Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Transportation and Economic Corridors - Request for Proposal - CON0024769 – Engineering Consultant Services for BF77212-1, Concrete and/or Asphalt Overlay with/without Water Proofing Membrane

Active
AB-2026-06741International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Alberta Transportation and Economic Corridors is seeking proposals for engineering consultant services regarding the rehabilitation of the Strawberry Creek Bridge on Highway 622 at the north boundary of Telfordville, Alberta. The scope of work includes preliminary engineering, detailed design, contract tendering, contract administration, construction and fabrication supervision, and post-construction and warranty inspections for concrete and/or asphalt overlay, potentially including a waterproofing membrane. This is a restricted solicitation open only to prequalified consultants, specifically AECOM Canada ULC, Most Engineering (2001) Ltd., and Mott MacDonald Canada Ltd. Interested firms must submit their proposals in two separate PDF files, consisting of a qualification submission and a fee proposal, each under 10MB. The selection process will prioritize the best overall value rather than the lowest cost, and the deadline for responses is November 7, 2026.

General Info

Engineering services for Strawberry Creek Bridge rehabilitation; proposals due November 7, 2026.

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTransportation and Economic Corridors
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Ikhtiyar MammadovManager, Engineering Services Procurement

Full Description

Show more
This RFP is only available to the following short-listed Proponents: The List of Prequalified Consultants to be invited to participate in this RFP is taken from RFEI 2026-05 Ranking List. - AECOM Canada ULC - Most Engineering (2001) Ltd. - Mott MacDonald Canada Ltd. Any submission received from others will be returned without review. Alberta Transportation and Economic Corridors requests the submission of proposals for: BF77212-1 CONCRETE AND/OR ASPHALT OVERLAY WITH/WITHOUT WATER PROOFING MEMBRANE 622:02 STRAWBERRY CREEK BRIDGE ON HIGHWAY 622 AT NE BOUNDARY OF TELFORDVILLE, AB Preliminary Engineering, Detailed Design, Contract Tendering, Contract Administration, Construction and Fabrication Supervision, Post Construction and Warranty Inspection for Major Bridge Structure Rehabilitation and Other Work. THE PROPOSAL MUST BE SUBMITTED IN TWO SEPARATE FILES: PART ONE (QUALIFICATION SUBMISSION) AND PART TWO (FEE PROPOSAL), PDF DOCUMENTS BOTH LESS THAN 10MB IN SIZE. No payment will be made by Alberta Transportation and Economic Corridors for costs incurred in the preparation or submission of this proposal. Selection of the Consultant will be based on the best overall value to Alberta Transportation and Economic Corridors and not necessarily the lowest cost estimate.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
QBS/PS/DOT/2610-1270098 PATH Lakewood
Solicitation # PE-66062-NONST-2027-000000503
The City of Atlanta, in partnership with the PATH Foundation, is soliciting a qualified consultant for the design of a paved shared use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The project is structured in two phases, with the current focus on Phase I, which extends from the Southside Trail to Pryor Road at Meldon Avenue. The selected consultant will be responsible for reviewing and validating the 2021 concept report, preparing preliminary and final design plans, and developing the necessary NEPA documentation. The scope also includes extensive stakeholder engagement, including a Public Information Open House and multiple stakeholder meetings, to ensure the design accounts for public feedback and the needs of users with disabilities. This is a master contract delivered via task orders with a base period of three years and a one-year renewal option. The project timeline begins with a Notice to Proceed in Q3 2026, with final construction plans expected to be ready for bidding by Q1 2030. All design work must comply with GDOT Engineering Design Guide and Project Planning Guide standards, as well as the GDOT Plan Development Process and FHWA Grant Agreements. Evaluation of consultants will be based on their experience designing off-system paved trails in Atlanta and Georgia, their ability to manage budgets, their collaboration with the PATH foundation, and their capacity to produce high-quality technical plans. Key personnel required for the project include a Project Manager and leads for Roadway Design, Environmental/NEPA, and Stakeholder Engagement.
City of Atlanta

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
SLED
TxDOT Aviation Division- Notice to Consultants
Solicitation # RFQ26ALCMRCE00015
The Texas Department of Transportation Aviation Division is soliciting qualifications from professional firms to develop an Airport Layout Plan (ALP) with Narrative for the Commerce Municipal Airport. The scope of work is divided into three primary phases: a kick-off phase focused on strategic planning and public outreach, Phase I covering aviation demand forecasts and planning standards, Phase II addressing land use alternatives and facility requirements, and Phase III involving the final development plan, Capital Improvement Plan (CIP), and an 18B Obstruction Survey. All work must comply with the latest FAA Master Plan Advisory Circular and specific TxDOT Standard Operating Procedures. Interested firms must submit a Qualifications Statement of no more than nine pages via the TxDOT Aviation eGrants system by November 10, 2026, at 2:00 PM CST. Selection will be based on a 100-point scale evaluating capability and qualifications, recent experience with comparable airport plans, performance reliability, and the proposed technical approach and schedule. Mandatory submission requirements include a written certification regarding the National Defense Authorization Act and the Department of Commerce's foreign adversaries list. The selected firm will subsequently enter a fee proposal and negotiation phase to establish the final contract value.
Texas Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Transportation and Economic Corridors

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS