Bridge Structure and Other Work

Closed
AB-2026-03966International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE) and Veteran-Owned Small Business Enterprises (VSBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The comprehensive scope of work includes site preparation, asbestos abatement, tunneling, utility installation, asphalt and concrete paving, electrical work, and the supply of various construction materials. To be eligible, firms must provide certification through the Department of General Services and the Port of Long Beach PlanetBids portal, hold a valid California Contractor’s license, and provide acceptable insurance. Subcontractors may be required to provide bonding for 100 percent of their contract value, with premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring onsite firms to be signatory to collective bargaining agreements with various trades to maintain labor harmony. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements. Interested parties must contact the lead estimator to receive an Invitation to Bid via the BuildingConnected system. The deadline for responses is September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Alberta Transportation and Economic Corridors is inviting bids for the construction of a steel truss bridge over the Rosebud River, located approximately one kilometer southwest of Rosedale along Highway 10X:02 at kilometre 4.170 to 4.550. The project involves demolishing the existing bridge structure, excavation of the river channel, supply and installation of 576 meters of plain steel H-piles, and the placement of approximately 63,301 kilograms of reinforcing steel, including both plain and corrosion-resistant types. The work includes the supply and fabrication of structural steel for the truss, its assembly and erection, and metalizing of the steel components. Additionally, the contractor must supply and place 270 cubic meters of Class C concrete and 190 cubic meters of high-performance concrete, along with associated roadway work. All materials must be provided by the contractor, and a lump sum will cover traffic accommodation during construction and the demolition and disposal of the existing bridge. Bids must be submitted via email to trans.tender@gov.ab.ca no later than 2:01 p.m. on Tuesday, June 23, 2026, with inquiries directed to Bijhan Chaglani at Bijhan.Chaglani@gov.ab.ca. The contract must be completed by October 15, 2027.

General Info

Construction of steel truss bridge over Rosebud River, Alberta; demolition, steel supply, concrete, completion 2027.

Agency

Government of Canada → Transportation and Economic CorridorsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Transportation and Economic Corridors
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Transportation and Economic Corridors
View Agency Profile
Office AddressN/A
Contacts
Bijhan ChaglaniContracting Authority

Full Description

Show more
Tender available date: Friday, May 22, 2026. Tender closing date: Thursday, July 2, 2026. Project Inquiries: Bijhan Chaglani, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Bijhan.Chaglani@gov.ab.ca. TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0025459 Construct Steel Truss Bridge, Demolish Existing Bridge Structure and Other Work 10X:02 B.F. 70510 - Carrying Hwy 10X:02 over Rosebud River, 1 km SW of Rosedale kilometre 4.170 to 4.550 CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 1 Lump Sum Demolition and Disposal of Bridge Structure 1 Lump Sum Excavation – Channel 576 Metre Supply of Piling - Plain Steel H-Pile 36 Pile Pile Set-up (Driven Piles) 25,174 Kilogram Plain Reinforcing Steel – Supply 35,048 Kilogram Corrosion Resistant Reinforcing Steel – Supply 63,301 Kilogram Reinforcing Steel - Place 270 Cubic Metre Concrete (Class C) - Supply and Place 1 Lump Sum Truss Structural Steel - Supply and Fabrication 1 Lump Sum Truss Structural Steel - Assembly and Erection 1 Lump Sum Structural Steel - Metalizing 190 Cubic Metre Concrete (Class HPC) - Supply and Place 1 Lump Sum Roadway Work Contractor to supply all materials. Contract Completion Date: October 15, 2027.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS