Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TRAVAUX DE RÉHABILITATION DES STATIONS DE POMPAGE PRINCIPALE, DAOUST ET SOPHIE

Closed
20142148International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is governed by EJCDC standard general and supplementary conditions. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide bid security equal to 5 percent of their maximum bid price and are required to furnish performance and payment bonds upon award. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the owner. Quality assurance is maintained through rigorous inspection standards, including compliance with AWS, SMACNA, NEMA, and ASTM specifications.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Les travaux de réhabilitation des stations de pompage principales Daoust et Sophie comprennent l’ensemble des activités nécessaires à la rénovation complète des infrastructures, incluant la démolition des dalles en béton existantes, la gestion des eaux de surface et souterraines par pompage temporaire, l’installation de nouveaux postes de pompage et de conduites de refoulement, ainsi que la construction de nouvelles dalles en béton. L’entrepreneur doit organiser et sécuriser le chantier, installer la signalisation appropriée, protéger l’environnement, gérer les excavations et les déchets, déboiser le site si nécessaire, et assurer la réfection des surfaces paysagères, y compris les zones gazonnées, ensemencées et en lit de cailloux. Tous les travaux doivent être exécutés conformément aux plans et devis, avec une responsabilité totale de la qualité, de la sécurité et de la conformité aux normes du métier. L’entrepreneur est tenu d’étudier et d’implémenter les méthodes d’exécution, de concevoir les installations provisoires, de fournir tous les matériaux et équipements requis, et de respecter strictement les lois et réglementations en matière de santé et sécurité au travail. La mise en service des équipements, les nettoyages et essais des conduites, ainsi que la réfection générale des lieux font également partie intégrante des obligations contractuelles.

General Info

Rehabilitation of pumping stations in Montérégie, including construction, site preparation, environmental protection, and compliance.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 2, 2026 to Jun 8, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Municipalité des Cèdres
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Barcelo PhilippeContracting Authority

Full Description

Show more
Sans s’y limiter, les travaux consistent à : - L’organisation du chantier; - La sécurité du chantier; - L’implantation de la signalisation des entraves et des chemins de détour; - La protection de l’environnement; - La gestion des eaux de surface et souterraines, incluant le pompage; - L’installation d’un réseau du pompage temporaire des eaux domestiques; - La protection du site, incluant le déboisement; - La démolition des dalles en béton; - La disposition des surplus d’excavation; - La construction de dalles en béton; - L’installation de postes de pompage et conduite de refoulement; - Le nettoyage et les essais sur les conduites et structures; - La mise en service des équipements; - L’aménagement et la réfection des surfaces gazonnées, ensemencées et en lit de cailloux; - La réfection des lieux. Les travaux comprennent également tous les travaux connexes nécessaires au parachèvement de l’ouvrage selon les plans et devis. L’Entrepreneur est également responsable de : - L’étude et la mise en oeuvre des méthodes d’exécution incluant les étançonnements lorsque requis; - La planification, l’organisation la direction et le contrôle de l’exécution des travaux de façon à s’assurer qu’ils soient conformes à l’usage auquel ils sont destinés et exécutés suivant les règles de l’art; - L’étude et l’établissement des installations de chantier et ouvrages provisoires; - L’approvisionnement des matériels et matériaux de toute nature, nécessaires à la réalisation complète et conforme des ouvrages et fournitures faisant l’objet du contrat; - La prévention en matière de santé et sécurité sur le chantier de construction et conformité avec les lois et règlements en vigueur; - L’implantation des travaux; - La qualité des travaux exécutés, de la réalisation des essais de performance et du contrôle qualité pour s’assurer de la conformité des travaux exécutés avec les plans et devis et d’en faire la démonstration.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS