Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on April 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Travaux de réaménagement de la salle 3 - Ajout d'un accélérateur linéaire CICL

Closed
20139772International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe contract seeks a contractor to deliver comprehensive design, permitting, and construction services for replacing the Checkpoint 5 security grill at the Port of Seattle. The scope encompasses a full lifecycle approach beginning with site assessment and continuing through the preparation of design drawings and specifications that comply with TSA CRPG Section 3-5 standards. The contractor must submit all documentation for regulatory review and secure necessary permits, followed by the safe removal and proper disposal of the existing grill. New system fabrication and installation are required, with seamless integration into existing structural, electrical, and security badge access systems. All work must be conducted with strict attention to operational continuity, minimizing disruption to airport security functions. Coordination with multiple stakeholders is mandatory to ensure compliance with federal, state, and local regulations while maintaining the integrity of the airport’s security posture. The procurement is classified under NAICS code 236220 for commercial and institutional building construction and is managed by the Aviation Project Management Group under the Port of Seattle. Primary contact for inquiries is Yanet Maldonado, with Collette Deardorff serving as the project manager. The opportunity was posted on July 26, 2026, and the contract is structured under a design-bid-build delivery method. All work must be performed at the port’s facility, with no specified set-aside provisions. Contractors are expected to engage proactively with project representatives to align on timeline, quality, and compliance requirements throughout all phases of the project.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 236220
New
SLED
Rental Car Facility (RCF) Customer Service Building (CSB) Re-DemisingThe Port of Seattle’s Aviation Project Management Group is preparing to revise the base building infrastructure of the Rental Car Facility Customer Service Building to support a new Concession Agreement and enable tenant construction commencing June 1, 2027. The scope includes updating wayfinding signage to reflect new tenant locations, constructing a new break room and flex space for transit operations, renovating existing restrooms in the Customer Service Building, replacing outdated car wash equipment in the Quick Turn Around areas, installing new expansion joints on the 5th Floor plaza areas, and performing structural repairs to address cracking and repair post-tensioned cables. These upgrades are designed to modernize facility functionality and ensure compliance with future operational demands under the upcoming concession arrangement. All work is centered on the Customer Service Building within the Rental Car Facility, with the Port of Seattle acting as the contracting authority. The solicitation is currently forecasted, with no formal solicitation number assigned yet, and the NAICS code 236220 indicates commercial and institutional building construction. Primary point of contact is Angela Peterson, with Julia Ruzon serving as Project Manager. Interested parties should monitor the official Port of Seattle portal for formal solicitation release, as this project represents a significant capital improvement initiative aimed at enhancing tenant experience and long-term facility integrity.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 236220
New
Federal
RFQ 19KU2026Q0013 - AEWA Door & Tile Installation Upgrade projectThe RFQ 19KU2026Q0013 seeks qualified contractors to perform the AEWA Door & Tile Installation Upgrade project at the U.S. Embassy in Kuwait under a fixed-price contract award, with selection based on the lowest technically acceptable bid. A mandatory site visit is scheduled for August 5, 2026, at 09:30 AM Kuwait time, and failure to conduct a thorough on-site assessment prior to submission renders the contractor fully responsible for any errors, omissions, or cost miscalculations in the proposal, including the Bill of Materials and Bill of Quantities. All quotations must be submitted electronically by August 16, 2026, at 10:00 AM Kuwait local time, with emails titled correctly to ensure proper processing. Proposals must include the completed SF-1442 form, pricing in Section A, all required representations and certifications in Section L, and supporting documentation from Attachment A and other applicable sections. Offerors must either hold an active SAM registration and provide their Unique Entity Identifier or, if not registered, complete FAR 52.204-90, with the requirement to update this annually if option periods are exercised. Questions must be submitted by August 8, 2026, at 10:00 AM Kuwait time; no inquiries will be accepted after this deadline. The project falls under NAICS code 236220 and is administered by the U.S. Department of State through the Embassy in Kuwait, with no set-aside provisions applied.
US Embassy Kuwait

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
Federal
Z2DA--FY27 NRM | 557-23-104 | Replace Boiler Plant Steam Boilers | Construction (VA-27-00003633)The Department of Veterans Affairs, through Network Contracting Office 07, is conducting market research for the replacement of three steam boilers at Building 27 of the Carl Vinson VA Medical Center in Dublin, Georgia. This project, classified under NAICS code 236220 with a magnitude between $20 million and $50 million, will require a contractor to manage and execute the full scope of construction work including hazardous material abatement, demolition of existing systems, installation of new boilers, piping, fuel tanks, emergency generators, and related site work—all in accordance with design drawings and specifications provided by an independent Architect-Engineer. The work must comply with all federal, state, and local regulations, and wage determinations for Laurens County, Georgia will apply. The project is anticipated to be awarded as a firm-fixed-price contract following a competitive process, either through an RFP under FAR Part 15 or an IFB under FAR Part 14, with the final procurement method to be determined after market research. The performance period is set at 730 days from the Notice to Proceed, and the contract is planned to be set aside exclusively for Service-Disabled Veteran Owned Small Businesses. Interested contractors must submit a capabilities statement no longer than four single-spaced pages in a single PDF under 4MB, including company details, UEI, size certification under NAICS 236220, bonding capacity sufficient for the project value, and evidence of past performance on at least three comparable medical facility construction projects completed within the last seven years. Submissions must include specific project names, owners, contact information, dollar values, start and completion dates, and a description of technical expertise and key personnel relevant to the scope. Responses must be emailed as a properly formatted PDF by August 7, 2026, at 3:00 PM EST to the designated VA contacts with the correct subject line reference. No bids or proposals are being solicited at this time; this is purely a market research effort, and respondents should not expect evaluation feedback, reimbursement, or a solicitation unless posted on SAM.gov in the first quarter of FY27. Hard copies and phone inquiries are not accepted, and compliance with submission guidelines is mandatory for consideration.
247-NETWORK Contract Office 7 (36C247)

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Centre intégré de santé et de services sociaux (CISSS) de Laval is seeking a general contractor for the complete redevelopment of Room 3 at the Hôpital de la Cité-de-la-Santé in Laval, involving the installation of a linear accelerator. The project requires adherence to detailed architectural, mechanical, electrical, and structural plans, with strict attention to maintaining hospital operations since the facility remains active 24/7 throughout construction. Contractors must carefully coordinate work phases, service interruptions, and temporary installations in compliance with hospital-specific safety and infection control measures. Work is scheduled mainly between 7 a.m. and 6 p.m. for non-disruptive tasks, with more intrusive activities restricted to evenings and weekends. Coordination with the hospital’s technical services department is mandatory at least five business days before any service interruption, which will occur without extra compensation. The contract stipulates a strict 12-week deadline from the authorized site mobilization with no pauses allowed due to logistical or labor issues. The contractor is responsible for detailed scheduling, including bar-chart timelines and critical path analysis, to ensure minimal interference with clinical activities. All permits, demolition, temporary works, containment measures, and waste management fall under the contractor’s scope, alongside daily and final site cleaning. A construction office will not be provided on site; if needed, space for a trailer must be arranged and funded by the contractor. Security protocols prohibit any contact between workers and hospital clients, and the site must be securely fenced and locked outside working hours. Submission of bids is due by May 7, 2026, with a non-mandatory site visit scheduled for April 23, 2026. Award will be granted to the compliant lowest bidder, who must also provide bid and performance guarantees. All inquiries must be submitted in writing to the designated contract authority.

General Info

CISSS Laval seeks contractor for 12-week linear accelerator room redevelopment with strict hospital operation coordination.

Agency

Government of Canada → Centre intégré de santé et de services sociaux de LavalView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Laval, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Centre intégré de santé et de services sociaux de Laval
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Centre intégré de santé et de services sociaux de Laval
View Agency Profile
Office AddressN/A
Contacts
Ka TamaraContracting Authority

Full Description

Show more
Nom de l’Organisme public : Centre Intégré de Santé et Services Sociaux de Laval Numéro de l’appel d’offres : 2025-0775-AO Titre : Travaux de réaménagement de la salle 3 – Ajout d’un accélérateur linéaire Description : Le Centre intégré de santé et de services sociaux (CISSS) de Laval lance un appel d'offres public pour la sélection d'un entrepreneur général. Ce projet vise principalement l’exécution complète de tous les travaux pour l’ajout d’accélérateur linéaire, à l’Hôpital de la Cité-de-la-Santé de Laval, située au 1755, boul. René-Laennec à Laval. L’entrepreneur doit aussi se référer aux plans et devis complets (architecture, mécanique, électricité et structure) pour déterminer l’ampleur précise des travaux et des mesures de protection requises. L’entrepreneur doit prendre en considération que ce bâtiment est un hôpital qui demeure occupé pendant la durée des travaux. Les activités du bâtiment sont en continues 24h/24, 7 jours par semaine. Pour assurer une cohabitation permettant la continuité des soins, l’entrepreneur devra prendre connaissance des méthodes à suivre pour le phasage des travaux, les coupures de services, les installations temporaires et autres instructions spécifiques à un ouvrage en milieu hospitalier. Se référer aux documents suivants : Clauses complémentaires au contrat, (i.e. « CCC »), régie et contrat. ** Vous ne devez en aucun cas entrer en contact avec la clientèle ** Les travaux consistent à, mais sans s’y limiter : · La fourniture de tous les permis autres que celui pour construction requis, incluant les documents afférents; · La démolition des éléments; · Les travaux temporaires; · Les travaux de confinements relatifs à la lutte contre les infections; · Les travaux de confinements relatifs à la sécurité des usagers; · Les percements; · La coordination des travaux selon le phasage et l’échéancier à être fourni par l’entrepreneur ; · Participer aux réunions hebdomadaires avec le chargé de projet et autres rencontres sur demande; · L’enlèvement des déchets; · Le nettoyage journalier et final du chantier; · La fourniture des documents relatifs à la documentation et la fermeture duchantier. Horaire des travaux : Les travaux qui ne perturbent pas les activités périphériques de l’établissement pourront se faire pendant les heures suivantes, soit entre 7h00 et 18h00. Les autres travaux devront se faire le soir et les fins de semaines. Aucune tolérance ne sera acceptée avant ou après ces heures de travail. Les interruptions de service devront être coordonnées avec le département du service technique au moins 5 jours ouvrables avant l’intervention. Toutes les coupures de service se feront de soir, de nuit ou de fin de semaine, dépendant des impacts sur le fonctionnement des services et des opérations courantes, sans frais compensatoires pour l’Entrepreneur. (ANNEXE I) Échéancier des travaux : Le respect de l’échéancier est de l’essence même du présent contrat. Le délai contractuel des travaux est de (12) semaines à partir de la mobilisation au chantier, excluant les vacances et congés fériés. La date de mobilisation au chantier doit être autorisée par le chargé de projet du CISSS de Laval. Le chantier doit être en continue, aucun arrêt ne sera accepté pour raison de logistique, ou manque de main d’œuvre, par conséquent la mobilisation au chantier débutera dès la disponibilité de tous les matériaux. Dès l’adjudication du contrat, l’Entrepreneur doit préparer et présenter les dessins d’atelier, donner ses commandes et préparer l’échéancier de référence (Baseline) des travaux qui doit être approuvé par les professionnels et le chargé de projet du CISSS de Laval, 5 jours avant la réunion de démarrage. Aucune demande de paiement ne sera traitée ou même acceptée, si l’échéancier mis à jour n’est pas envoyé. Un journal de chantier doit accompagner chaque demande de paiement. L’entrepreneur doit réaliser un échéancier (se référer à la clause « échéancier » du contrat) détaillé illustrant la totalité des travaux jusqu‘à leur réception sans réserve. Il devra être présenté sous forme de diagramme à barres horizontales (GANTT), chaque barre représentant une activité. L’échéancier devra montrer les liens entre les tâches et identifier les activités correspondant au cheminement critique du projet de façon distincte. Chaque activité doit être scindée et détaillée en tenant compte de l’ordre logique des travaux. Chaque spécialité devra être détaillée. À titre d’exemple, la construction de béton devra être découpée de semaine en semaine en détaillant chaque activité; excavation, démolition de l’escalier, remblai sous fondation, compaction, coffrage, armature, décoffrage, démolition des panneaux de béton, bétonnage, périodes de cure, etc. Ceci permettra d’identifier les périodes pendant lesquelles l’entrepreneur pourra fonctionner selon les heures normales, sans dérangement sur les activités cliniques en périphérie limitrophes. Il en est de même pour toutes les activités. Un échéancier montrant une ligne continue du début à la fin (en plomberie ou en électricité par exemple) sera refusé. Note : Aucune réclamation de prolongation de chantier NE sera acceptée si l’échéancier des travaux est à l’intérieur du délai contractuel. Bureau de chantier : Aucun bureau chantier ne sera disponible dans les lieux de travail. Si nécessaire, un emplacement pour une roulotte de chantier, aux frais de l’Entrepreneur, pourra être coordonné avec le service technique ou le chargé de projet. Autres directives : Les ouvriers ne doivent en aucun cas entrer en contact avec la clientèle du centre par mesure de sécurité. Le site doit être sécurisé avec une clôture de chantier. Son accès doit être possible que pour les ouvriers, la clôture de chantier doit être cadenassée en dehors des heures de travail de l’entrepreneur. Visite des lieux : Une visite des lieux non obligatoire est prévue le 23 avril 2026 à 10h. Le point de rassemblement pour cette visite est fixé à l’entrée principale de l’hôpital Cité-de-la Santé au RDC, 1755 Bd René-Laennec, en la ville de Laval, province de Québec, H7M 3L9. L’adjudication sera faite au SOUMISSIONNAIRE présentant le prix le plus bas tout en étant conforme aux exigences. Sûretés : Garantie de soumission : oui Garantie d’exécution : oui Accords de libéralisation des marchés publics applicables : Accord Québec-Ontario (ACCQO) Accord de Libre-échange canadien (ALEC) Demande d’information : Afin d’assurer l’uniformité d’interprétation des documents d’appel d’offres et de faciliter l’échange d’information, les soumissionnaires qui désirent recevoir de l’information ou des précisions au regard de l’appel d’offres doivent obligatoirement le faire par écrit en communiquant avec la personne responsable du dossier. Identifier votre courriel comme suit : 2025-0775-AO_Travaux de réaménagement de la salle 3 – Ajout d’un accélérateur linéaire - Personne-ressource : Tamara Ka - Courriel : tamara.ka.cissslav@ssss.gouv.qc.ca Documents : Les personnes intéressées peuvent se procurer les documents d’appel d’offres que par l’intermédiaire du système électronique d’appel d’offres SÉAO (www.seao.ca) Réception (dépôt) des soumissions: Les soumissions seront reçues à la date et à l’endroit suivants : Date: 2026-05-07 Heure: 10h00 Endroit Service des approvisionnements : Bureau R-35 Adresse Hôpital Juif de réadaptation 3205, Place Alton-Goldbloom Laval (Québec) H7V 1R2 Important: Le Centre intégré de santé et des services sociaux de Laval ne s’engage à accepter ni la plus basse ni aucune des soumissions reçues.